Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$105.85$89.49 to $126.47
Bids
  • 2026-07-15 · TxDOT (Brownwood district) · A00223039 · $89.49 per TON · qty 2000.0 · bid tab
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $126.47 per TON · qty 535.0 · bid tab
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $107.70 per TON · qty 6524.0 · bid tab
  • 2025-03-27 · TxDOT (Brownwood district) · A00214613 · $104.00 per TON · qty 2000.0 · bid tab
excavation embankmentCY2$4.54$3.32 to $5.77
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $5.77 per CY · qty 20497.0 · bid tab
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $3.32 per CY · qty 24553.0 · bid tab
flexible baseCY2$49.37$43.47 to $55.27
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $43.47 per CY · qty 11151.0 · bid tab
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $55.27 per CY · qty 2500.0 · bid tab
flexible baseSY1$17.44$17.44 to $17.44
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $17.44 per SY · qty 120269.0 · bid tab
inlet headwallEA2$31,037.42$18,119.55 to $43,955.29
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $18,119.55 per EA · qty 4.0 · bid tab
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $43,955.29 per EA · qty 2.0 · bid tab
lime cement stabilizationCY1$199.43$199.43 to $199.43
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $199.43 per CY · qty 400.0 · bid tab
lime cement stabilizationSY1$1.75$1.75 to $1.75
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $1.75 per SY · qty 104249.0 · bid tab
lime cement stabilizationTON1$243.11$243.11 to $243.11
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $243.11 per TON · qty 882.0 · bid tab
sidewalkSY2$59.31$17.76 to $100.86
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $17.76 per SY · qty 3852.0 · bid tab
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $100.86 per SY · qty 97.0 · bid tab
storm pipe 18-inchLF1$215.38$215.38 to $215.38
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $215.38 per LF · qty 82.0 · bid tab
storm pipe 24-inchLF2$191.11$147.33 to $234.88
Bids
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $234.88 per LF · qty 387.0 · bid tab
  • 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $147.33 per LF · qty 1969.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.