Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON36$173.50$115.90 to $600.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $157.00 per TON · qty 8633.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $166.00 per TON · qty 799.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $156.00 per TON · qty 17514.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $163.00 per TON · qty 688.0 · bid tab
  • 2026-06-02 · TxDOT (Tyler district) · A00220777 · $205.00 per TON · qty 8527.0 · bid tab
  • 2026-02-04 · TxDOT (Tyler district) · A00213638 · $180.50 per TON · qty 12029.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $162.00 per TON · qty 23813.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $147.00 per TON · qty 74751.0 · bid tab
  • 2025-12-03 · TxDOT (Tyler district) · A00196221 · $179.00 per TON · qty 4011.0 · bid tab
  • 2025-12-03 · TxDOT (Tyler district) · A00196221 · $230.00 per TON · qty 39701.0 · bid tab
(10 most recent of 36 shown; all in the Hubstake feed)
concrete pavementSY4$120.50$115.00 to $155.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $115.00 per SY · qty 637.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $125.00 per SY · qty 713.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $116.00 per SY · qty 202906.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $155.00 per SY · qty 30369.0 · bid tab
curb gutterLF9$28.00$21.00 to $120.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $21.00 per LF · qty 20252.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $22.50 per LF · qty 181.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $28.00 per LF · qty 832.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $28.00 per LF · qty 142.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $25.00 per LF · qty 19463.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $35.00 per LF · qty 5586.0 · bid tab
  • 2025-05-01 · TxDOT (Tyler district) · A00184614 · $60.00 per LF · qty 51.0 · bid tab
  • 2025-04-04 · TxDOT (Tyler district) · A00211407 · $85.00 per LF · qty 76.0 · bid tab
  • 2025-04-04 · TxDOT (Tyler district) · A00211407 · $120.00 per LF · qty 10.0 · bid tab
excavation embankmentCY20$15.50$6.00 to $75.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $6.50 per CY · qty 29512.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $25.00 per CY · qty 200.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $8.00 per CY · qty 113103.0 · bid tab
  • 2026-07-21 · TxDOT (Tyler district) · A00220735 · $50.00 per CY · qty 431.0 · bid tab
  • 2026-02-04 · TxDOT (Tyler district) · A00213638 · $75.00 per CY · qty 8.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $11.00 per CY · qty 578838.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $7.00 per CY · qty 579416.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $11.00 per CY · qty 135817.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $45.00 per CY · qty 100.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $25.00 per CY · qty 750.0 · bid tab
(10 most recent of 20 shown; all in the Hubstake feed)
flexible baseSY6$28.50$25.00 to $38.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $28.00 per SY · qty 83630.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $28.00 per SY · qty 1245.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $25.00 per SY · qty 95771.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $38.00 per SY · qty 22057.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $29.00 per SY · qty 77406.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $34.90 per SY · qty 88574.0 · bid tab
inlet headwallEA61$9,200.00$4,960.00 to $43,000.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $21,850.00 per EA · qty 2.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $4,960.00 per EA · qty 47.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $9,500.00 per EA · qty 1.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $17,960.00 per EA · qty 1.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $8,660.00 per EA · qty 1.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $6,450.00 per EA · qty 2.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $7,665.00 per EA · qty 5.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $8,800.00 per EA · qty 1.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $5,430.00 per EA · qty 2.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $7,630.00 per EA · qty 9.0 · bid tab
(10 most recent of 61 shown; all in the Hubstake feed)
lime cement stabilizationCY6$223.00$128.00 to $350.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $215.00 per CY · qty 190.0 · bid tab
  • 2026-07-21 · TxDOT (Tyler district) · A00220735 · $275.00 per CY · qty 5.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $128.00 per CY · qty 15704.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $228.00 per CY · qty 775.2 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $218.00 per CY · qty 651.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $350.00 per CY · qty 426.0 · bid tab
lime cement stabilizationSY12$3.58$2.00 to $8.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $2.00 per SY · qty 44028.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $2.00 per SY · qty 44028.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $4.70 per SY · qty 165932.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $4.80 per SY · qty 94771.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $5.20 per SY · qty 3578.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $4.17 per SY · qty 47305.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $3.00 per SY · qty 22385.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $2.50 per SY · qty 31404.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $2.25 per SY · qty 37395.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $2.25 per SY · qty 37395.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
