Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON8$210.70$92.50 to $504.50
Bids
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $208.40 per TON · qty 529.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $270.50 per TON · qty 171.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $504.50 per TON · qty 228.0 · bid tab
  • 2025-11-19 · VDOT (Lynchburg (3)) · CM326PMG127074 · $92.50 per TON · qty 7318.08 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $250.00 per TON · qty 10.0 · bid tab
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $213.00 per TON · qty 574.0 · bid tab
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $162.50 per TON · qty 1740.0 · bid tab
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $192.00 per TON · qty 700.0 · bid tab
curb gutterLF12$90.00$35.00 to $100.00
Bids
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $100.00 per LF · qty 289.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $95.00 per LF · qty 190.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $100.00 per LF · qty 363.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $95.00 per LF · qty 94.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $35.00 per LF · qty 20.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $85.00 per LF · qty 150.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $45.00 per LF · qty 50.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $100.00 per LF · qty 145.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $35.00 per LF · qty 20.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $85.00 per LF · qty 150.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
excavation embankmentCY1$31.00$31.00 to $31.00
Bids
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $31.00 per CY · qty 639.0 · bid tab
inlet headwallEA7$11,502.70$2,216.00 to $22,193.00
Bids
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $8,905.50 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $11,807.80 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $10,953.80 per EA · qty 2.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $11,502.70 per EA · qty 2.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $12,070.50 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $2,216.00 per EA · qty 3.0 · bid tab
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $22,193.00 per EA · qty 4.0 · bid tab
lime cement stabilizationTON3$354.74$350.00 to $544.70
Bids
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $544.70 per TON · qty 0.3 · bid tab
  • 2024-12-11 · VDOT (Lynchburg (3)) · C000122795M01B · $354.74 per TON · qty 1.34 · bid tab
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $350.00 per TON · qty 4.29 · bid tab
manholeEA6$1,673.50$1,405.00 to $3,589.10
Bids
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $1,693.00 per EA · qty 4.0 · bid tab
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $1,405.00 per EA · qty 8.0 · bid tab
  • 2024-12-11 · VDOT (Lynchburg (3)) · C000122795M01B · $3,589.10 per EA · qty 3.0 · bid tab
  • 2024-12-11 · VDOT (Lynchburg (3)) · C000122795M01B · $3,051.83 per EA · qty 20.0 · bid tab
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $1,654.00 per EA · qty 8.0 · bid tab
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $1,548.00 per EA · qty 6.0 · bid tab
sidewalkSY4$100.00$95.00 to $288.30
Bids
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $288.30 per SY · qty 130.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $100.00 per SY · qty 65.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $95.00 per SY · qty 10.0 · bid tab
  • 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $100.00 per SY · qty 450.0 · bid tab
storm pipe 24-inchLF1$489.50$489.50 to $489.50
Bids
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $489.50 per LF · qty 92.0 · bid tab
storm pipe 36-inchLF1$514.00$514.00 to $514.00
Bids
  • 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $514.00 per LF · qty 275.0 · bid tab
water serviceEA1$2,752.50$2,752.50 to $2,752.50
Bids
  • 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $2,752.50 per EA · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.