| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 42 | $117.62 | $80.00 to $195.00 | Bids- 2026-09-02 · TxDOT (Austin district) · A00197294 · $102.00 per TON · qty 12418.0 · bid tab
- 2026-07-01 · TxDOT (Austin district) · A00200789 · $115.00 per TON · qty 1228.0 · bid tab
- 2026-07-01 · TxDOT (Austin district) · A00200789 · $168.00 per TON · qty 1837.0 · bid tab
- 2026-07-01 · TxDOT (Austin district) · A00200789 · $90.00 per TON · qty 8280.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $125.00 per TON · qty 3557.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $140.00 per TON · qty 646.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $195.00 per TON · qty 2790.0 · bid tab
- 2026-04-07 · TxDOT (Austin district) · A00215671 · $109.00 per TON · qty 6313.0 · bid tab
- 2026-04-07 · TxDOT (Austin district) · A00215671 · $128.00 per TON · qty 6556.0 · bid tab
- 2026-04-07 · TxDOT (Austin district) · A00215671 · $115.00 per TON · qty 75.0 · bid tab
(10 most recent of 42 shown; all in the Hubstake feed) |
| concrete pavement | SY | 5 | $95.00 | $60.00 to $305.00 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $90.00 per SY · qty 80.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $112.00 per SY · qty 428.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $60.00 per SY · qty 497.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $305.00 per SY · qty 1152.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $95.00 per SY · qty 5652.0 · bid tab
|
| curb gutter | LF | 17 | $63.13 | $3.00 to $246.54 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $95.00 per LF · qty 1122.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $24.00 per LF · qty 5850.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $3.00 per LF · qty 425.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $120.00 per LF · qty 974.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $115.00 per LF · qty 10.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $175.00 per LF · qty 798.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $28.00 per LF · qty 3154.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $42.00 per LF · qty 37.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $30.00 per LF · qty 100.0 · bid tab
- 2025-01-08 · TxDOT (Austin district) · A00178547 · $43.00 per LF · qty 811.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed) |
| excavation embankment | CY | 28 | $14.50 | $4.25 to $500.00 | Bids- 2026-07-02 · TxDOT (Austin district) · A00206732 · $500.00 per CY · qty 5.0 · bid tab
- 2026-07-01 · TxDOT (Austin district) · A00200789 · $12.00 per CY · qty 8216.0 · bid tab
- 2026-07-01 · TxDOT (Austin district) · A00200789 · $12.00 per CY · qty 6217.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $26.00 per CY · qty 7870.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $30.00 per CY · qty 1587.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $12.00 per CY · qty 1003.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $28.50 per CY · qty 422.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $12.10 per CY · qty 5146.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $9.00 per CY · qty 9368.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $9.00 per CY · qty 7509.0 · bid tab
(10 most recent of 28 shown; all in the Hubstake feed) |
| fire hydrant | EA | 1 | $9,392.62 | $9,392.62 to $9,392.62 | Bids- 2026-02-05 · TxDOT (Austin district) · A00135345 · $9,392.62 per EA · qty 2.0 · bid tab
|
| flexible base | CY | 9 | $59.00 | $45.00 to $79.93 | Bids- 2026-07-01 · TxDOT (Austin district) · A00200789 · $48.00 per CY · qty 4337.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $60.00 per CY · qty 2791.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $59.00 per CY · qty 3041.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $45.00 per CY · qty 5210.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00063983 · $68.00 per CY · qty 26046.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00135331 · $65.00 per CY · qty 8168.0 · bid tab
- 2025-08-08 · TxDOT (Austin district) · A00129321 · $50.00 per CY · qty 2748.0 · bid tab
- 2025-06-05 · TxDOT (Austin district) · A00199664 · $79.93 per CY · qty 4403.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $55.04 per CY · qty 29708.0 · bid tab
|
| flexible base | SY | 1 | $15.00 | $15.00 to $15.00 | Bids- 2025-01-07 · TxDOT (Austin district) · A00064247 · $15.00 per SY · qty 8645.0 · bid tab
|
| inlet headwall | CY | 1 | $2,741.63 | $2,741.63 to $2,741.63 | Bids- 2025-01-07 · TxDOT (Austin district) · A00064247 · $2,741.63 per CY · qty 8.9 · bid tab
|
