Site-work prices, Bluefield County, VA
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 2 | $173.50 | $162.00 to $185.00 | Bids- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $185.00 per TON · qty 1917.0 · bid tab
- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $162.00 per TON · qty 1190.0 · bid tab
|
| inlet headwall | EA | 5 | $10,000.00 | $2,500.00 to $12,000.00 | Bids- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $2,500.00 per EA · qty 2.0 · bid tab
- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $5,500.00 per EA · qty 5.0 · bid tab
- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $12,000.00 per EA · qty 5.0 · bid tab
- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $10,000.00 per EA · qty 3.0 · bid tab
- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $10,000.00 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | TON | 1 | $188.00 | $188.00 to $188.00 | Bids- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $188.00 per TON · qty 11.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $275.00 | $275.00 to $275.00 | Bids- 2024-03-27 · VDOT (Bristol (1)) · C0000119432C01 · $275.00 per LF · qty 1110.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.