| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 8 | $210.70 | $92.50 to $504.50 | Bids- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $208.40 per TON · qty 529.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $270.50 per TON · qty 171.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $504.50 per TON · qty 228.0 · bid tab
- 2025-11-19 · VDOT (Lynchburg (3)) · CM326PMG127074 · $92.50 per TON · qty 7318.08 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $250.00 per TON · qty 10.0 · bid tab
- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $213.00 per TON · qty 574.0 · bid tab
- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $162.50 per TON · qty 1740.0 · bid tab
- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $192.00 per TON · qty 700.0 · bid tab
|
| curb gutter | LF | 12 | $90.00 | $35.00 to $100.00 | Bids- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $100.00 per LF · qty 289.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $95.00 per LF · qty 190.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $100.00 per LF · qty 363.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $95.00 per LF · qty 94.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $35.00 per LF · qty 20.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $85.00 per LF · qty 150.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $45.00 per LF · qty 50.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $100.00 per LF · qty 145.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $35.00 per LF · qty 20.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $85.00 per LF · qty 150.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| excavation embankment | CY | 1 | $31.00 | $31.00 to $31.00 | Bids- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $31.00 per CY · qty 639.0 · bid tab
|
| inlet headwall | EA | 7 | $11,502.70 | $2,216.00 to $22,193.00 | Bids- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $8,905.50 per EA · qty 1.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $11,807.80 per EA · qty 1.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $10,953.80 per EA · qty 2.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $11,502.70 per EA · qty 2.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $12,070.50 per EA · qty 1.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $2,216.00 per EA · qty 3.0 · bid tab
- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $22,193.00 per EA · qty 4.0 · bid tab
|
| lime cement stabilization | TON | 3 | $354.74 | $350.00 to $544.70 | Bids- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $544.70 per TON · qty 0.3 · bid tab
- 2024-12-11 · VDOT (Lynchburg (3)) · C000122795M01B · $354.74 per TON · qty 1.34 · bid tab
- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $350.00 per TON · qty 4.29 · bid tab
|
| manhole | EA | 6 | $1,673.50 | $1,405.00 to $3,589.10 | Bids- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $1,693.00 per EA · qty 4.0 · bid tab
- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $1,405.00 per EA · qty 8.0 · bid tab
- 2024-12-11 · VDOT (Lynchburg (3)) · C000122795M01B · $3,589.10 per EA · qty 3.0 · bid tab
- 2024-12-11 · VDOT (Lynchburg (3)) · C000122795M01B · $3,051.83 per EA · qty 20.0 · bid tab
- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $1,654.00 per EA · qty 8.0 · bid tab
- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $1,548.00 per EA · qty 6.0 · bid tab
|
| sidewalk | SY | 4 | $100.00 | $95.00 to $288.30 | Bids- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $288.30 per SY · qty 130.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $100.00 per SY · qty 65.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $95.00 per SY · qty 10.0 · bid tab
- 2025-03-26 · VDOT (Lynchburg (3)) · C0000124343N01B · $100.00 per SY · qty 450.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $489.50 | $489.50 to $489.50 | Bids- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $489.50 per LF · qty 92.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $514.00 | $514.00 to $514.00 | Bids- 2023-12-13 · VDOT (Lynchburg (3)) · C0000115492C01 · $514.00 per LF · qty 275.0 · bid tab
|
| water service | EA | 1 | $2,752.50 | $2,752.50 to $2,752.50 | Bids- 2026-06-24 · VDOT (Lynchburg (3)) · C0000123944C01 · $2,752.50 per EA · qty 1.0 · bid tab
|