Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON23$98.00$69.00 to $300.00
Bids
  • 2026-06-10 · TxDOT (Bryan district) · A00221779 · $76.49 per TON · qty 300.0 · bid tab
  • 2026-06-10 · TxDOT (Bryan district) · A00221779 · $94.49 per TON · qty 2000.0 · bid tab
  • 2026-06-10 · TxDOT (Bryan district) · A00221779 · $77.49 per TON · qty 300.0 · bid tab
  • 2026-06-10 · TxDOT (Bryan district) · A00221779 · $95.49 per TON · qty 1000.0 · bid tab
  • 2026-05-07 · TxDOT (Bryan district) · A00217203 · $149.00 per TON · qty 12892.0 · bid tab
  • 2026-03-05 · TxDOT (Bryan district) · A00217747 · $220.00 per TON · qty 8608.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00216197 · $98.00 per TON · qty 2000.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00216197 · $69.00 per TON · qty 500.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00216197 · $97.00 per TON · qty 1500.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00216197 · $70.00 per TON · qty 500.0 · bid tab
(10 most recent of 23 shown; all in the Hubstake feed)
curb gutterLF1$200.00$200.00 to $200.00
Bids
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $200.00 per LF · qty 152.0 · bid tab
excavation embankmentCY9$17.00$9.00 to $23.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $9.00 per CY · qty 34619.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $9.00 per CY · qty 21577.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $9.00 per CY · qty 4809.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $15.00 per CY · qty 112799.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $22.00 per CY · qty 2321.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $20.00 per CY · qty 364.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $20.00 per CY · qty 791.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $17.00 per CY · qty 7765.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $23.00 per CY · qty 45115.0 · bid tab
flexible baseSY5$17.00$11.38 to $50.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $11.38 per SY · qty 202955.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $16.00 per SY · qty 234045.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $21.00 per SY · qty 2913.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $50.00 per SY · qty 333.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $17.00 per SY · qty 62293.0 · bid tab
inlet headwallEA17$31,000.00$7,446.00 to $100,000.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $7,446.00 per EA · qty 1.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $9,574.00 per EA · qty 2.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $12,765.00 per EA · qty 3.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $31,914.00 per EA · qty 3.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $63,828.00 per EA · qty 2.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $61,700.00 per EA · qty 1.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $46,807.00 per EA · qty 1.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $42,552.00 per EA · qty 2.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $63,828.00 per EA · qty 2.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $18,085.00 per EA · qty 3.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
lime cement stabilizationCY3$175.00$110.00 to $240.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $240.00 per CY · qty 516.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $175.00 per CY · qty 1626.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $110.00 per CY · qty 396.0 · bid tab
lime cement stabilizationSY8$3.62$1.40 to $120.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $1.40 per SY · qty 202955.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $44.45 per SY · qty 8121.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $1.40 per SY · qty 228132.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $120.00 per SY · qty 55.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $2.00 per SY · qty 234045.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $4.00 per SY · qty 3061.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $7.65 per SY · qty 765.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $3.25 per SY · qty 62293.0 · bid tab
lime cement stabilizationTON5$270.00$209.00 to $1,000.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $209.00 per TON · qty 4328.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $240.00 per TON · qty 2902.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $1,000.00 per TON · qty 5.0 · bid tab
  • 2025-02-06 · TxDOT (Bryan district) · A00184763 · $325.00 per TON · qty 23.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $270.00 per TON · qty 1414.0 · bid tab
sidewalkEA1$638.00$638.00 to $638.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $638.00 per EA · qty 2.0 · bid tab
sidewalkSY6$79.50$45.00 to $266.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $266.00 per SY · qty 90.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $45.00 per SY · qty 12022.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $125.00 per SY · qty 657.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $55.00 per SY · qty 8254.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $99.00 per SY · qty 1153.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $60.00 per SY · qty 1556.0 · bid tab
storm pipe 12-inchLF1$60.00$60.00 to $60.00
Bids
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $60.00 per LF · qty 83.0 · bid tab
storm pipe 15-inchLF1$65.00$65.00 to $65.00
Bids
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $65.00 per LF · qty 299.0 · bid tab
storm pipe 18-inchLF3$75.00$65.95 to $78.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $65.95 per LF · qty 1748.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $75.00 per LF · qty 1367.0 · bid tab
  • 2024-11-07 · TxDOT (Bryan district) · A00082318 · $78.00 per LF · qty 214.0 · bid tab
storm pipe 24-inchLF4$154.47$100.00 to $197.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $197.00 per LF · qty 12.0 · bid tab
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $148.95 per LF · qty 480.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $160.00 per LF · qty 855.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $100.00 per LF · qty 840.0 · bid tab
storm pipe 30-inchLF2$175.00$150.00 to $200.00
Bids
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $150.00 per LF · qty 182.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $200.00 per LF · qty 198.0 · bid tab
storm pipe 36-inchLF3$250.00$160.00 to $303.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $303.00 per LF · qty 140.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $250.00 per LF · qty 88.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $160.00 per LF · qty 158.0 · bid tab
storm pipe 42-inchLF2$296.00$220.00 to $372.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $372.00 per LF · qty 106.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $220.00 per LF · qty 38.0 · bid tab
storm pipe 48-inchLF1$478.00$478.00 to $478.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $478.00 per LF · qty 32.0 · bid tab
storm pipe (diameter not stated)LF2$212.00$105.00 to $319.00
Bids
  • 2025-07-02 · TxDOT (Bryan district) · A00187525 · $319.00 per LF · qty 50.0 · bid tab
  • 2025-05-02 · TxDOT (Bryan district) · A00133440 · $105.00 per LF · qty 40.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.