| inlet headwall | EA | 67 | $9,620.00 | $3,800.00 to $100,000.00 | Bids- 2026-07-01 · TxDOT (Austin district) · A00200789 · $41,500.00 per EA · qty 1.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $10,000.00 per EA · qty 5.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $8,750.00 per EA · qty 9.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $7,250.00 per EA · qty 2.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $11,000.00 per EA · qty 5.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $6,500.00 per EA · qty 1.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $8,500.00 per EA · qty 1.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $8,000.00 per EA · qty 1.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $9,620.00 per EA · qty 2.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $6,150.00 per EA · qty 4.0 · bid tab
(10 most recent of 67 shown; all in the Hubstake feed) |
| lime cement stabilization | CY | 4 | $265.46 | $190.00 to $323.99 | Bids- 2026-02-05 · TxDOT (Austin district) · A00193136 · $190.00 per CY · qty 62.0 · bid tab
- 2025-08-08 · TxDOT (Austin district) · A00129321 · $225.00 per CY · qty 191.0 · bid tab
- 2025-06-05 · TxDOT (Austin district) · A00199664 · $323.99 per CY · qty 134.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $305.92 per CY · qty 4370.0 · bid tab
|
| lime cement stabilization | SY | 3 | $3.75 | $3.72 to $7.14 | Bids- 2025-08-08 · TxDOT (Austin district) · A00129321 · $3.75 per SY · qty 6089.0 · bid tab
- 2025-06-05 · TxDOT (Austin district) · A00199664 · $3.72 per SY · qty 22657.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $7.14 per SY · qty 5652.0 · bid tab
|
| lime cement stabilization | TON | 3 | $325.00 | $232.37 to $385.00 | Bids- 2025-08-08 · TxDOT (Austin district) · A00129321 · $325.00 per TON · qty 111.0 · bid tab
- 2025-06-05 · TxDOT (Austin district) · A00199664 · $385.00 per TON · qty 410.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $232.37 per TON · qty 81.0 · bid tab
|
| manhole | EA | 7 | $2,846.25 | $240.00 to $9,573.75 | Bids- 2026-09-09 · TxDOT (Austin district) · A00220213 · $240.00 per EA · qty 110.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $2,846.25 per EA · qty 1.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $9,573.75 per EA · qty 1.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $9,056.25 per EA · qty 1.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $1,811.25 per EA · qty 2.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $2,871.00 per EA · qty 4.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $795.00 per EA · qty 2.0 · bid tab
|
| sidewalk | EA | 10 | $2,425.00 | $2,200.00 to $3,500.00 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $2,200.00 per EA · qty 4.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $2,300.00 per EA · qty 1.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $2,300.00 per EA · qty 1.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $2,500.00 per EA · qty 12.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $2,350.00 per EA · qty 7.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $2,350.00 per EA · qty 3.0 · bid tab
- 2025-07-01 · TxDOT (Austin district) · A00212752 · $3,500.00 per EA · qty 1.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $2,600.00 per EA · qty 4.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $2,650.00 per EA · qty 4.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $3,100.00 per EA · qty 1.0 · bid tab
|
| sidewalk | SY | 17 | $87.05 | $50.16 to $170.00 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $70.00 per SY · qty 5098.0 · bid tab
- 2026-06-03 · TxDOT (Austin district) · A00191143 · $100.00 per SY · qty 412.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $88.00 per SY · qty 1226.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $78.00 per SY · qty 1552.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00063983 · $170.00 per SY · qty 721.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00063983 · $95.00 per SY · qty 2412.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00135331 · $60.00 per SY · qty 988.0 · bid tab
- 2025-08-08 · TxDOT (Austin district) · A00129321 · $73.00 per SY · qty 150.0 · bid tab
- 2025-08-08 · TxDOT (Austin district) · A00129321 · $90.00 per SY · qty 228.0 · bid tab
- 2025-08-08 · TxDOT (Austin district) · A00129321 · $73.00 per SY · qty 109.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed) |
| storm pipe 12-inch | LF | 1 | $174.22 | $174.22 to $174.22 | Bids- 2025-01-07 · TxDOT (Austin district) · A00064247 · $174.22 per LF · qty 168.0 · bid tab
|
| storm pipe 18-inch | LF | 12 | $114.60 | $68.00 to $305.32 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $105.00 per LF · qty 1165.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $305.32 per LF · qty 106.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $85.00 per LF · qty 951.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $85.00 per LF · qty 125.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $94.00 per LF · qty 85.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00063983 · $125.00 per LF · qty 1636.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00135331 · $68.00 per LF · qty 468.0 · bid tab
- 2025-08-08 · TxDOT (Austin district) · A00129321 · $90.00 per LF · qty 106.0 · bid tab
