Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON21$140.00$90.00 to $1,361.55
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $244.96 per TON · qty 138.0 · bid tab
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $212.35 per TON · qty 492.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $124.00 per TON · qty 1710.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $155.00 per TON · qty 1622.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $140.00 per TON · qty 1186.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $1,361.55 per TON · qty 62.63 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $925.30 per TON · qty 64.33 · bid tab
  • 2026-04-22 · VDOT (Staunton (8)) · C0000127852N01 · $106.25 per TON · qty 3206.0 · bid tab
  • 2026-04-22 · VDOT (Staunton (8)) · C0000127852N01 · $99.50 per TON · qty 5802.0 · bid tab
  • 2025-10-22 · VDOT (Staunton (8)) · C0000123845T01 · $170.00 per TON · qty 2702.0 · bid tab
(10 most recent of 21 shown; all in the Hubstake feed)
curb gutterLF12$49.00$37.60 to $94.29
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $37.60 per LF · qty 375.0 · bid tab
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $40.40 per LF · qty 4.0 · bid tab
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $41.63 per LF · qty 138.0 · bid tab
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $41.97 per LF · qty 264.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $49.00 per LF · qty 1100.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $49.00 per LF · qty 1508.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $44.00 per LF · qty 310.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $94.29 per LF · qty 411.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $81.72 per LF · qty 378.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $94.29 per LF · qty 320.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
excavation embankmentCY7$106.67$20.00 to $502.88
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $106.67 per CY · qty 450.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $60.00 per CY · qty 2272.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $502.88 per CY · qty 48.0 · bid tab
  • 2025-09-24 · VDOT (Staunton (8)) · C0000119658N01B · $162.00 per CY · qty 758.0 · bid tab
  • 2025-06-25 · VDOT (Staunton (8)) · C000111058M01B · $200.50 per CY · qty 738.0 · bid tab
  • 2023-12-13 · VDOT (Staunton (8)) · C000122694N01B · $20.00 per CY · qty 2000.0 · bid tab
  • 2023-12-13 · VDOT (Staunton (8)) · C000122694N01B · $23.00 per CY · qty 2000.0 · bid tab
fire hydrantEA2$5,682.50$5,476.00 to $5,889.00
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $5,889.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $5,476.00 per EA · qty 1.0 · bid tab
inlet headwallEA16$6,423.50$933.00 to $11,485.00
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $6,900.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $7,380.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $4,662.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $6,984.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $9,940.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $11,485.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $7,686.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $933.00 per EA · qty 3.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $7,002.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $6,546.00 per EA · qty 2.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed)
lime cement stabilizationSY3$2.50$2.50 to $4.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $2.50 per SY · qty 4526.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $2.50 per SY · qty 3711.0 · bid tab
  • 2023-12-13 · VDOT (Staunton (8)) · C000122694N01B · $4.00 per SY · qty 14000.0 · bid tab
lime cement stabilizationTON5$300.00$256.20 to $350.00
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $256.20 per TON · qty 3.47 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $350.00 per TON · qty 14.19 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $326.87 per TON · qty 3.52 · bid tab
  • 2025-09-24 · VDOT (Staunton (8)) · C0000119658N01B · $285.00 per TON · qty 5.88 · bid tab
  • 2025-06-25 · VDOT (Staunton (8)) · C000111058M01B · $300.00 per TON · qty 1.4 · bid tab
manholeEA8$4,159.95$2,504.00 to $7,870.13
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $5,130.00 per EA · qty 5.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $2,504.00 per EA · qty 2.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $3,581.89 per EA · qty 3.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $5,053.24 per EA · qty 7.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $7,870.13 per EA · qty 2.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $4,738.02 per EA · qty 14.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C000121648C501B · $2,788.00 per EA · qty 38.0 · bid tab
  • 2025-06-25 · VDOT (Staunton (8)) · C000111058M01B · $3,250.00 per EA · qty 3.0 · bid tab
sidewalkSY2$107.47$76.66 to $138.29
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $76.66 per SY · qty 1094.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000119655C01B · $138.29 per SY · qty 566.0 · bid tab
storm pipe 15-inchLF1$211.62$211.62 to $211.62
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $211.62 per LF · qty 49.0 · bid tab
water main 12-inchLF2$288.50$257.00 to $320.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $257.00 per LF · qty 613.0 · bid tab
  • 2025-06-25 · VDOT (Staunton (8)) · C000111058M01B · $320.00 per LF · qty 234.0 · bid tab
water main 16-inchLF1$645.00$645.00 to $645.00
Bids
  • 2025-06-25 · VDOT (Staunton (8)) · C000111058M01B · $645.00 per LF · qty 23.0 · bid tab
water main 4-inchLF1$215.00$215.00 to $215.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $215.00 per LF · qty 30.0 · bid tab
water main 6-inchLF2$249.09$191.00 to $307.17
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $307.17 per LF · qty 18.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000115715C01 · $191.00 per LF · qty 73.0 · bid tab
water main 8-inchLF2$185.83$185.66 to $186.00
Bids
  • 2026-07-22 · VDOT (Staunton (8)) · C0000119641C02 · $185.66 per LF · qty 316.0 · bid tab
  • 2025-06-25 · VDOT (Staunton (8)) · C000111058M01B · $186.00 per LF · qty 20.0 · bid tab
water serviceLF1$130.00$130.00 to $130.00
Bids
  • 2025-06-25 · VDOT (Staunton (8)) · C000111058M01B · $130.00 per LF · qty 85.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.