Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON10$93.57$84.17 to $214.52
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $93.40 per TON · qty 31008.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $84.17 per TON · qty 27086.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $92.90 per TON · qty 31267.0 · bid tab
  • 2026-05-07 · TxDOT (San Antonio district) · A00207502 · $200.00 per TON · qty 21.0 · bid tab
  • 2026-01-06 · TxDOT (San Antonio district) · A00218600 · $88.50 per TON · qty 10128.0 · bid tab
  • 2025-12-03 · TxDOT (San Antonio district) · A00206784 · $123.20 per TON · qty 145.0 · bid tab
  • 2025-12-03 · TxDOT (San Antonio district) · A00206784 · $88.00 per TON · qty 567.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $214.52 per TON · qty 10.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $98.06 per TON · qty 9118.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $93.74 per TON · qty 11770.0 · bid tab
curb gutterLF4$20.36$14.20 to $415.98
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $14.20 per LF · qty 1348.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $415.98 per LF · qty 82.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $15.72 per LF · qty 515.0 · bid tab
  • 2024-05-02 · TxDOT · 05243039 · $25.00 per LF · qty 2103.0 · bid tab
excavation embankmentCY18$26.50$2.00 to $250.00
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $8.60 per CY · qty 68259.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $10.72 per CY · qty 33992.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $10.72 per CY · qty 63203.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $11.84 per CY · qty 108549.0 · bid tab
  • 2026-07-22 · TxDOT (San Antonio district) · A00219780 · $250.00 per CY · qty 10.0 · bid tab
  • 2026-05-07 · TxDOT (San Antonio district) · A00207502 · $40.00 per CY · qty 166.0 · bid tab
  • 2026-05-07 · TxDOT (San Antonio district) · A00207502 · $28.00 per CY · qty 1437.0 · bid tab
  • 2026-05-07 · TxDOT (San Antonio district) · A00207502 · $30.00 per CY · qty 942.0 · bid tab
  • 2025-12-17 · TxDOT (San Antonio district) · A00217857 · $2.00 per CY · qty 1.0 · bid tab
  • 2025-12-03 · TxDOT (San Antonio district) · A00206784 · $41.80 per CY · qty 135.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed)
flexible baseCY3$55.69$2.00 to $143.00
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $55.69 per CY · qty 78033.0 · bid tab
  • 2026-05-07 · TxDOT (San Antonio district) · A00207502 · $2.00 per CY · qty 1014.0 · bid tab
  • 2025-06-04 · TxDOT (San Antonio district) · A00187950 · $143.00 per CY · qty 170.0 · bid tab
flexible baseTON1$28.43$28.43 to $28.43
Bids
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $28.43 per TON · qty 65280.0 · bid tab
inlet headwallEA13$8,200.00$4,477.09 to $107,458.58
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $8,857.86 per EA · qty 5.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $5,494.12 per EA · qty 12.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $107,458.58 per EA · qty 2.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $4,477.09 per EA · qty 6.0 · bid tab
  • 2026-05-07 · TxDOT (San Antonio district) · A00207502 · $40,000.00 per EA · qty 2.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $21,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $18,000.00 per EA · qty 3.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $4,500.00 per EA · qty 1.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $16,500.00 per EA · qty 1.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $5,500.00 per EA · qty 1.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
lime cement stabilizationCY3$225.25$160.00 to $229.86
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $229.86 per CY · qty 4550.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $160.00 per CY · qty 802.0 · bid tab
  • 2025-06-04 · TxDOT (San Antonio district) · A00187950 · $225.25 per CY · qty 44.0 · bid tab
lime cement stabilizationSY3$1.65$1.65 to $1.73
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $1.73 per SY · qty 230476.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $1.65 per SY · qty 114208.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $1.65 per SY · qty 58851.0 · bid tab
lime cement stabilizationTON3$194.40$190.80 to $316.44
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $190.80 per TON · qty 3518.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $194.40 per TON · qty 1418.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $316.44 per TON · qty 1226.0 · bid tab
sidewalkEA5$2,205.91$1,476.55 to $3,437.84
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $1,476.55 per EA · qty 5.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $2,169.53 per EA · qty 3.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $2,205.91 per EA · qty 5.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $3,437.84 per EA · qty 2.0 · bid tab
  • 2024-05-02 · TxDOT · 05243039 · $2,500.00 per EA · qty 6.0 · bid tab
sidewalkSF1$150.00$150.00 to $150.00
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $150.00 per SF · qty 464.0 · bid tab
sidewalkSY8$50.66$25.00 to $130.00
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $71.66 per SY · qty 1304.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $51.32 per SY · qty 8856.0 · bid tab
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $79.91 per SY · qty 1654.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $39.24 per SY · qty 3751.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $130.00 per SY · qty 120.0 · bid tab
  • 2024-05-02 · TxDOT · 05243039 · $25.00 per SY · qty 478.0 · bid tab
  • 2024-05-02 · TxDOT · 05243039 · $50.00 per SY · qty 3097.0 · bid tab
  • 2024-05-02 · TxDOT · 05243039 · $25.00 per SY · qty 841.0 · bid tab
storm pipe 18-inchLF2$72.12$68.00 to $76.24
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $76.24 per LF · qty 1587.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $68.00 per LF · qty 1004.0 · bid tab
storm pipe 24-inchLF2$92.14$80.00 to $104.28
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $104.28 per LF · qty 2684.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $80.00 per LF · qty 140.0 · bid tab
storm pipe 36-inchLF1$250.04$250.04 to $250.04
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $250.04 per LF · qty 602.0 · bid tab
storm pipe 42-inchLF2$279.17$250.00 to $308.34
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $308.34 per LF · qty 228.0 · bid tab
  • 2025-12-02 · TxDOT (San Antonio district) · A00188143 · $250.00 per LF · qty 175.0 · bid tab
storm pipe (diameter not stated)LF1$118.19$118.19 to $118.19
Bids
  • 2026-10-07 · TxDOT (San Antonio district) · A00064192 · $118.19 per LF · qty 225.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.