- 2025-06-05 · TxDOT (Austin district) · A00199664 · $124.20 per LF · qty 76.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $184.58 per LF · qty 575.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| storm pipe 24-inch | LF | 9 | $135.00 | $91.00 to $229.32 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $130.00 per LF · qty 321.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $120.00 per LF · qty 234.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $100.00 per LF · qty 200.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00063983 · $150.00 per LF · qty 1570.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00135331 · $91.00 per LF · qty 40.0 · bid tab
- 2025-06-05 · TxDOT (Austin district) · A00199664 · $153.36 per LF · qty 730.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $149.16 per LF · qty 1049.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $229.32 per LF · qty 43.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $135.00 per LF · qty 12483.0 · bid tab
|
| storm pipe 30-inch | LF | 6 | $179.94 | $120.00 to $226.00 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $150.00 per LF · qty 120.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $120.00 per LF · qty 106.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00063983 · $175.00 per LF · qty 1090.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00135331 · $226.00 per LF · qty 148.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $184.87 per LF · qty 2346.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $205.65 per LF · qty 303.0 · bid tab
|
| storm pipe 36-inch | LF | 7 | $214.39 | $170.00 to $275.96 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $200.00 per LF · qty 464.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $192.00 per LF · qty 24.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00063983 · $265.00 per LF · qty 335.0 · bid tab
- 2025-11-05 · TxDOT (Austin district) · A00135331 · $170.00 per LF · qty 73.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $275.96 per LF · qty 90.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $235.70 per LF · qty 107.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $214.39 per LF · qty 2736.0 · bid tab
|
| storm pipe 3-inch | LF | 1 | $100.00 | $100.00 to $100.00 | Bids- 2025-01-07 · TxDOT (Austin district) · A00064247 · $100.00 per LF · qty 831.0 · bid tab
|
| storm pipe 42-inch | LF | 2 | $274.03 | $221.00 to $327.06 | Bids- 2025-11-05 · TxDOT (Austin district) · A00135331 · $221.00 per LF · qty 58.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $327.06 per LF · qty 36.0 · bid tab
|
| storm pipe 48-inch | LF | 2 | $309.33 | $300.00 to $318.66 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $300.00 per LF · qty 485.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $318.66 per LF · qty 52.0 · bid tab
|
| storm pipe 4-inch | LF | 2 | $55.96 | $55.00 to $56.92 | Bids- 2026-02-05 · TxDOT (Austin district) · A00135345 · $56.92 per LF · qty 70.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $55.00 per LF · qty 240.0 · bid tab
|
| storm pipe 6-inch | LF | 3 | $100.00 | $60.03 to $125.00 | Bids- 2025-02-07 · TxDOT (Austin district) · A00205303 · $125.00 per LF · qty 60.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $60.03 per LF · qty 2004.0 · bid tab
- 2025-01-07 · TxDOT (Austin district) · A00064247 · $100.00 per LF · qty 20.0 · bid tab
|
| storm pipe 8-inch | LF | 1 | $50.98 | $50.98 to $50.98 | Bids- 2025-01-07 · TxDOT (Austin district) · A00064247 · $50.98 per LF · qty 1115.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 4 | $137.31 | $90.00 to $450.00 | Bids- 2026-06-03 · TxDOT (Austin district) · A00191143 · $450.00 per LF · qty 8.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $104.63 per LF · qty 125.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00193136 · $170.00 per LF · qty 287.0 · bid tab
- 2025-06-05 · TxDOT (Austin district) · A00199664 · $90.00 per LF · qty 150.0 · bid tab
|
| water main 2-inch | LF | 1 | $15.52 | $15.52 to $15.52 | Bids- 2026-02-05 · TxDOT (Austin district) · A00135345 · $15.52 per LF · qty 1164.0 · bid tab
|
| water main 6-inch | LF | 2 | $67.28 | $15.52 to $119.03 | Bids- 2026-02-05 · TxDOT (Austin district) · A00135345 · $119.03 per LF · qty 458.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $15.52 per LF · qty 23.0 · bid tab
|
| water main 8-inch | LF | 2 | $93.15 | $15.52 to $170.78 | Bids- 2026-02-05 · TxDOT (Austin district) · A00135345 · $170.78 per LF · qty 209.0 · bid tab
- 2026-02-05 · TxDOT (Austin district) · A00135345 · $15.52 per LF · qty 107.0 · bid tab
|
| water service | EA | 1 | $3,027.37 | $3,027.37 to $3,027.37 | Bids- 2026-02-05 · TxDOT (Austin district) · A00135345 · $3,027.37 per EA · qty 6.0 · bid tab
|
| water service | LF | 1 | $41.40 | $41.40 to $41.40 | Bids- 2026-02-05 · TxDOT (Austin district) · A00135345 · $41.40 per LF · qty 298.0 · bid tab
|