| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 4 | $105.85 | $89.49 to $126.47 | Bids- 2026-07-15 · TxDOT (Brownwood district) · A00223039 · $89.49 per TON · qty 2000.0 · bid tab
- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $126.47 per TON · qty 535.0 · bid tab
- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $107.70 per TON · qty 6524.0 · bid tab
- 2025-03-27 · TxDOT (Brownwood district) · A00214613 · $104.00 per TON · qty 2000.0 · bid tab
|
| excavation embankment | CY | 2 | $4.54 | $3.32 to $5.77 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $5.77 per CY · qty 20497.0 · bid tab
- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $3.32 per CY · qty 24553.0 · bid tab
|
| flexible base | CY | 2 | $49.37 | $43.47 to $55.27 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $43.47 per CY · qty 11151.0 · bid tab
- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $55.27 per CY · qty 2500.0 · bid tab
|
| flexible base | SY | 1 | $17.44 | $17.44 to $17.44 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $17.44 per SY · qty 120269.0 · bid tab
|
| inlet headwall | EA | 2 | $31,037.42 | $18,119.55 to $43,955.29 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $18,119.55 per EA · qty 4.0 · bid tab
- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $43,955.29 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | CY | 1 | $199.43 | $199.43 to $199.43 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $199.43 per CY · qty 400.0 · bid tab
|
| lime cement stabilization | SY | 1 | $1.75 | $1.75 to $1.75 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $1.75 per SY · qty 104249.0 · bid tab
|
| lime cement stabilization | TON | 1 | $243.11 | $243.11 to $243.11 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $243.11 per TON · qty 882.0 · bid tab
|
| sidewalk | SY | 2 | $59.31 | $17.76 to $100.86 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $17.76 per SY · qty 3852.0 · bid tab
- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $100.86 per SY · qty 97.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $215.38 | $215.38 to $215.38 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $215.38 per LF · qty 82.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $191.11 | $147.33 to $234.88 | Bids- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $234.88 per LF · qty 387.0 · bid tab
- 2025-09-05 · TxDOT (Brownwood district) · A00193132 · $147.33 per LF · qty 1969.0 · bid tab
|