| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 23 | $142.00 | $125.00 to $383.00 | Bids- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $375.00 per TON · qty 385.0 · bid tab
- 2026-05-06 · TxDOT (Beaumont district) · A00206438 · $350.00 per TON · qty 190.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $142.00 per TON · qty 500.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $135.00 per TON · qty 200.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $137.00 per TON · qty 200.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $127.00 per TON · qty 200.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $132.00 per TON · qty 200.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $165.00 per TON · qty 1500.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $165.00 per TON · qty 1500.0 · bid tab
- 2025-12-17 · TxDOT (Beaumont district) · A00218716 · $165.00 per TON · qty 1500.0 · bid tab
(10 most recent of 23 shown; all in the Hubstake feed) |
| curb gutter | LF | 2 | $164.00 | $35.00 to $293.00 | Bids- 2025-09-05 · TxDOT (Beaumont district) · A00216203 · $293.00 per LF · qty 20.0 · bid tab
- 2025-07-02 · TxDOT (Beaumont district) · A00210032 · $35.00 per LF · qty 90.0 · bid tab
|
| excavation embankment | CY | 3 | $30.00 | $14.50 to $45.00 | Bids- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $14.50 per CY · qty 522.0 · bid tab
- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $45.00 per CY · qty 391.0 · bid tab
- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $30.00 per CY · qty 1368.0 · bid tab
|
| flexible base | CY | 1 | $175.00 | $175.00 to $175.00 | Bids- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $175.00 per CY · qty 561.0 · bid tab
|
| inlet headwall | EA | 6 | $14,950.00 | $6,985.00 to $42,085.05 | Bids- 2025-07-02 · TxDOT (Beaumont district) · A00210032 · $20,000.00 per EA · qty 1.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $7,700.00 per EA · qty 1.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $28,600.00 per EA · qty 4.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $9,900.00 per EA · qty 1.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $6,985.00 per EA · qty 1.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $42,085.05 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | CY | 3 | $270.00 | $250.00 to $300.00 | Bids- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $250.00 per CY · qty 177.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $270.00 per CY · qty 41.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $300.00 per CY · qty 36.0 · bid tab
|
| sidewalk | SY | 8 | $65.00 | $36.00 to $204.00 | Bids- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $65.70 per SY · qty 148.0 · bid tab
- 2026-05-06 · TxDOT (Beaumont district) · A00206438 · $65.00 per SY · qty 182.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $204.00 per SY · qty 327.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $65.00 per SY · qty 620.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $44.75 per SY · qty 2419.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $36.00 per SY · qty 4574.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $110.00 per SY · qty 1127.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $55.00 per SY · qty 1165.0 · bid tab
|
| storm pipe 12-inch | LF | 1 | $66.00 | $66.00 to $66.00 | Bids- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $66.00 per LF · qty 8.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $77.50 | $77.50 to $77.50 | Bids- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $77.50 per LF · qty 4.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $90.00 | $75.00 to $90.70 | Bids- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $90.00 per LF · qty 20.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $75.00 per LF · qty 92.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $90.70 per LF · qty 549.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $110.00 | $110.00 to $165.00 | Bids- 2026-05-07 · TxDOT (Beaumont district) · A00178374 · $110.00 per LF · qty 20.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $165.00 per LF · qty 28.0 · bid tab
- 2025-03-04 · TxDOT (Beaumont district) · A00197896 · $110.00 per LF · qty 38.0 · bid tab
|
| storm pipe 48-inch | LF | 2 | $404.25 | $385.00 to $423.50 | Bids- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $385.00 per LF · qty 24.0 · bid tab
- 2025-04-04 · TxDOT (Beaumont district) · A00197887 · $423.50 per LF · qty 16.0 · bid tab
|