lime cement stabilizationTON9$275.00$215.00 to $390.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $267.00 per TON · qty 792.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $267.00 per TON · qty 792.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $215.00 per TON · qty 2345.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $365.00 per TON · qty 2304.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $275.00 per TON · qty 1029.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $290.00 per TON · qty 673.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $390.00 per TON · qty 673.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $250.00 per TON · qty 813.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $360.00 per TON · qty 813.0 · bid tab
sidewalkCY1$120.00$120.00 to $120.00
Bids
  • 2025-05-01 · TxDOT (Tyler district) · A00184614 · $120.00 per CY · qty 11.0 · bid tab
sidewalkEA12$2,400.00$1,500.00 to $3,000.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $2,400.00 per EA · qty 1.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $2,400.00 per EA · qty 1.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $2,930.00 per EA · qty 22.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $2,400.00 per EA · qty 1.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $2,300.00 per EA · qty 5.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $3,000.00 per EA · qty 1.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $2,300.00 per EA · qty 4.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $1,500.00 per EA · qty 12.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $1,800.00 per EA · qty 2.0 · bid tab
  • 2025-05-01 · TxDOT (Tyler district) · A00184614 · $3,000.00 per EA · qty 1.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
sidewalkSY19$100.00$49.00 to $3,000.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $69.00 per SY · qty 8698.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $65.00 per SY · qty 2951.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $105.00 per SY · qty 1897.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $49.00 per SY · qty 2018.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $113.00 per SY · qty 1616.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $100.00 per SY · qty 2495.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $150.00 per SY · qty 2117.0 · bid tab
  • 2025-11-06 · TxDOT (Tyler district) · A00060555 · $160.00 per SY · qty 200.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $55.00 per SY · qty 1825.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $105.00 per SY · qty 1561.0 · bid tab
(10 most recent of 19 shown; all in the Hubstake feed)
storm pipe 18-inchLF4$61.50$52.00 to $80.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $59.00 per LF · qty 177.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $64.00 per LF · qty 1834.0 · bid tab
  • 2025-11-06 · TxDOT (Tyler district) · A00060555 · $80.00 per LF · qty 20.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $52.00 per LF · qty 1150.0 · bid tab
storm pipe 24-inchLF8$81.00$66.00 to $140.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $87.00 per LF · qty 158.0 · bid tab
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $68.00 per LF · qty 7030.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $140.00 per LF · qty 9348.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $94.00 per LF · qty 876.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $75.00 per LF · qty 180.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $90.00 per LF · qty 108.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $75.00 per LF · qty 6894.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $66.00 per LF · qty 2520.0 · bid tab
storm pipe 30-inchLF6$137.50$90.00 to $1,400.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $92.00 per LF · qty 674.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $610.00 per LF · qty 3640.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $175.00 per LF · qty 2018.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $1,400.00 per LF · qty 58.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $100.00 per LF · qty 802.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $90.00 per LF · qty 286.0 · bid tab
storm pipe 36-inchLF5$150.00$133.00 to $200.00
Bids
  • 2026-08-06 · TxDOT (Tyler district) · A00049653 · $133.00 per LF · qty 170.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $200.00 per LF · qty 725.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $150.00 per LF · qty 406.0 · bid tab
  • 2025-08-07 · TxDOT (Tyler district) · A00049652 · $180.00 per LF · qty 272.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $135.00 per LF · qty 600.0 · bid tab
storm pipe 42-inchLF3$245.00$170.00 to $2,111.00
Bids
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $245.00 per LF · qty 1269.0 · bid tab
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $170.00 per LF · qty 238.0 · bid tab
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $2,111.00 per LF · qty 88.0 · bid tab
storm pipe 48-inchLF2$230.00$185.00 to $275.00
Bids
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $185.00 per LF · qty 40.0 · bid tab
  • 2026-01-07 · TxDOT (Tyler district) · A00059128 · $275.00 per LF · qty 484.0 · bid tab
storm pipe 60-inchLF1$360.00$360.00 to $360.00
Bids
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $360.00 per LF · qty 396.0 · bid tab
storm pipe 66-inchLF1$650.00$650.00 to $650.00
Bids
  • 2025-09-05 · TxDOT (Tyler district) · A00063821 · $650.00 per LF · qty 56.0 · bid tab
storm pipe 72-inchLF1$505.00$505.00 to $505.00
Bids
  • 2025-07-02 · TxDOT (Tyler district) · A00058519 · $505.00 per LF · qty 318.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.