Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$172.55$138.40 to $325.00
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $138.40 per TON · qty 5078.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $176.80 per TON · qty 2351.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $168.30 per TON · qty 699.0 · bid tab
  • 2024-05-22 · VDOT (Bristol (1)) · C0000121246B45 · $325.00 per TON · qty 300.0 · bid tab
curb gutterLF2$97.38$97.38 to $97.38
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $97.38 per LF · qty 431.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $97.38 per LF · qty 482.0 · bid tab
excavation embankmentCY1$58.92$58.92 to $58.92
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $58.92 per CY · qty 500.0 · bid tab
excavation embankmentSY1$64.66$64.66 to $64.66
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $64.66 per SY · qty 18.0 · bid tab
fire hydrantEA1$8,656.00$8,656.00 to $8,656.00
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $8,656.00 per EA · qty 1.0 · bid tab
inlet headwallEA6$7,931.16$6,000.20 to $8,606.82
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $8,587.97 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $6,000.20 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $8,606.82 per EA · qty 3.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $7,110.10 per EA · qty 2.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $7,472.94 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $8,389.38 per EA · qty 4.0 · bid tab
lime cement stabilizationTON1$151.48$151.48 to $151.48
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $151.48 per TON · qty 23.22 · bid tab
sidewalkSY1$108.20$108.20 to $108.20
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $108.20 per SY · qty 178.0 · bid tab
storm pipe 18-inchLF1$194.27$194.27 to $194.27
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $194.27 per LF · qty 1145.0 · bid tab
storm pipe 24-inchLF1$190.32$190.32 to $190.32
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $190.32 per LF · qty 273.0 · bid tab
water main 6-inchLF1$270.50$270.50 to $270.50
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $270.50 per LF · qty 9.0 · bid tab
water main 8-inchLF1$200.17$200.17 to $200.17
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $200.17 per LF · qty 815.0 · bid tab
water serviceLF1$97.38$97.38 to $97.38
Bids
  • 2026-06-24 · VDOT (Bristol (1)) · C0000115470C01 · $97.38 per LF · qty 74.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.