| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 25 | $102.00 | $70.00 to $200.00 | Bids- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $96.38 per TON · qty 2583.0 · bid tab
- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $117.27 per TON · qty 1590.0 · bid tab
- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $98.54 per TON · qty 1122.0 · bid tab
- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $109.62 per TON · qty 119.0 · bid tab
- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $107.34 per TON · qty 272.0 · bid tab
- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $159.52 per TON · qty 47.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $102.00 per TON · qty 13576.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $80.00 per TON · qty 60514.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $92.00 per TON · qty 17380.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $97.90 per TON · qty 1086.0 · bid tab
(10 most recent of 25 shown; all in the Hubstake feed) |
| concrete pavement | SY | 2 | $111.58 | $97.15 to $126.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $126.00 per SY · qty 2179.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $97.15 per SY · qty 518.0 · bid tab
|
| curb gutter | LF | 8 | $24.50 | $1.00 to $390.00 | Bids- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $25.00 per LF · qty 680.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $390.00 per LF · qty 33.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $24.00 per LF · qty 195.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $11.75 per LF · qty 50147.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $46.20 per LF · qty 331.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $14.70 per LF · qty 3966.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $46.20 per LF · qty 450.0 · bid tab
- 2025-07-02 · TxDOT (San Antonio district) · A00214915 · $1.00 per LF · qty 15.0 · bid tab
|
| excavation embankment | CY | 15 | $23.50 | $1.00 to $350.00 | Bids- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $35.97 per CY · qty 424.0 · bid tab
- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $35.97 per CY · qty 1307.0 · bid tab
- 2026-07-22 · TxDOT (San Antonio district) · A00219576 · $350.00 per CY · qty 45.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $23.50 per CY · qty 27740.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $25.50 per CY · qty 47194.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $13.50 per CY · qty 57959.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $22.00 per CY · qty 282.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $18.70 per CY · qty 14205.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $3.30 per CY · qty 27494.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $16.50 per CY · qty 27.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed) |
| fire hydrant | EA | 1 | $8,600.00 | $8,600.00 to $8,600.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $8,600.00 per EA · qty 13.0 · bid tab
|
| flexible base | CY | 5 | $60.00 | $53.13 to $263.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $60.00 per CY · qty 30452.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $53.13 per CY · qty 2315.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $56.63 per CY · qty 25982.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $263.00 per CY · qty 21.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $63.00 per CY · qty 1325.0 · bid tab
|
| flexible base | SY | 1 | $14.42 | $14.42 to $14.42 | Bids- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $14.42 per SY · qty 9148.0 · bid tab
|
| inlet headwall | EA | 21 | $10,000.00 | $80.00 to $44,000.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $15,600.00 per EA · qty 98.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $9,500.00 per EA · qty 3.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $31,000.00 per EA · qty 2.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $14,000.00 per EA · qty 1.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $44,000.00 per EA · qty 1.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $27,000.00 per EA · qty 2.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $14,100.00 per EA · qty 2.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $44,000.00 per EA · qty 4.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $10,000.00 per EA · qty 1.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $6,229.58 per EA · qty 1.0 · bid tab
(10 most recent of 21 shown; all in the Hubstake feed) |
| lime cement stabilization | CY | 3 | $161.00 | $125.00 to $210.00 | Bids- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $125.00 per CY · qty 340.3 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $161.00 per CY · qty 4798.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $210.00 per CY · qty 68.0 · bid tab
|
| lime cement stabilization | SY | 4 | $2.99 | $2.95 to $4.40 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $3.00 per SY · qty 121310.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $4.40 per SY · qty 10785.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $2.97 per SY · qty 121876.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $2.95 per SY · qty 6191.0 · bid tab
