PadstakeGet the fee reports
Menu

Site-work prices, Leon County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$110.00$82.00 to $225.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $225.00 per TON · qty 205.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $95.00 per TON · qty 16433.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $110.00 per TON · qty 63560.0 · bid tab
  • 2025-06-10 · TxDOT (Bryan district) · A00215287 · $93.00 per TON · qty 2000.0 · bid tab
  • 2025-06-10 · TxDOT (Bryan district) · A00215287 · $82.00 per TON · qty 1000.0 · bid tab
  • 2025-06-10 · TxDOT (Bryan district) · A00215287 · $94.00 per TON · qty 2000.0 · bid tab
  • 2025-06-10 · TxDOT (Bryan district) · A00215287 · $83.00 per TON · qty 1000.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $135.00 per TON · qty 2223.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $190.00 per TON · qty 2558.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $125.00 per TON · qty 910.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
curb gutterLF6$27.60$4.00 to $44.00
Bids
  • 2025-12-09 · TxDOT (Bryan district) · A00217158 · $20.20 per LF · qty 348.0 · bid tab
  • 2025-12-09 · TxDOT (Bryan district) · A00217158 · $20.20 per LF · qty 125.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $35.00 per LF · qty 152.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $4.00 per LF · qty 29.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $43.00 per LF · qty 1126.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $44.00 per LF · qty 7.0 · bid tab
excavation embankmentCY7$18.00$15.00 to $48.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $18.00 per CY · qty 1501.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $18.00 per CY · qty 556.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $15.00 per CY · qty 14374.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $15.00 per CY · qty 71957.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $48.00 per CY · qty 424.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $30.00 per CY · qty 1888.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $21.00 per CY · qty 2076.0 · bid tab
flexible baseSY3$28.00$14.00 to $40.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $40.00 per SY · qty 4372.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $14.00 per SY · qty 120339.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $28.00 per SY · qty 4133.0 · bid tab
inlet headwallEA13$14,000.00$4,500.00 to $60,000.00
Bids
  • 2025-12-09 · TxDOT (Bryan district) · A00217158 · $4,500.00 per EA · qty 1.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $5,500.00 per EA · qty 2.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $20,000.00 per EA · qty 1.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $15,000.00 per EA · qty 1.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $11,000.00 per EA · qty 1.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $60,000.00 per EA · qty 2.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $22,000.00 per EA · qty 1.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $12,000.00 per EA · qty 3.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $19,000.00 per EA · qty 1.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $7,000.00 per EA · qty 7.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
lime cement stabilizationCY1$275.00$275.00 to $275.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $275.00 per CY · qty 304.3 · bid tab
lime cement stabilizationSY2$4.50$3.00 to $6.00
Bids
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $3.00 per SY · qty 120339.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $6.00 per SY · qty 4133.0 · bid tab
lime cement stabilizationTON2$260.00$210.00 to $310.00
Bids
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $210.00 per TON · qty 1492.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $310.00 per TON · qty 52.0 · bid tab
sidewalkEA2$2,650.00$2,600.00 to $2,700.00
Bids
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $2,700.00 per EA · qty 4.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $2,600.00 per EA · qty 4.0 · bid tab
sidewalkSY8$71.50$33.00 to $135.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $75.00 per SY · qty 41.0 · bid tab
  • 2025-12-09 · TxDOT (Bryan district) · A00217158 · $65.85 per SY · qty 84.0 · bid tab
  • 2025-12-09 · TxDOT (Bryan district) · A00217158 · $75.25 per SY · qty 15.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $55.00 per SY · qty 4939.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $135.00 per SY · qty 95.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $96.00 per SY · qty 1334.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $68.00 per SY · qty 749.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $33.00 per SY · qty 2111.0 · bid tab
storm pipe 18-inchLF5$69.00$60.00 to $100.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $65.00 per LF · qty 40.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $60.00 per LF · qty 2640.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $100.00 per LF · qty 6.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $69.00 per LF · qty 290.0 · bid tab
  • 2025-04-03 · TxDOT (Bryan district) · A00184478 · $78.00 per LF · qty 88.0 · bid tab
storm pipe 24-inchLF3$95.00$90.00 to $125.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $90.00 per LF · qty 74.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $95.00 per LF · qty 1345.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $125.00 per LF · qty 20.0 · bid tab
storm pipe 30-inchLF1$120.00$120.00 to $120.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00189992 · $120.00 per LF · qty 95.0 · bid tab
storm pipe 36-inchLF2$215.00$180.00 to $250.00
Bids
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $180.00 per LF · qty 76.0 · bid tab
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $250.00 per LF · qty 20.0 · bid tab
storm pipe 48-inchLF1$300.00$300.00 to $300.00
Bids
  • 2025-08-08 · TxDOT (Bryan district) · A00127561 · $300.00 per LF · qty 8.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.