PadstakeGet the fee reports
Menu

Site-work prices, Kerr County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON5$129.97$114.62 to $205.00
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $129.97 per TON · qty 2256.0 · bid tab
  • 2026-01-07 · TxDOT (San Antonio district) · A00218569 · $114.62 per TON · qty 5610.0 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $205.00 per TON · qty 195.0 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $205.00 per TON · qty 112.0 · bid tab
  • 2025-02-07 · TxDOT (San Antonio district) · A00207189 · $120.00 per TON · qty 1000.0 · bid tab
curb gutterLF5$27.11$12.15 to $288.15
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $27.11 per LF · qty 61.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $45.65 per LF · qty 136.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $288.15 per LF · qty 42.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $15.93 per LF · qty 4672.0 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $12.15 per LF · qty 179.0 · bid tab
excavation embankmentCY3$50.00$41.88 to $55.00
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $41.88 per CY · qty 694.0 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $55.00 per CY · qty 28.0 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $50.00 per CY · qty 27.0 · bid tab
fire hydrantEA1$6,497.01$6,497.01 to $6,497.01
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $6,497.01 per EA · qty 1.0 · bid tab
inlet headwallEA18$11,615.99$7,780.93 to $38,500.00
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $11,823.25 per EA · qty 1.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $14,862.31 per EA · qty 1.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $8,550.56 per EA · qty 1.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $12,741.64 per EA · qty 5.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $7,780.93 per EA · qty 4.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $8,887.47 per EA · qty 1.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $12,152.08 per EA · qty 1.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $9,944.22 per EA · qty 3.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $12,519.31 per EA · qty 2.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $9,645.44 per EA · qty 6.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed)
lime cement stabilizationCY2$149.38$142.50 to $156.26
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $156.26 per CY · qty 3956.7 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $142.50 per CY · qty 154.0 · bid tab
sidewalkSY15$103.50$62.50 to $325.80
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $109.07 per SY · qty 10.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $83.12 per SY · qty 948.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $91.54 per SY · qty 19.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $119.96 per SY · qty 47.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $104.52 per SY · qty 16.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $103.50 per SY · qty 70.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $154.09 per SY · qty 6.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $96.39 per SY · qty 1642.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $108.28 per SY · qty 57.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $67.04 per SY · qty 2386.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed)
storm pipe 18-inchLF2$87.25$86.58 to $87.93
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $86.58 per LF · qty 534.0 · bid tab
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $87.93 per LF · qty 90.0 · bid tab
storm pipe 24-inchLF1$106.85$106.85 to $106.85
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $106.85 per LF · qty 403.0 · bid tab
storm pipe 30-inchLF1$141.79$141.79 to $141.79
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $141.79 per LF · qty 45.0 · bid tab
storm pipe 36-inchLF2$167.47$151.50 to $183.45
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $183.45 per LF · qty 8.0 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $151.50 per LF · qty 82.0 · bid tab
water main 8-inchLF2$112.55$80.00 to $145.10
Bids
  • 2026-06-03 · TxDOT (San Antonio district) · A00186691 · $145.10 per LF · qty 205.0 · bid tab
  • 2025-04-03 · TxDOT (San Antonio district) · A00139936 · $80.00 per LF · qty 56.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.