Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON56$120.00$98.00 to $500.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $150.50 per TON · qty 25740.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $139.40 per TON · qty 52866.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $137.91 per TON · qty 95363.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $145.50 per TON · qty 45266.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $213.70 per TON · qty 4169.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $185.14 per TON · qty 613.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00220776 · $186.98 per TON · qty 21973.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $162.96 per TON · qty 636.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $189.63 per TON · qty 313.0 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00220299 · $120.00 per TON · qty 200.0 · bid tab
(10 most recent of 56 shown; all in the Hubstake feed)
concrete pavementSY4$137.80$110.00 to $200.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $118.60 per SY · qty 923.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $110.00 per SY · qty 15480.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $157.00 per SY · qty 3652.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00206403 · $200.00 per SY · qty 22.0 · bid tab
curb gutterEA2$2,340.00$1,980.00 to $2,700.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $1,980.00 per EA · qty 1.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $2,700.00 per EA · qty 2.0 · bid tab
curb gutterLF10$48.50$10.50 to $128.95
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $10.50 per LF · qty 319.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $42.00 per LF · qty 408.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $28.60 per LF · qty 47129.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $30.00 per LF · qty 1108.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $128.95 per LF · qty 58.0 · bid tab
  • 2026-03-05 · TxDOT (Tyler district) · A00198645 · $20.00 per LF · qty 4756.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00206403 · $55.00 per LF · qty 388.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00196225 · $100.00 per LF · qty 50.0 · bid tab
  • 2024-11-06 · TxDOT (Tyler district) · A00193158 · $66.00 per LF · qty 557.0 · bid tab
  • 2024-11-06 · TxDOT (Tyler district) · A00198667 · $65.00 per LF · qty 586.0 · bid tab
curb gutterSF1$100.00$100.00 to $100.00
Bids
  • 2026-07-21 · TxDOT (Tyler district) · A00222462 · $100.00 per SF · qty 7.5 · bid tab
excavation embankmentCY17$20.00$2.75 to $250.00
Bids
  • 2026-07-21 · TxDOT (Tyler district) · A00222462 · $50.00 per CY · qty 160.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $6.50 per CY · qty 550728.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $2.75 per CY · qty 113872.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $19.70 per CY · qty 5120.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $5.80 per CY · qty 771996.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $20.00 per CY · qty 3000.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $8.00 per CY · qty 243318.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $15.50 per CY · qty 327.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $12.85 per CY · qty 453.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00206403 · $17.00 per CY · qty 138.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
flexible baseSY3$22.00$22.00 to $24.85
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $24.85 per SY · qty 230417.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $22.00 per SY · qty 888.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $22.00 per SY · qty 368022.0 · bid tab
inlet headwallCY1$98.00$98.00 to $98.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $98.00 per CY · qty 187.0 · bid tab
inlet headwallEA39$15,850.00$5,480.00 to $80,380.00
Bids
  • 2026-07-21 · TxDOT (Tyler district) · A00222462 · $20,000.00 per EA · qty 1.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $5,930.00 per EA · qty 12.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $16,145.00 per EA · qty 1.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $10,310.00 per EA · qty 1.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $8,015.00 per EA · qty 9.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $7,095.00 per EA · qty 6.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $80,380.00 per EA · qty 1.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $7,650.00 per EA · qty 6.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $23,440.00 per EA · qty 1.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $9,540.00 per EA · qty 5.0 · bid tab
(10 most recent of 39 shown; all in the Hubstake feed)
lime cement stabilizationCY4$231.80$195.00 to $300.00
Bids
  • 2026-07-21 · TxDOT (Tyler district) · A00222462 · $300.00 per CY · qty 80.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $235.60 per CY · qty 1173.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $195.00 per CY · qty 2467.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $228.00 per CY · qty 205.0 · bid tab
lime cement stabilizationSY6$4.38$3.50 to $5.50
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $5.50 per SY · qty 115221.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $5.00 per SY · qty 115221.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $3.75 per SY · qty 195931.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $3.75 per SY · qty 195931.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $3.50 per SY · qty 2715.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00209706 · $5.00 per SY · qty 6584.0 · bid tab
lime cement stabilizationTON6$302.50$263.00 to $350.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $350.00 per TON · qty 2592.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $263.00 per TON · qty 2592.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $335.00 per TON · qty 3527.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $263.00 per TON · qty 3527.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $280.00 per TON · qty 73.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00209706 · $325.00 per TON · qty 178.0 · bid tab
sidewalkEA25$3,100.00$1,509.10 to $4,500.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $2,535.00 per EA · qty 24.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $3,990.00 per EA · qty 2.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $2,845.00 per EA · qty 20.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $4,105.00 per EA · qty 6.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $2,300.00 per EA · qty 3.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $3,100.00 per EA · qty 2.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $1,922.90 per EA · qty 2.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $3,415.04 per EA · qty 4.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $2,129.40 per EA · qty 1.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $1,509.10 per EA · qty 6.0 · bid tab
(10 most recent of 25 shown; all in the Hubstake feed)
sidewalkSY24$120.00$35.00 to $300.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $70.20 per SY · qty 20456.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $44.10 per SY · qty 9176.0 · bid tab
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $115.00 per SY · qty 4421.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $35.00 per SY · qty 13014.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $75.00 per SY · qty 1574.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $130.00 per SY · qty 2611.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $116.35 per SY · qty 667.0 · bid tab
  • 2026-04-08 · TxDOT (Tyler district) · A00212486 · $78.00 per SY · qty 319.0 · bid tab
  • 2026-03-05 · TxDOT (Tyler district) · A00198645 · $300.00 per SY · qty 56.0 · bid tab
  • 2026-03-05 · TxDOT (Tyler district) · A00198645 · $100.00 per SY · qty 2239.0 · bid tab
(10 most recent of 24 shown; all in the Hubstake feed)
storm pipe 18-inchLF4$64.75$41.70 to $75.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $41.70 per LF · qty 12426.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $58.00 per LF · qty 3747.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00214377 · $71.50 per LF · qty 50.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00209706 · $75.00 per LF · qty 72.0 · bid tab
storm pipe 24-inchLF3$77.00$60.35 to $85.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $60.35 per LF · qty 6368.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $77.00 per LF · qty 3189.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00209706 · $85.00 per LF · qty 130.0 · bid tab
storm pipe 30-inchLF3$100.00$85.40 to $250.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $85.40 per LF · qty 2736.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $100.00 per LF · qty 342.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00209706 · $250.00 per LF · qty 14.0 · bid tab
storm pipe 36-inchLF2$131.30$117.60 to $145.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $117.60 per LF · qty 3141.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $145.00 per LF · qty 1079.0 · bid tab
storm pipe 42-inchLF2$170.50$161.00 to $180.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $161.00 per LF · qty 1162.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00058522 · $180.00 per LF · qty 240.0 · bid tab
storm pipe 48-inchLF2$297.00$194.00 to $400.00
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $194.00 per LF · qty 1978.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00209706 · $400.00 per LF · qty 12.0 · bid tab
storm pipe 54-inchLF1$460.50$460.50 to $460.50
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $460.50 per LF · qty 13.0 · bid tab
storm pipe 6-inchLF1$52.50$52.50 to $52.50
Bids
  • 2026-07-02 · TxDOT (Tyler district) · A00027293 · $52.50 per LF · qty 145.0 · bid tab
storm pipe (diameter not stated)LF1$100.00$100.00 to $100.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00196225 · $100.00 per LF · qty 50.0 · bid tab