PadstakeGet the fee reports
Menu

Site-work prices, Hood County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON12$135.00$100.00 to $385.00
Bids
  • 2026-04-08 · TxDOT (Fort Worth district) · A00037264 · $385.00 per TON · qty 90.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $135.00 per TON · qty 4394.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $135.00 per TON · qty 7326.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $190.00 per TON · qty 6038.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $185.00 per TON · qty 9367.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $250.00 per TON · qty 365.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $175.00 per TON · qty 1126.0 · bid tab
  • 2024-12-03 · TxDOT (Fort Worth district) · A00212555 · $130.00 per TON · qty 4000.0 · bid tab
  • 2024-12-03 · TxDOT (Fort Worth district) · A00212555 · $100.00 per TON · qty 1000.0 · bid tab
  • 2024-12-03 · TxDOT (Fort Worth district) · A00212555 · $130.00 per TON · qty 600.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
excavation embankmentCY6$30.00$21.00 to $60.00
Bids
  • 2026-04-08 · TxDOT (Fort Worth district) · A00037264 · $30.00 per CY · qty 858.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $25.00 per CY · qty 11190.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $21.00 per CY · qty 6941.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $60.00 per CY · qty 100.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $35.00 per CY · qty 6428.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $30.00 per CY · qty 276.0 · bid tab
flexible baseCY2$70.00$60.00 to $80.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $60.00 per CY · qty 333.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $80.00 per CY · qty 5179.0 · bid tab
flexible baseSY2$25.00$25.00 to $25.00
Bids
  • 2026-04-08 · TxDOT (Fort Worth district) · A00037264 · $25.00 per SY · qty 857.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $25.00 per SY · qty 3439.0 · bid tab
inlet headwallEA8$13,500.00$6,000.00 to $18,000.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $10,000.00 per EA · qty 4.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $10,000.00 per EA · qty 1.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $18,000.00 per EA · qty 2.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $18,000.00 per EA · qty 2.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $17,000.00 per EA · qty 3.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $9,000.00 per EA · qty 2.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $6,000.00 per EA · qty 2.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $18,000.00 per EA · qty 1.0 · bid tab
lime cement stabilizationCY3$220.00$200.00 to $565.00
Bids
  • 2026-04-08 · TxDOT (Fort Worth district) · A00037264 · $200.00 per CY · qty 92.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $565.00 per CY · qty 136.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $220.00 per CY · qty 164.0 · bid tab
lime cement stabilizationSY1$6.00$6.00 to $6.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $6.00 per SY · qty 37483.0 · bid tab
lime cement stabilizationTON1$280.00$280.00 to $280.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $280.00 per TON · qty 401.0 · bid tab
sidewalkSY5$65.00$50.00 to $155.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $50.00 per SY · qty 3942.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $155.00 per SY · qty 1193.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $56.00 per SY · qty 941.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $65.00 per SY · qty 927.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $120.00 per SY · qty 59.0 · bid tab
storm pipe 18-inchLF1$82.00$82.00 to $82.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $82.00 per LF · qty 1406.0 · bid tab
storm pipe 24-inchLF3$120.00$105.00 to $130.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $120.00 per LF · qty 248.0 · bid tab
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $105.00 per LF · qty 552.0 · bid tab
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $130.00 per LF · qty 37.0 · bid tab
storm pipe 30-inchLF1$130.00$130.00 to $130.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $130.00 per LF · qty 118.0 · bid tab
storm pipe 42-inchLF1$200.00$200.00 to $200.00
Bids
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $200.00 per LF · qty 54.0 · bid tab
storm pipe 48-inchLF1$300.00$300.00 to $300.00
Bids
  • 2025-06-04 · TxDOT (Fort Worth district) · A00065080 · $300.00 per LF · qty 281.0 · bid tab
storm pipe (diameter not stated)LF1$97.00$97.00 to $97.00
Bids
  • 2025-07-02 · TxDOT (Fort Worth district) · A00201583 · $97.00 per LF · qty 250.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.