| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 12 | $300.00 | $145.50 to $1,486.46 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $168.78 per TON · qty 253.0 · bid tab
- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $152.28 per TON · qty 363.0 · bid tab
- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $156.85 per TON · qty 618.0 · bid tab
- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $470.05 per TON · qty 48.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $300.00 per TON · qty 108.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $300.00 per TON · qty 93.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $220.00 per TON · qty 316.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $500.00 per TON · qty 7.0 · bid tab
- 2025-07-23 · VDOT (Culpeper (7)) · C000111779D85C · $363.00 per TON · qty 117.0 · bid tab
- 2025-07-23 · VDOT (Culpeper (7)) · C000111779D85C · $547.00 per TON · qty 112.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| curb gutter | LF | 16 | $31.50 | $5.00 to $385.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $31.50 per LF · qty 149.0 · bid tab
- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $31.50 per LF · qty 100.0 · bid tab
- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $31.50 per LF · qty 256.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $385.00 per LF · qty 28.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $30.00 per LF · qty 514.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $45.00 per LF · qty 473.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $30.00 per LF · qty 20.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $30.00 per LF · qty 6.0 · bid tab
- 2024-06-26 · VDOT (Culpeper (7)) · C0000124876N01 · $60.00 per LF · qty 100.0 · bid tab
- 2024-06-26 · VDOT (Culpeper (7)) · C0000124876N01 · $50.00 per LF · qty 400.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed) |
| excavation embankment | CY | 3 | $97.00 | $72.00 to $180.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $72.00 per CY · qty 2925.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $180.00 per CY · qty 248.0 · bid tab
- 2025-07-23 · VDOT (Culpeper (7)) · C000111779D85C · $97.00 per CY · qty 726.0 · bid tab
|
| inlet headwall | EA | 3 | $12,500.00 | $1,500.00 to $12,500.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $12,500.00 per EA · qty 2.0 · bid tab
- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $12,500.00 per EA · qty 2.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $1,500.00 per EA · qty 12.0 · bid tab
|
| lime cement stabilization | TON | 5 | $308.00 | $200.00 to $9,339.50 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $308.00 per TON · qty 8.25 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $300.00 per TON · qty 4.73 · bid tab
- 2025-07-23 · VDOT (Culpeper (7)) · C000111779D85C · $335.00 per TON · qty 1.0 · bid tab
- 2024-06-26 · VDOT (Culpeper (7)) · C0000124876N01 · $200.00 per TON · qty 1.0 · bid tab
- 2023-11-15 · VDOT (Culpeper (7)) · C0000110000B81 · $9,339.50 per TON · qty 0.3 · bid tab
|
| manhole | EA | 3 | $2,400.00 | $2,150.00 to $10,000.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $10,000.00 per EA · qty 2.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $2,150.00 per EA · qty 1.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $2,400.00 per EA · qty 1.0 · bid tab
|
| sidewalk | SY | 5 | $73.50 | $70.00 to $75.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $73.50 per SY · qty 374.0 · bid tab
- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $73.50 per SY · qty 18.0 · bid tab
- 2025-12-17 · VDOT (Culpeper (7)) · C0000118871C01B · $70.00 per SY · qty 292.0 · bid tab
- 2024-06-26 · VDOT (Culpeper (7)) · C0000124876N01 · $75.00 per SY · qty 10.0 · bid tab
- 2024-06-26 · VDOT (Culpeper (7)) · C0000124876N01 · $70.00 per SY · qty 450.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $340.00 | $340.00 to $340.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $340.00 per LF · qty 368.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $365.00 | $365.00 to $365.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $365.00 per LF · qty 132.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $432.50 | $432.50 to $432.50 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $432.50 per LF · qty 25.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $660.00 | $660.00 to $660.00 | Bids- 2026-02-04 · VDOT (Culpeper (7)) · C000118872C501 · $660.00 per LF · qty 104.0 · bid tab
|