Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON12$115.00$69.00 to $300.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $120.00 per TON · qty 831.0 · bid tab
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $140.00 per TON · qty 1863.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $200.00 per TON · qty 42.0 · bid tab
  • 2026-01-06 · TxDOT (Bryan district) · A00211861 · $187.00 per TON · qty 1646.0 · bid tab
  • 2025-12-10 · TxDOT (Bryan district) · A00218326 · $69.00 per TON · qty 400.0 · bid tab
  • 2025-12-10 · TxDOT (Bryan district) · A00218326 · $90.00 per TON · qty 3000.0 · bid tab
  • 2025-01-15 · TxDOT (Bryan district) · A00213195 · $110.00 per TON · qty 4000.0 · bid tab
  • 2025-01-15 · TxDOT (Bryan district) · A00213195 · $95.00 per TON · qty 200.0 · bid tab
  • 2024-11-06 · TxDOT (Bryan district) · A00190497 · $300.00 per TON · qty 185.0 · bid tab
  • 2024-06-06 · TxDOT · 06243216 · $103.00 per TON · qty 12878.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
curb gutterLF7$40.00$20.00 to $150.00
Bids
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $40.00 per LF · qty 52.5 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $150.00 per LF · qty 573.9 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $150.00 per LF · qty 182.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $40.00 per LF · qty 111.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $20.00 per LF · qty 4092.6 · bid tab
  • 2024-11-06 · TxDOT (Bryan district) · A00190497 · $40.00 per LF · qty 14.0 · bid tab
  • 2024-11-06 · TxDOT (Bryan district) · A00190497 · $20.00 per LF · qty 2118.0 · bid tab
excavation embankmentCY16$23.75$5.00 to $182.00
Bids
  • 2026-07-14 · TxDOT (Bryan district) · A00220258 · $35.00 per CY · qty 25.0 · bid tab
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $16.00 per CY · qty 1555.0 · bid tab
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $13.00 per CY · qty 1550.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $40.00 per CY · qty 186.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $40.00 per CY · qty 176.3 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $30.00 per CY · qty 2510.0 · bid tab
  • 2026-01-06 · TxDOT (Bryan district) · A00211861 · $182.00 per CY · qty 50.0 · bid tab
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $9.50 per CY · qty 5729.0 · bid tab
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $16.00 per CY · qty 6130.0 · bid tab
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $25.50 per CY · qty 3073.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed)
flexible baseSY3$25.50$24.00 to $53.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $53.00 per SY · qty 3774.0 · bid tab
  • 2024-06-06 · TxDOT · 06243216 · $24.00 per SY · qty 30897.0 · bid tab
  • 2024-06-05 · TxDOT · 06243009 · $25.50 per SY · qty 63966.0 · bid tab
inlet headwallEA5$6,720.00$5,000.00 to $50,000.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $25,000.00 per EA · qty 1.0 · bid tab
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $50,000.00 per EA · qty 1.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $5,000.00 per EA · qty 2.0 · bid tab
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $6,720.00 per EA · qty 1.0 · bid tab
  • 2024-06-05 · TxDOT · 06243009 · $5,500.00 per EA · qty 1.0 · bid tab
lime cement stabilizationCY3$200.00$109.00 to $440.00
Bids
  • 2026-01-06 · TxDOT (Bryan district) · A00211861 · $440.00 per CY · qty 17.0 · bid tab
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $109.00 per CY · qty 48.0 · bid tab
  • 2024-06-06 · TxDOT · 06243216 · $200.00 per CY · qty 456.0 · bid tab
lime cement stabilizationSY5$3.75$1.30 to $18.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $4.75 per SY · qty 4553.0 · bid tab
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $18.00 per SY · qty 1053.0 · bid tab
  • 2024-06-06 · TxDOT · 06243216 · $3.75 per SY · qty 30897.0 · bid tab
  • 2024-06-05 · TxDOT · 06243009 · $1.30 per SY · qty 68269.0 · bid tab
  • 2024-06-05 · TxDOT · 06243009 · $3.60 per SY · qty 22754.0 · bid tab
lime cement stabilizationTON3$337.00$200.00 to $410.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $410.00 per TON · qty 12.0 · bid tab
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $200.00 per TON · qty 52.0 · bid tab
  • 2024-06-05 · TxDOT · 06243009 · $337.00 per TON · qty 226.0 · bid tab
sidewalkSY21$132.00$39.00 to $300.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $39.00 per SY · qty 563.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $100.00 per SY · qty 270.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $100.00 per SY · qty 1558.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $300.00 per SY · qty 31.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $300.00 per SY · qty 24.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $300.00 per SY · qty 308.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $300.00 per SY · qty 102.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $75.00 per SY · qty 4727.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $300.00 per SY · qty 176.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $100.00 per SY · qty 1452.0 · bid tab
(10 most recent of 21 shown; all in the Hubstake feed)
storm pipe 15-inchLF1$184.00$184.00 to $184.00
Bids
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $184.00 per LF · qty 8.0 · bid tab
storm pipe 18-inchLF5$100.00$65.00 to $185.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $79.00 per LF · qty 96.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $100.00 per LF · qty 20.0 · bid tab
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $185.00 per LF · qty 22.0 · bid tab
  • 2024-06-06 · TxDOT · 06243216 · $100.00 per LF · qty 86.0 · bid tab
  • 2024-06-05 · TxDOT · 06243009 · $65.00 per LF · qty 1686.0 · bid tab
storm pipe 24-inchLF4$108.00$85.00 to $191.00
Bids
  • 2026-06-02 · TxDOT (Bryan district) · A00206629 · $96.00 per LF · qty 48.0 · bid tab
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $120.00 per LF · qty 73.0 · bid tab
  • 2025-03-04 · TxDOT (Bryan district) · A00180383 · $191.00 per LF · qty 75.0 · bid tab
  • 2024-06-05 · TxDOT · 06243009 · $85.00 per LF · qty 124.0 · bid tab
storm pipe 36-inchLF1$250.00$250.00 to $250.00
Bids
  • 2026-05-06 · TxDOT (Bryan district) · A00206377 · $250.00 per LF · qty 16.0 · bid tab
storm pipe (diameter not stated)LF1$120.00$120.00 to $120.00
Bids
  • 2024-06-06 · TxDOT · 06243216 · $120.00 per LF · qty 32.0 · bid tab