Site-work prices, Winkler County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON8$125.23$87.50 to $169.29
Bids
  • 2025-12-02 · TxDOT (Odessa district) · A00207377 · $87.50 per TON · qty 102327.0 · bid tab
  • 2025-12-02 · TxDOT (Odessa district) · A00207377 · $132.00 per TON · qty 28531.0 · bid tab
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $132.00 per TON · qty 32488.0 · bid tab
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $90.00 per TON · qty 116326.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $117.00 per TON · qty 7227.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $125.00 per TON · qty 43364.0 · bid tab
  • 2025-02-06 · TxDOT (Odessa district) · A00199805 · $169.29 per TON · qty 3651.0 · bid tab
  • 2025-02-06 · TxDOT (Odessa district) · A00199805 · $125.46 per TON · qty 10478.0 · bid tab
concrete pavementSY2$142.50$130.00 to $155.00
Bids
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $130.00 per SY · qty 18747.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $155.00 per SY · qty 807.0 · bid tab
curb gutterLF1$16.00$16.00 to $16.00
Bids
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $16.00 per LF · qty 3116.0 · bid tab
excavation embankmentCY6$13.10$2.30 to $94.00
Bids
  • 2025-12-02 · TxDOT (Odessa district) · A00207377 · $9.47 per CY · qty 112795.0 · bid tab
  • 2025-12-02 · TxDOT (Odessa district) · A00207377 · $16.70 per CY · qty 18903.0 · bid tab
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $9.50 per CY · qty 145380.0 · bid tab
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $17.13 per CY · qty 22185.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $2.30 per CY · qty 1000.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $94.00 per CY · qty 1000.0 · bid tab
flexible baseSY3$8.04$7.77 to $12.00
Bids
  • 2025-12-02 · TxDOT (Odessa district) · A00207377 · $8.04 per SY · qty 111003.0 · bid tab
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $7.77 per SY · qty 133054.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $12.00 per SY · qty 1484.0 · bid tab
lime cement stabilizationCY2$207.05$183.75 to $230.34
Bids
  • 2025-12-02 · TxDOT (Odessa district) · A00207377 · $230.34 per CY · qty 239.5 · bid tab
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $183.75 per CY · qty 343.1 · bid tab
sidewalkEA4$2,125.00$1,800.00 to $2,900.00
Bids
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $2,050.00 per EA · qty 2.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $1,800.00 per EA · qty 5.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $2,200.00 per EA · qty 7.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $2,900.00 per EA · qty 3.0 · bid tab
sidewalkSY3$93.00$57.00 to $131.10
Bids
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $131.10 per SY · qty 932.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $93.00 per SY · qty 2207.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $57.00 per SY · qty 1829.0 · bid tab
storm pipe 24-inchLF3$112.61$78.75 to $342.00
Bids
  • 2025-12-02 · TxDOT (Odessa district) · A00207377 · $112.61 per LF · qty 408.0 · bid tab
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $78.75 per LF · qty 956.0 · bid tab
  • 2025-10-09 · TxDOT (Odessa district) · A00187837 · $342.00 per LF · qty 8.0 · bid tab
storm pipe 30-inchLF1$115.50$115.50 to $115.50
Bids
  • 2025-11-06 · TxDOT (Odessa district) · A00187840 · $115.50 per LF · qty 136.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.