| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 11 | $110.00 | $82.00 to $225.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $225.00 per TON · qty 205.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $95.00 per TON · qty 16433.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $110.00 per TON · qty 63560.0 · bid tab
- 2025-06-10 · TxDOT (Bryan district) · A00215287 · $93.00 per TON · qty 2000.0 · bid tab
- 2025-06-10 · TxDOT (Bryan district) · A00215287 · $82.00 per TON · qty 1000.0 · bid tab
- 2025-06-10 · TxDOT (Bryan district) · A00215287 · $94.00 per TON · qty 2000.0 · bid tab
- 2025-06-10 · TxDOT (Bryan district) · A00215287 · $83.00 per TON · qty 1000.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $135.00 per TON · qty 2223.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $190.00 per TON · qty 2558.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $125.00 per TON · qty 910.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed) |
| curb gutter | LF | 6 | $27.60 | $4.00 to $44.00 | Bids- 2025-12-09 · TxDOT (Bryan district) · A00217158 · $20.20 per LF · qty 348.0 · bid tab
- 2025-12-09 · TxDOT (Bryan district) · A00217158 · $20.20 per LF · qty 125.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $35.00 per LF · qty 152.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $4.00 per LF · qty 29.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $43.00 per LF · qty 1126.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $44.00 per LF · qty 7.0 · bid tab
|
| excavation embankment | CY | 7 | $18.00 | $15.00 to $48.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $18.00 per CY · qty 1501.0 · bid tab
- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $18.00 per CY · qty 556.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $15.00 per CY · qty 14374.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $15.00 per CY · qty 71957.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $48.00 per CY · qty 424.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $30.00 per CY · qty 1888.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $21.00 per CY · qty 2076.0 · bid tab
|
| flexible base | SY | 3 | $28.00 | $14.00 to $40.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $40.00 per SY · qty 4372.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $14.00 per SY · qty 120339.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $28.00 per SY · qty 4133.0 · bid tab
|
| inlet headwall | EA | 13 | $14,000.00 | $4,500.00 to $60,000.00 | Bids- 2025-12-09 · TxDOT (Bryan district) · A00217158 · $4,500.00 per EA · qty 1.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $5,500.00 per EA · qty 2.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $20,000.00 per EA · qty 1.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $15,000.00 per EA · qty 1.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $11,000.00 per EA · qty 1.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $60,000.00 per EA · qty 2.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $22,000.00 per EA · qty 1.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $12,000.00 per EA · qty 3.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $19,000.00 per EA · qty 1.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $7,000.00 per EA · qty 7.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| lime cement stabilization | CY | 1 | $275.00 | $275.00 to $275.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $275.00 per CY · qty 304.3 · bid tab
|
| lime cement stabilization | SY | 2 | $4.50 | $3.00 to $6.00 | Bids- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $3.00 per SY · qty 120339.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $6.00 per SY · qty 4133.0 · bid tab
|
| lime cement stabilization | TON | 2 | $260.00 | $210.00 to $310.00 | Bids- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $210.00 per TON · qty 1492.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $310.00 per TON · qty 52.0 · bid tab
|
| sidewalk | EA | 2 | $2,650.00 | $2,600.00 to $2,700.00 | Bids- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $2,700.00 per EA · qty 4.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $2,600.00 per EA · qty 4.0 · bid tab
|
| sidewalk | SY | 8 | $71.50 | $33.00 to $135.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $75.00 per SY · qty 41.0 · bid tab
- 2025-12-09 · TxDOT (Bryan district) · A00217158 · $65.85 per SY · qty 84.0 · bid tab
- 2025-12-09 · TxDOT (Bryan district) · A00217158 · $75.25 per SY · qty 15.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $55.00 per SY · qty 4939.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $135.00 per SY · qty 95.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $96.00 per SY · qty 1334.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $68.00 per SY · qty 749.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $33.00 per SY · qty 2111.0 · bid tab
|
| storm pipe 18-inch | LF | 5 | $69.00 | $60.00 to $100.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $65.00 per LF · qty 40.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $60.00 per LF · qty 2640.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $100.00 per LF · qty 6.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $69.00 per LF · qty 290.0 · bid tab
- 2025-04-03 · TxDOT (Bryan district) · A00184478 · $78.00 per LF · qty 88.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $95.00 | $90.00 to $125.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $90.00 per LF · qty 74.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $95.00 per LF · qty 1345.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $125.00 per LF · qty 20.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $120.00 | $120.00 to $120.00 | Bids- 2026-08-05 · TxDOT (Bryan district) · A00189992 · $120.00 per LF · qty 95.0 · bid tab
|
| storm pipe 36-inch | LF | 2 | $215.00 | $180.00 to $250.00 | Bids- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $180.00 per LF · qty 76.0 · bid tab
- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $250.00 per LF · qty 20.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $300.00 | $300.00 to $300.00 | Bids- 2025-08-08 · TxDOT (Bryan district) · A00127561 · $300.00 per LF · qty 8.0 · bid tab
|