| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 9 | $90.00 | $60.50 to $367.00 | Bids- 2026-03-24 · TxDOT (Brownwood district) · A00220013 · $87.25 per TON · qty 1500.0 · bid tab
- 2026-03-24 · TxDOT (Brownwood district) · A00220013 · $65.25 per TON · qty 500.0 · bid tab
- 2026-03-24 · TxDOT (Brownwood district) · A00220013 · $60.50 per TON · qty 500.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $78.00 per TON · qty 132877.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $115.00 per TON · qty 5000.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $90.00 per TON · qty 84507.0 · bid tab
- 2025-01-08 · TxDOT (Brownwood district) · A00141141 · $125.00 per TON · qty 4749.0 · bid tab
- 2025-01-08 · TxDOT (Brownwood district) · A00141141 · $134.00 per TON · qty 757.0 · bid tab
- 2024-10-01 · TxDOT (Brownwood district) · A00135676 · $367.00 per TON · qty 184.0 · bid tab
|
| excavation embankment | CY | 6 | $11.00 | $8.00 to $33.50 | Bids- 2026-06-02 · TxDOT (Brownwood district) · A00215276 · $11.00 per CY · qty 34690.0 · bid tab
- 2026-06-02 · TxDOT (Brownwood district) · A00215276 · $11.00 per CY · qty 33000.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $8.00 per CY · qty 176493.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $10.00 per CY · qty 460083.0 · bid tab
- 2024-10-01 · TxDOT (Brownwood district) · A00135676 · $33.50 per CY · qty 295.0 · bid tab
- 2024-10-01 · TxDOT (Brownwood district) · A00135676 · $31.90 per CY · qty 423.0 · bid tab
|
| flexible base | CY | 3 | $54.00 | $45.00 to $122.00 | Bids- 2026-06-02 · TxDOT (Brownwood district) · A00215276 · $54.00 per CY · qty 32522.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $45.00 per CY · qty 187312.0 · bid tab
- 2024-10-01 · TxDOT (Brownwood district) · A00135676 · $122.00 per CY · qty 276.0 · bid tab
|
| inlet headwall | EA | 14 | $19,000.00 | $10,000.00 to $100,000.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $100,000.00 per EA · qty 2.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $13,000.00 per EA · qty 2.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $20,000.00 per EA · qty 3.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $50,000.00 per EA · qty 1.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $17,000.00 per EA · qty 1.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $13,000.00 per EA · qty 3.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $65,000.00 per EA · qty 1.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $25,000.00 per EA · qty 2.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $30,000.00 per EA · qty 1.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $10,000.00 per EA · qty 2.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed) |
| lime cement stabilization | CY | 1 | $294.00 | $294.00 to $294.00 | Bids- 2024-10-01 · TxDOT (Brownwood district) · A00135676 · $294.00 per CY · qty 40.0 · bid tab
|
| lime cement stabilization | SY | 1 | $7.00 | $7.00 to $7.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $7.00 per SY · qty 5000.0 · bid tab
|
| lime cement stabilization | TON | 1 | $250.00 | $250.00 to $250.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $250.00 per TON · qty 84.0 · bid tab
|
| sidewalk | SY | 4 | $37.00 | $21.00 to $130.00 | Bids- 2026-06-02 · TxDOT (Brownwood district) · A00215276 · $40.00 per SY · qty 943.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $34.00 per SY · qty 9491.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $21.00 per SY · qty 2539.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $130.00 per SY · qty 698.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $75.00 | $75.00 to $75.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $75.00 per LF · qty 3394.0 · bid tab
|
| storm pipe 27-inch | LF | 1 | $90.00 | $90.00 to $90.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $90.00 per LF · qty 121.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $100.00 | $100.00 to $100.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $100.00 per LF · qty 166.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $105.00 | $105.00 to $105.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $105.00 per LF · qty 301.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $125.00 | $125.00 to $125.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $125.00 per LF · qty 95.0 · bid tab
|
| storm pipe 66-inch | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $250.00 per LF · qty 31.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 2 | $105.00 | $90.00 to $120.00 | Bids- 2026-06-02 · TxDOT (Brownwood district) · A00215276 · $90.00 per LF · qty 60.0 · bid tab
- 2025-10-09 · TxDOT (Brownwood district) · A00020886 · $120.00 per LF · qty 137.5 · bid tab
|