Site-work prices, Shelby County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$122.00$112.00 to $350.00
Bids
  • 2025-11-20 · TxDOT (Lufkin district) · A00217983 · $112.00 per TON · qty 250.0 · bid tab
  • 2025-11-20 · TxDOT (Lufkin district) · A00217983 · $115.00 per TON · qty 500.0 · bid tab
  • 2025-11-20 · TxDOT (Lufkin district) · A00217983 · $122.00 per TON · qty 1500.0 · bid tab
  • 2025-11-20 · TxDOT (Lufkin district) · A00217983 · $115.00 per TON · qty 1500.0 · bid tab
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $200.00 per TON · qty 148.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $182.89 per TON · qty 6210.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $223.76 per TON · qty 1738.0 · bid tab
  • 2024-10-01 · TxDOT (Lufkin district) · A00140931 · $350.00 per TON · qty 84.0 · bid tab
  • 2024-07-10 · TxDOT · 07244210 · $236.30 per TON · qty 2161.0 · bid tab
  • 2024-05-09 · TxDOT · 05241163 · $119.05 per TON · qty 1000.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
excavation embankmentCY5$20.00$20.00 to $25.00
Bids
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $20.00 per CY · qty 746.0 · bid tab
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $20.00 per CY · qty 977.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $25.00 per CY · qty 1879.0 · bid tab
  • 2024-10-01 · TxDOT (Lufkin district) · A00140931 · $20.00 per CY · qty 719.0 · bid tab
  • 2024-10-01 · TxDOT (Lufkin district) · A00140931 · $20.00 per CY · qty 1323.0 · bid tab
flexible baseSY5$40.00$35.00 to $78.75
Bids
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $35.00 per SY · qty 1372.0 · bid tab
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $40.00 per SY · qty 1288.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $78.75 per SY · qty 189.0 · bid tab
  • 2024-10-01 · TxDOT (Lufkin district) · A00140931 · $40.00 per SY · qty 2811.0 · bid tab
  • 2024-10-01 · TxDOT (Lufkin district) · A00140931 · $40.00 per SY · qty 882.0 · bid tab
flexible baseTON5$47.83$46.90 to $52.50
Bids
  • 2025-11-20 · TxDOT (Lufkin district) · A00217983 · $46.90 per TON · qty 1500.0 · bid tab
  • 2025-11-20 · TxDOT (Lufkin district) · A00217983 · $47.83 per TON · qty 1500.0 · bid tab
  • 2024-05-30 · TxDOT · 05241165 · $47.50 per TON · qty 1000.0 · bid tab
  • 2024-05-30 · TxDOT · 05241165 · $52.50 per TON · qty 1000.0 · bid tab
  • 2024-05-30 · TxDOT · 05241165 · $52.50 per TON · qty 2000.0 · bid tab
inlet headwallEA5$9,975.00$6,825.00 to $19,950.00
Bids
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $19,950.00 per EA · qty 1.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $8,925.00 per EA · qty 3.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $9,975.00 per EA · qty 1.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $16,800.00 per EA · qty 3.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $6,825.00 per EA · qty 3.0 · bid tab
lime cement stabilizationCY3$350.00$300.00 to $514.50
Bids
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $300.00 per CY · qty 151.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $514.50 per CY · qty 19.0 · bid tab
  • 2024-10-01 · TxDOT (Lufkin district) · A00140931 · $350.00 per CY · qty 220.0 · bid tab
lime cement stabilizationSY1$111.85$111.85 to $111.85
Bids
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $111.85 per SY · qty 12159.0 · bid tab
sidewalkEA1$100.00$100.00 to $100.00
Bids
  • 2025-07-30 · TxDOT (Lufkin district) · A00216492 · $100.00 per EA · qty 2.0 · bid tab
sidewalkSY4$82.50$60.00 to $194.25
Bids
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $60.00 per SY · qty 30.0 · bid tab
  • 2025-08-07 · TxDOT (Lufkin district) · A00185701 · $105.00 per SY · qty 20.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $60.00 per SY · qty 3055.0 · bid tab
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $194.25 per SY · qty 148.0 · bid tab
storm pipe 18-inchLF1$74.55$74.55 to $74.55
Bids
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $74.55 per LF · qty 1686.0 · bid tab
storm pipe 24-inchLF1$98.70$98.70 to $98.70
Bids
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $98.70 per LF · qty 18.0 · bid tab
storm pipe 30-inchLF1$262.50$262.50 to $262.50
Bids
  • 2025-01-07 · TxDOT (Lufkin district) · A00178004 · $262.50 per LF · qty 6.0 · bid tab
storm pipe (diameter not stated)LF2$38.50$22.00 to $55.00
Bids
  • 2026-08-11 · TxDOT (Lufkin district) · A00219341 · $22.00 per LF · qty 25.0 · bid tab
  • 2025-07-30 · TxDOT (Lufkin district) · A00216492 · $55.00 per LF · qty 15.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.