PadstakeGet the fee reports
Menu

Site-work prices, Accomack County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$227.91$210.74 to $285.00
Bids
  • 2026-02-04 · VDOT (Hampton Roads (5)) · CM526PMJ127817 · $285.00 per TON · qty 8198.87 · bid tab
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $221.09 per TON · qty 1199.0 · bid tab
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $210.74 per TON · qty 1138.0 · bid tab
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $234.73 per TON · qty 1136.0 · bid tab
excavation embankmentCY1$78.59$78.59 to $78.59
Bids
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $78.59 per CY · qty 1205.0 · bid tab
inlet headwallEA3$11,626.76$11,287.22 to $12,368.71
Bids
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $11,626.76 per EA · qty 2.0 · bid tab
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $12,368.71 per EA · qty 3.0 · bid tab
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $11,287.22 per EA · qty 2.0 · bid tab
lime cement stabilizationTON1$733.24$733.24 to $733.24
Bids
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $733.24 per TON · qty 4.4 · bid tab
manholeEA2$5,426.93$4,834.70 to $6,019.16
Bids
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $6,019.16 per EA · qty 2.0 · bid tab
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $4,834.70 per EA · qty 6.0 · bid tab
storm pipe 15-inchLF1$244.48$244.48 to $244.48
Bids
  • 2025-12-17 · VDOT (Hampton Roads (5)) · C000113634M01B · $244.48 per LF · qty 681.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.