Site-work prices, Palo Pinto County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON14$146.60$68.79 to $300.00
Bids
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $205.00 per TON · qty 589.0 · bid tab
  • 2026-02-05 · TxDOT (Fort Worth district) · A00210469 · $180.00 per TON · qty 13.0 · bid tab
  • 2026-02-05 · TxDOT (Fort Worth district) · A00210469 · $145.00 per TON · qty 679.0 · bid tab
  • 2026-02-04 · TxDOT (Fort Worth district) · A00063498 · $112.11 per TON · qty 574.0 · bid tab
  • 2026-02-04 · TxDOT (Fort Worth district) · A00063498 · $133.00 per TON · qty 11476.0 · bid tab
  • 2025-12-17 · TxDOT (Fort Worth district) · A00218193 · $300.00 per TON · qty 134.0 · bid tab
  • 2025-08-08 · TxDOT (Fort Worth district) · A00214046 · $175.00 per TON · qty 3000.0 · bid tab
  • 2025-04-03 · TxDOT (Fort Worth district) · A00213997 · $86.79 per TON · qty 2500.0 · bid tab
  • 2025-04-03 · TxDOT (Fort Worth district) · A00213997 · $148.20 per TON · qty 500.0 · bid tab
  • 2025-04-03 · TxDOT (Fort Worth district) · A00213997 · $68.79 per TON · qty 500.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
curb gutterLF4$40.00$40.00 to $93.28
Bids
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $40.00 per LF · qty 59.0 · bid tab
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $40.00 per LF · qty 30.0 · bid tab
  • 2026-07-01 · TxDOT (Fort Worth district) · A00218045 · $40.00 per LF · qty 48.0 · bid tab
  • 2026-02-04 · TxDOT (Fort Worth district) · A00063498 · $93.28 per LF · qty 60.0 · bid tab
excavation embankmentCY8$94.14$26.00 to $4,300.00
Bids
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $26.00 per CY · qty 706.0 · bid tab
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $26.00 per CY · qty 291.0 · bid tab
  • 2026-07-01 · TxDOT (Fort Worth district) · A00218045 · $125.00 per CY · qty 30.0 · bid tab
  • 2026-07-01 · TxDOT (Fort Worth district) · A00218045 · $95.00 per CY · qty 195.0 · bid tab
  • 2026-07-01 · TxDOT (Fort Worth district) · A00218045 · $4,300.00 per CY · qty 0.25 · bid tab
  • 2026-07-01 · TxDOT (Fort Worth district) · A00218045 · $95.00 per CY · qty 50.0 · bid tab
  • 2026-02-04 · TxDOT (Fort Worth district) · A00063498 · $93.28 per CY · qty 100.0 · bid tab
  • 2025-10-09 · TxDOT (Fort Worth district) · A00214078 · $40.00 per CY · qty 130.0 · bid tab
flexible baseCY2$59.75$28.50 to $91.00
Bids
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $91.00 per CY · qty 817.0 · bid tab
  • 2024-11-20 · TxDOT (Fort Worth district) · A00212097 · $28.50 per CY · qty 2500.0 · bid tab
flexible baseTON3$26.45$25.88 to $28.75
Bids
  • 2026-10-14 · TxDOT (Fort Worth district) · A00223874 · $25.88 per TON · qty 1250.0 · bid tab
  • 2026-10-14 · TxDOT (Fort Worth district) · A00223874 · $28.75 per TON · qty 1250.0 · bid tab
  • 2026-10-14 · TxDOT (Fort Worth district) · A00223874 · $26.45 per TON · qty 1250.0 · bid tab
inlet headwallCY2$1,877.50$1,255.00 to $2,500.00
Bids
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $1,255.00 per CY · qty 5.4 · bid tab
  • 2025-10-09 · TxDOT (Fort Worth district) · A00214078 · $2,500.00 per CY · qty 28.7 · bid tab
sidewalkEA1$500.00$500.00 to $500.00
Bids
  • 2026-07-01 · TxDOT (Fort Worth district) · A00221639 · $500.00 per EA · qty 10.0 · bid tab
sidewalkSY1$72.00$72.00 to $72.00
Bids
  • 2026-09-03 · TxDOT (Fort Worth district) · A00212859 · $72.00 per SY · qty 86.0 · bid tab