Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON10$132.50$98.00 to $175.00
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $98.00 per TON · qty 77395.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $121.00 per TON · qty 169312.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $102.00 per TON · qty 157288.0 · bid tab
  • 2025-04-23 · TxDOT (Amarillo district) · A00214701 · $155.00 per TON · qty 500.0 · bid tab
  • 2025-04-23 · TxDOT (Amarillo district) · A00214701 · $165.00 per TON · qty 500.0 · bid tab
  • 2025-04-23 · TxDOT (Amarillo district) · A00214701 · $130.00 per TON · qty 500.0 · bid tab
  • 2025-04-23 · TxDOT (Amarillo district) · A00214701 · $145.00 per TON · qty 500.0 · bid tab
  • 2025-04-23 · TxDOT (Amarillo district) · A00214701 · $175.00 per TON · qty 500.0 · bid tab
  • 2025-04-23 · TxDOT (Amarillo district) · A00214701 · $115.00 per TON · qty 1500.0 · bid tab
  • 2025-04-23 · TxDOT (Amarillo district) · A00214701 · $135.00 per TON · qty 500.0 · bid tab
concrete pavementSY1$150.00$150.00 to $150.00
Bids
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $150.00 per SY · qty 14778.0 · bid tab
excavation embankmentCY5$9.50$3.65 to $29.70
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $29.70 per CY · qty 2671.0 · bid tab
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $20.30 per CY · qty 4739.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $7.00 per CY · qty 263404.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $9.50 per CY · qty 89780.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $3.65 per CY · qty 358999.0 · bid tab
flexible baseSY3$23.50$17.00 to $27.65
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $27.65 per SY · qty 23370.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $23.50 per SY · qty 580662.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $17.00 per SY · qty 83547.0 · bid tab
inlet headwallEA3$37,500.00$10,000.00 to $38,000.00
Bids
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $10,000.00 per EA · qty 5.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $37,500.00 per EA · qty 2.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $38,000.00 per EA · qty 1.0 · bid tab
lime cement stabilizationSY2$3.03$2.70 to $3.35
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $3.35 per SY · qty 23370.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $2.70 per SY · qty 596014.0 · bid tab
lime cement stabilizationTON2$360.00$250.00 to $470.00
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $250.00 per TON · qty 274.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $470.00 per TON · qty 6431.0 · bid tab
sidewalkSY2$28.00$6.00 to $50.00
Bids
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $6.00 per SY · qty 6517.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $50.00 per SY · qty 4993.0 · bid tab
storm pipe 24-inchLF2$190.00$130.00 to $250.00
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $250.00 per LF · qty 26.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $130.00 per LF · qty 4007.0 · bid tab
storm pipe 36-inchLF1$465.00$465.00 to $465.00
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $465.00 per LF · qty 4.0 · bid tab
storm pipe 48-inchLF2$402.50$355.00 to $450.00
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $450.00 per LF · qty 14.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $355.00 per LF · qty 4.0 · bid tab
storm pipe 4-inchLF1$100.00$100.00 to $100.00
Bids
  • 2025-12-02 · TxDOT (Amarillo district) · A00206578 · $100.00 per LF · qty 30.0 · bid tab
storm pipe 60-inchLF1$555.00$555.00 to $555.00
Bids
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $555.00 per LF · qty 372.0 · bid tab
storm pipe (diameter not stated)LF3$275.00$250.00 to $335.00
Bids
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $275.00 per LF · qty 1092.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $250.00 per LF · qty 2146.0 · bid tab
  • 2025-09-04 · TxDOT (Amarillo district) · A00127796 · $335.00 per LF · qty 164.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.