Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON32$124.90$102.00 to $396.92
Bids
  • 2026-06-03 · TxDOT (Tyler district) · A00220774 · $225.00 per TON · qty 1783.0 · bid tab
  • 2026-06-03 · TxDOT (Tyler district) · A00220774 · $189.00 per TON · qty 14726.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $126.00 per TON · qty 200.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $117.00 per TON · qty 200.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $117.00 per TON · qty 200.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $122.00 per TON · qty 200.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $114.00 per TON · qty 200.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $102.00 per TON · qty 1500.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $114.00 per TON · qty 8000.0 · bid tab
  • 2026-05-06 · TxDOT (Tyler district) · A00220915 · $114.00 per TON · qty 200.0 · bid tab
(10 most recent of 32 shown; all in the Hubstake feed)
curb gutterLF1$15.00$15.00 to $15.00
Bids
  • 2025-09-05 · TxDOT (Tyler district) · A00211554 · $15.00 per LF · qty 459.0 · bid tab
excavation embankmentCY12$19.62$10.50 to $40.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $22.00 per CY · qty 1221.0 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $19.25 per CY · qty 135.5 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $28.50 per CY · qty 300.0 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $16.00 per CY · qty 168.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $25.00 per CY · qty 1000.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $15.00 per CY · qty 5314.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $18.00 per CY · qty 15897.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $10.50 per CY · qty 34832.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $15.50 per CY · qty 14626.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00184659 · $40.00 per CY · qty 567.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
flexible baseSY1$48.00$48.00 to $48.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $48.00 per SY · qty 39838.0 · bid tab
inlet headwallEA25$21,975.00$9,135.00 to $68,250.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $9,900.00 per EA · qty 3.0 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $27,145.00 per EA · qty 3.0 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $10,660.00 per EA · qty 1.0 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $21,975.00 per EA · qty 1.0 · bid tab
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $13,775.00 per EA · qty 2.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $9,345.00 per EA · qty 1.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $37,275.00 per EA · qty 1.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $68,250.00 per EA · qty 1.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $21,525.00 per EA · qty 1.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $60,900.00 per EA · qty 1.0 · bid tab
(10 most recent of 25 shown; all in the Hubstake feed)
lime cement stabilizationCY1$250.00$250.00 to $250.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $250.00 per CY · qty 248.0 · bid tab
lime cement stabilizationSY5$3.26$2.50 to $7.50
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $2.50 per SY · qty 83297.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $7.50 per SY · qty 25036.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $3.26 per SY · qty 25036.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $2.50 per SY · qty 44757.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00184659 · $6.25 per SY · qty 19144.0 · bid tab
lime cement stabilizationTON5$295.00$168.00 to $392.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $250.00 per TON · qty 1724.25 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $392.00 per TON · qty 514.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $168.00 per TON · qty 514.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $295.00 per TON · qty 1209.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00184659 · $300.00 per TON · qty 345.0 · bid tab
sidewalkSY5$48.00$40.00 to $150.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $48.00 per SY · qty 3082.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $40.00 per SY · qty 3249.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $45.00 per SY · qty 16665.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $100.00 per SY · qty 200.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00211554 · $150.00 per SY · qty 50.0 · bid tab
storm pipe 12-inchLF1$55.00$55.00 to $55.00
Bids
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $55.00 per LF · qty 104.0 · bid tab
storm pipe 18-inchLF4$61.62$50.00 to $100.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $55.00 per LF · qty 830.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $68.25 per LF · qty 938.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $50.00 per LF · qty 4068.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00184659 · $100.00 per LF · qty 20.0 · bid tab
storm pipe 24-inchLF3$75.00$67.00 to $103.95
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $75.00 per LF · qty 228.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $103.95 per LF · qty 118.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $67.00 per LF · qty 98.0 · bid tab
storm pipe 30-inchLF4$153.75$130.00 to $330.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $150.00 per LF · qty 16.0 · bid tab
  • 2026-02-05 · TxDOT (Tyler district) · A00058517 · $157.50 per LF · qty 26.0 · bid tab
  • 2026-01-06 · TxDOT (Tyler district) · A00184512 · $130.00 per LF · qty 50.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00184659 · $330.00 per LF · qty 8.0 · bid tab
storm pipe 36-inchLF1$155.00$155.00 to $155.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $155.00 per LF · qty 54.0 · bid tab
storm pipe 48-inchLF1$260.00$260.00 to $260.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $260.00 per LF · qty 16.0 · bid tab
storm pipe 54-inchLF1$265.00$265.00 to $265.00
Bids
  • 2026-04-07 · TxDOT (Tyler district) · A00060559 · $265.00 per LF · qty 24.0 · bid tab
storm pipe (diameter not stated)LF1$40.00$40.00 to $40.00
Bids
  • 2025-03-11 · TxDOT (Tyler district) · A00212782 · $40.00 per LF · qty 30.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.