Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON27$145.00$73.00 to $230.00
Bids
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $110.00 per TON · qty 3775.0 · bid tab
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $165.00 per TON · qty 5053.0 · bid tab
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $110.00 per TON · qty 9962.0 · bid tab
  • 2026-07-01 · TxDOT (Bryan district) · A00222317 · $162.75 per TON · qty 5775.0 · bid tab
  • 2026-04-08 · TxDOT (Bryan district) · A00200748 · $175.00 per TON · qty 17083.0 · bid tab
  • 2026-04-08 · TxDOT (Bryan district) · A00200748 · $145.00 per TON · qty 16164.0 · bid tab
  • 2026-04-07 · TxDOT (Bryan district) · A00189999 · $230.00 per TON · qty 78.0 · bid tab
  • 2025-12-10 · TxDOT (Bryan district) · A00218387 · $73.00 per TON · qty 200.0 · bid tab
  • 2025-12-10 · TxDOT (Bryan district) · A00218387 · $73.00 per TON · qty 200.0 · bid tab
  • 2025-12-10 · TxDOT (Bryan district) · A00218387 · $92.00 per TON · qty 3000.0 · bid tab
(10 most recent of 27 shown; all in the Hubstake feed)
curb gutterLF5$24.21$9.78 to $586.57
Bids
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $9.78 per LF · qty 38.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $24.21 per LF · qty 3751.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $586.57 per LF · qty 28.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $24.85 per LF · qty 61.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $11.28 per LF · qty 1092.0 · bid tab
excavation embankmentCY12$30.00$6.00 to $100.00
Bids
  • 2026-04-07 · TxDOT (Bryan district) · A00189999 · $30.00 per CY · qty 70.0 · bid tab
  • 2026-04-07 · TxDOT (Bryan district) · A00189999 · $30.00 per CY · qty 153.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $27.00 per CY · qty 2543.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $15.00 per CY · qty 1566.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $43.62 per CY · qty 647.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $85.38 per CY · qty 210.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00196756 · $29.35 per CY · qty 1158.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00196756 · $43.29 per CY · qty 306.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $7.25 per CY · qty 21090.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $6.00 per CY · qty 13947.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
flexible baseSY5$25.00$19.01 to $46.18
Bids
  • 2026-04-07 · TxDOT (Bryan district) · A00189999 · $25.00 per SY · qty 709.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $31.00 per SY · qty 2791.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $19.01 per SY · qty 1934.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00196756 · $46.18 per SY · qty 1994.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $24.00 per SY · qty 173537.0 · bid tab
flexible baseTON6$35.00$30.00 to $37.00
Bids
  • 2025-11-13 · TxDOT (Bryan district) · A00217930 · $30.00 per TON · qty 1000.0 · bid tab
  • 2025-11-13 · TxDOT (Bryan district) · A00217930 · $35.00 per TON · qty 1000.0 · bid tab
  • 2025-11-13 · TxDOT (Bryan district) · A00217930 · $35.00 per TON · qty 1000.0 · bid tab
  • 2024-06-12 · TxDOT · 06241705 · $35.00 per TON · qty 1500.0 · bid tab
  • 2024-06-12 · TxDOT · 06241705 · $37.00 per TON · qty 1500.0 · bid tab
  • 2024-06-12 · TxDOT · 06241705 · $37.00 per TON · qty 1500.0 · bid tab
inlet headwallEA15$23,000.00$2,428.39 to $43,000.00
Bids
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $12,560.98 per EA · qty 1.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $2,428.39 per EA · qty 5.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $20,000.00 per EA · qty 3.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $26,000.00 per EA · qty 4.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $34,500.00 per EA · qty 3.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $30,000.00 per EA · qty 3.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $23,000.00 per EA · qty 3.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $23,500.00 per EA · qty 2.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $23,000.00 per EA · qty 3.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $7,000.00 per EA · qty 1.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed)
lime cement stabilizationCY3$155.00$110.00 to $200.00
Bids
  • 2026-04-07 · TxDOT (Bryan district) · A00189999 · $200.00 per CY · qty 128.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $110.00 per CY · qty 176.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $155.00 per CY · qty 1120.0 · bid tab
lime cement stabilizationSY9$5.70$2.10 to $65.00
Bids
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $5.00 per SY · qty 7561.0 · bid tab
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $65.00 per SY · qty 6956.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $35.00 per SY · qty 1486.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $5.00 per SY · qty 1486.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00196756 · $5.70 per SY · qty 2193.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00196756 · $6.27 per SY · qty 1994.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $35.00 per SY · qty 883.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $2.10 per SY · qty 87210.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $2.50 per SY · qty 173537.0 · bid tab
lime cement stabilizationTON6$280.00$225.00 to $750.00
Bids
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $350.00 per TON · qty 75.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $225.00 per TON · qty 15.0 · bid tab
  • 2025-11-05 · TxDOT (Bryan district) · A00135986 · $750.00 per TON · qty 15.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00196756 · $250.00 per TON · qty 44.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $310.00 per TON · qty 1454.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $245.00 per TON · qty 5529.0 · bid tab
sidewalkSY20$175.48$16.00 to $3,907.95
Bids
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $35.00 per SY · qty 1361.0 · bid tab
  • 2026-08-06 · TxDOT (Bryan district) · A00187526 · $150.00 per SY · qty 86.0 · bid tab
  • 2026-04-07 · TxDOT (Bryan district) · A00189999 · $120.00 per SY · qty 104.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $254.19 per SY · qty 170.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $221.64 per SY · qty 67.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $307.73 per SY · qty 113.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $201.08 per SY · qty 20.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $3,907.95 per SY · qty 2.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $81.12 per SY · qty 2732.0 · bid tab
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $229.04 per SY · qty 193.0 · bid tab
(10 most recent of 20 shown; all in the Hubstake feed)
storm pipe 18-inchLF2$67.00$62.00 to $72.00
Bids
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $72.00 per LF · qty 1236.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $62.00 per LF · qty 1092.0 · bid tab
storm pipe 24-inchLF2$130.00$125.00 to $135.00
Bids
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $125.00 per LF · qty 130.0 · bid tab
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $135.00 per LF · qty 214.0 · bid tab
storm pipe 30-inchLF1$150.00$150.00 to $150.00
Bids
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $150.00 per LF · qty 158.0 · bid tab
storm pipe 36-inchLF1$175.00$175.00 to $175.00
Bids
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $175.00 per LF · qty 178.0 · bid tab
storm pipe 42-inchLF1$210.00$210.00 to $210.00
Bids
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $210.00 per LF · qty 84.0 · bid tab
storm pipe 48-inchLF1$245.00$245.00 to $245.00
Bids
  • 2024-10-01 · TxDOT (Bryan district) · A00187297 · $245.00 per LF · qty 52.0 · bid tab
storm pipe 6-inchLF1$102.24$102.24 to $102.24
Bids
  • 2025-09-05 · TxDOT (Bryan district) · A00132768 · $102.24 per LF · qty 20.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.