Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON8$104.38$71.50 to $2,160.00
Bids
  • 2026-10-06 · TxDOT (Bryan district) · A00206378 · $2,160.00 per TON · qty 8.0 · bid tab
  • 2026-07-14 · TxDOT (Bryan district) · A00222517 · $89.50 per TON · qty 4000.0 · bid tab
  • 2026-07-14 · TxDOT (Bryan district) · A00222517 · $71.50 per TON · qty 200.0 · bid tab
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $250.00 per TON · qty 81.0 · bid tab
  • 2025-02-12 · TxDOT (Bryan district) · A00213846 · $93.75 per TON · qty 4000.0 · bid tab
  • 2025-02-12 · TxDOT (Bryan district) · A00213846 · $75.75 per TON · qty 200.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $115.00 per TON · qty 2382.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $170.00 per TON · qty 2351.0 · bid tab
concrete pavementSY1$300.00$300.00 to $300.00
Bids
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $300.00 per SY · qty 68.0 · bid tab
curb gutterLF7$40.00$5.00 to $238.72
Bids
  • 2026-10-06 · TxDOT (Bryan district) · A00206378 · $238.72 per LF · qty 12.0 · bid tab
  • 2026-10-06 · TxDOT (Bryan district) · A00206378 · $23.91 per LF · qty 254.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00208856 · $8.00 per LF · qty 5.4 · bid tab
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $5.00 per LF · qty 357.0 · bid tab
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $50.00 per LF · qty 360.0 · bid tab
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $40.00 per LF · qty 273.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $72.00 per LF · qty 189.0 · bid tab
excavation embankmentCY7$27.98$15.00 to $110.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $15.00 per CY · qty 21464.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $15.00 per CY · qty 21027.0 · bid tab
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $50.00 per CY · qty 415.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $48.00 per CY · qty 80.0 · bid tab
  • 2025-01-07 · TxDOT (Bryan district) · A00209280 · $110.00 per CY · qty 524.0 · bid tab
  • 2024-05-03 · TxDOT · 05243240 · $27.98 per CY · qty 106.0 · bid tab
  • 2024-05-03 · TxDOT · 05243240 · $23.83 per CY · qty 91.0 · bid tab
flexible baseCY1$65.00$65.00 to $65.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $65.00 per CY · qty 41907.0 · bid tab
flexible baseSY2$40.48$16.00 to $64.97
Bids
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $16.00 per SY · qty 6187.0 · bid tab
  • 2024-05-03 · TxDOT · 05243240 · $64.97 per SY · qty 750.0 · bid tab
inlet headwallEA4$10,500.00$7,500.00 to $27,835.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $10,000.00 per EA · qty 1.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $7,500.00 per EA · qty 2.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $11,000.00 per EA · qty 2.0 · bid tab
  • 2025-01-07 · TxDOT (Bryan district) · A00209280 · $27,835.00 per EA · qty 2.0 · bid tab
lime cement stabilizationCY2$207.91$165.81 to $250.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $250.00 per CY · qty 103.0 · bid tab
  • 2024-05-03 · TxDOT · 05243240 · $165.81 per CY · qty 104.0 · bid tab
lime cement stabilizationSY5$2.25$1.60 to $4.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $1.60 per SY · qty 143219.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $2.25 per SY · qty 137231.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $4.00 per SY · qty 54945.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $2.75 per SY · qty 6930.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $2.00 per SY · qty 6930.0 · bid tab
lime cement stabilizationTON4$276.00$200.00 to $1,200.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $210.00 per TON · qty 3559.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $342.00 per TON · qty 1546.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $200.00 per TON · qty 35.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $1,200.00 per TON · qty 35.0 · bid tab
sidewalkSY16$154.18$28.00 to $500.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $55.00 per SY · qty 1866.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $28.00 per SY · qty 4033.0 · bid tab
  • 2026-10-06 · TxDOT (Bryan district) · A00206378 · $158.35 per SY · qty 17.0 · bid tab
  • 2026-10-06 · TxDOT (Bryan district) · A00206378 · $181.66 per SY · qty 173.0 · bid tab
  • 2026-10-06 · TxDOT (Bryan district) · A00206378 · $33.11 per SY · qty 82.0 · bid tab
  • 2026-10-06 · TxDOT (Bryan district) · A00206378 · $111.81 per SY · qty 28.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00208856 · $310.00 per SY · qty 35.3 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00208856 · $410.00 per SY · qty 23.7 · bid tab
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $100.00 per SY · qty 822.0 · bid tab
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $150.00 per SY · qty 33.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed)
storm pipe 18-inchLF2$60.00$55.00 to $65.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $55.00 per LF · qty 1060.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $65.00 per LF · qty 448.0 · bid tab
storm pipe 24-inchLF3$90.00$75.00 to $220.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $75.00 per LF · qty 806.0 · bid tab
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $90.00 per LF · qty 502.0 · bid tab
  • 2025-02-07 · TxDOT (Bryan district) · A00193298 · $220.00 per LF · qty 12.0 · bid tab
storm pipe 30-inchLF1$120.00$120.00 to $120.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $120.00 per LF · qty 928.0 · bid tab
storm pipe 36-inchLF1$175.00$175.00 to $175.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $175.00 per LF · qty 70.0 · bid tab
storm pipe 48-inchLF1$250.00$250.00 to $250.00
Bids
  • 2026-11-04 · TxDOT (Bryan district) · A00206631 · $250.00 per LF · qty 54.0 · bid tab
storm pipe 5-inchLF1$50.00$50.00 to $50.00
Bids
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $50.00 per LF · qty 8.0 · bid tab
storm pipe 6-inchLF1$100.00$100.00 to $100.00
Bids
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $100.00 per LF · qty 2.0 · bid tab
storm pipe 8-inchLF1$100.00$100.00 to $100.00
Bids
  • 2025-06-04 · TxDOT (Bryan district) · A00190494 · $100.00 per LF · qty 4.0 · bid tab