| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 10 | $106.00 | $77.18 to $158.00 | Bids- 2026-09-03 · TxDOT (Paris district) · A00139727 · $150.00 per TON · qty 683.0 · bid tab
- 2026-09-03 · TxDOT (Paris district) · A00139727 · $150.00 per TON · qty 1823.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $150.00 per TON · qty 1152.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $158.00 per TON · qty 828.0 · bid tab
- 2026-04-16 · TxDOT (Paris district) · A00220585 · $77.18 per TON · qty 1000.0 · bid tab
- 2026-04-16 · TxDOT (Paris district) · A00220585 · $94.92 per TON · qty 2000.0 · bid tab
- 2026-04-16 · TxDOT (Paris district) · A00220585 · $80.92 per TON · qty 3500.0 · bid tab
- 2025-04-17 · TxDOT (Paris district) · A00214955 · $90.00 per TON · qty 1000.0 · bid tab
- 2025-04-17 · TxDOT (Paris district) · A00214955 · $115.00 per TON · qty 4000.0 · bid tab
- 2025-04-17 · TxDOT (Paris district) · A00214955 · $97.00 per TON · qty 4000.0 · bid tab
|
| curb gutter | LF | 1 | $40.00 | $40.00 to $40.00 | Bids- 2025-02-07 · TxDOT (Paris district) · A00197744 · $40.00 per LF · qty 250.0 · bid tab
|
| excavation embankment | CY | 14 | $19.00 | $5.00 to $100.00 | Bids- 2026-09-03 · TxDOT (Paris district) · A00139727 · $10.00 per CY · qty 5908.0 · bid tab
- 2026-09-03 · TxDOT (Paris district) · A00139727 · $15.00 per CY · qty 334.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $20.00 per CY · qty 2878.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $22.00 per CY · qty 2042.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $10.00 per CY · qty 837.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $55.00 per CY · qty 3500.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $18.00 per CY · qty 2000.0 · bid tab
- 2025-01-16 · TxDOT (Paris district) · A00209399 · $60.00 per CY · qty 20.0 · bid tab
- 2025-01-08 · TxDOT (Paris district) · A00187241 · $20.00 per CY · qty 4158.0 · bid tab
- 2025-01-08 · TxDOT (Paris district) · A00187241 · $12.00 per CY · qty 1955.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed) |
| flexible base | SY | 2 | $16.00 | $14.50 to $17.50 | Bids- 2025-01-08 · TxDOT (Paris district) · A00187241 · $14.50 per SY · qty 57756.0 · bid tab
- 2024-05-02 · TxDOT · 05243034 · $17.50 per SY · qty 45782.0 · bid tab
|
| inlet headwall | EA | 3 | $18,000.00 | $12,600.00 to $22,000.00 | Bids- 2026-09-02 · TxDOT (Paris district) · A00195348 · $18,000.00 per EA · qty 2.0 · bid tab
- 2024-11-21 · TxDOT (Paris district) · A00209936 · $22,000.00 per EA · qty 1.0 · bid tab
- 2024-05-02 · TxDOT · 05243034 · $12,600.00 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | CY | 2 | $257.50 | $250.00 to $265.00 | Bids- 2026-09-03 · TxDOT (Paris district) · A00139727 · $265.00 per CY · qty 32.58 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $250.00 per CY · qty 157.0 · bid tab
|
| sidewalk | EA | 3 | $3,100.00 | $1,100.00 to $3,500.00 | Bids- 2025-02-07 · TxDOT (Paris district) · A00197744 · $3,100.00 per EA · qty 17.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $3,500.00 per EA · qty 2.0 · bid tab
- 2025-01-08 · TxDOT (Paris district) · A00187241 · $1,100.00 per EA · qty 72.0 · bid tab
|
| sidewalk | SY | 9 | $110.00 | $23.25 to $350.00 | Bids- 2026-09-03 · TxDOT (Paris district) · A00139727 · $23.25 per SY · qty 131.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $110.00 per SY · qty 55.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $35.00 per SY · qty 129.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $55.00 per SY · qty 660.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $115.00 per SY · qty 484.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $45.00 per SY · qty 6125.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $350.00 per SY · qty 8.88 · bid tab
- 2025-01-08 · TxDOT (Paris district) · A00187241 · $180.00 per SY · qty 200.0 · bid tab
- 2024-05-02 · TxDOT · 05243034 · $235.00 per SY · qty 103.0 · bid tab
|
| storm pipe 12-inch | LF | 1 | $60.00 | $60.00 to $60.00 | Bids- 2025-02-07 · TxDOT (Paris district) · A00197744 · $60.00 per LF · qty 18.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $70.00 | $70.00 to $70.00 | Bids- 2025-02-07 · TxDOT (Paris district) · A00197744 · $70.00 per LF · qty 12.0 · bid tab
|
| storm pipe 18-inch | LF | 4 | $85.00 | $50.00 to $431.00 | Bids- 2026-09-03 · TxDOT (Paris district) · A00139727 · $90.00 per LF · qty 30.0 · bid tab
- 2026-09-02 · TxDOT (Paris district) · A00195348 · $50.00 per LF · qty 54.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $80.00 per LF · qty 124.0 · bid tab
- 2025-01-08 · TxDOT (Paris district) · A00187241 · $431.00 per LF · qty 19.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $110.00 | $97.00 to $300.00 | Bids- 2025-02-07 · TxDOT (Paris district) · A00197744 · $110.00 per LF · qty 18.0 · bid tab
- 2024-11-21 · TxDOT (Paris district) · A00209936 · $300.00 per LF · qty 24.0 · bid tab
- 2024-05-02 · TxDOT · 05243034 · $97.00 per LF · qty 42.0 · bid tab
|
| storm pipe 2-inch | LF | 1 | $33.00 | $33.00 to $33.00 | Bids- 2025-02-07 · TxDOT (Paris district) · A00197744 · $33.00 per LF · qty 30.0 · bid tab
|
| storm pipe 30-inch | LF | 3 | $140.00 | $93.00 to $160.00 | Bids- 2026-09-02 · TxDOT (Paris district) · A00195348 · $93.00 per LF · qty 28.0 · bid tab
- 2025-02-07 · TxDOT (Paris district) · A00197744 · $140.00 per LF · qty 60.0 · bid tab
- 2024-05-02 · TxDOT · 05243034 · $160.00 per LF · qty 20.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $850.00 | $850.00 to $850.00 | Bids- 2025-01-08 · TxDOT (Paris district) · A00187241 · $850.00 per LF · qty 36.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $325.00 | $325.00 to $325.00 | Bids- 2024-05-02 · TxDOT · 05243034 · $325.00 per LF · qty 68.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2024-11-21 · TxDOT (Paris district) · A00209936 · $150.00 per LF · qty 60.0 · bid tab
|