Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON12$128.40$104.90 to $225.00
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $130.90 per TON · qty 100.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $122.90 per TON · qty 100.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $133.90 per TON · qty 100.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $125.90 per TON · qty 1500.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $113.90 per TON · qty 1500.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $115.90 per TON · qty 10000.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $104.90 per TON · qty 5000.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00221435 · $125.90 per TON · qty 100.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $158.00 per TON · qty 1031.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $225.00 per TON · qty 3492.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
excavation embankmentCY3$5.75$5.40 to $100.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $5.75 per CY · qty 9325.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $5.40 per CY · qty 9863.0 · bid tab
  • 2025-11-12 · TxDOT (Tyler district) · A00216530 · $100.00 per CY · qty 3.0 · bid tab
inlet headwallEA1$14,050.00$14,050.00 to $14,050.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $14,050.00 per EA · qty 1.0 · bid tab
lime cement stabilizationSY1$9.00$9.00 to $9.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $9.00 per SY · qty 14520.0 · bid tab
lime cement stabilizationTON1$276.00$276.00 to $276.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $276.00 per TON · qty 393.0 · bid tab
sidewalkSY2$155.00$35.00 to $275.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $275.00 per SY · qty 292.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $35.00 per SY · qty 4142.0 · bid tab
storm pipe 18-inchLF1$52.00$52.00 to $52.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $52.00 per LF · qty 940.0 · bid tab
storm pipe 24-inchLF2$84.00$70.00 to $98.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $70.00 per LF · qty 984.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $98.00 per LF · qty 114.0 · bid tab
storm pipe 54-inchLF1$290.00$290.00 to $290.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00206402 · $290.00 per LF · qty 24.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.