|
| lime cement stabilization | TON | 4 | $318.00 | $302.00 to $385.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $302.00 per TON · qty 3639.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $385.00 per TON · qty 263.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $330.00 per TON · qty 2918.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $306.00 per TON · qty 75.0 · bid tab
|
| manhole | EA | 1 | $4,300.00 | $4,300.00 to $4,300.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $4,300.00 per EA · qty 3.0 · bid tab
|
| sidewalk | EA | 14 | $2,900.00 | $2,263.74 to $9,200.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $2,900.00 per EA · qty 6.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $5,300.00 per EA · qty 4.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $2,900.00 per EA · qty 18.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $2,900.00 per EA · qty 4.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $2,900.00 per EA · qty 11.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $2,900.00 per EA · qty 4.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $2,900.00 per EA · qty 6.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $9,200.00 per EA · qty 1.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $2,673.23 per EA · qty 1.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $2,673.23 per EA · qty 1.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed) |
| sidewalk | SY | 11 | $85.00 | $47.85 to $120.75 | Bids- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $106.89 per SY · qty 824.0 · bid tab
- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $47.85 per SY · qty 349.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $65.00 per SY · qty 4447.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $85.00 per SY · qty 2729.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $55.00 per SY · qty 24858.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $95.55 per SY · qty 704.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $120.75 per SY · qty 668.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $82.95 per SY · qty 505.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $109.96 per SY · qty 319.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $50.60 per SY · qty 3582.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed) |
| storm pipe 12-inch | LF | 2 | $58.50 | $3.00 to $114.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $114.00 per LF · qty 150.0 · bid tab
- 2025-07-02 · TxDOT (San Antonio district) · A00214915 · $3.00 per LF · qty 100.0 · bid tab
|
| storm pipe 18-inch | LF | 5 | $113.00 | $74.98 to $152.34 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $100.00 per LF · qty 160.0 · bid tab
- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $152.34 per LF · qty 42.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $74.98 per LF · qty 78.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $113.00 per LF · qty 96.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $134.00 per LF · qty 22.0 · bid tab
|
| storm pipe 19-inch | LF | 1 | $4.00 | $4.00 to $4.00 | Bids- 2025-07-02 · TxDOT (San Antonio district) · A00214915 · $4.00 per LF · qty 100.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $113.04 | $110.00 to $150.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $110.00 per LF · qty 2333.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $113.04 per LF · qty 80.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $150.00 per LF · qty 57.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $177.64 | $177.64 to $177.64 | Bids- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $177.64 per LF · qty 112.0 · bid tab
|
| storm pipe 36-inch | LF | 2 | $248.04 | $229.62 to $266.46 | Bids- 2026-06-02 · TxDOT (San Antonio district) · A00065051 · $229.62 per LF · qty 1095.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $266.46 per LF · qty 40.0 · bid tab
|
| storm pipe 72-inch | LF | 1 | $1,903.26 | $1,903.26 to $1,903.26 | Bids- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $1,903.26 per LF · qty 10.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 5 | $225.00 | $180.00 to $426.79 | Bids- 2026-08-06 · TxDOT (San Antonio district) · A00136986 · $211.95 per LF · qty 74.0 · bid tab
- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $180.00 per LF · qty 100.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $426.79 per LF · qty 154.0 · bid tab
- 2026-05-07 · TxDOT (San Antonio district) · A00187130 · $321.82 per LF · qty 305.0 · bid tab
- 2025-01-08 · TxDOT (San Antonio district) · A00178602 · $225.00 per LF · qty 66.0 · bid tab
|
| water main 12-inch | LF | 1 | $100.00 | $100.00 to $100.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $100.00 per LF · qty 7289.0 · bid tab
|
| water main 4-inch | LF | 1 | $61.00 | $61.00 to $61.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $61.00 per LF · qty 128.0 · bid tab
|
| water main 6-inch | LF | 1 | $71.00 | $71.00 to $71.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $71.00 per LF · qty 61.0 · bid tab
|
| water main 8-inch | LF | 1 | $98.00 | $98.00 to $98.00 | Bids- 2026-06-03 · TxDOT (San Antonio district) · A00062698 · $98.00 per LF · qty 121.0 · bid tab
|