Site-work prices, Frio County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON10$105.08$91.96 to $130.12
Bids
  • 2026-08-05 · TxDOT (San Antonio district) · A00197422 · $104.56 per TON · qty 28281.0 · bid tab
  • 2026-08-05 · TxDOT (San Antonio district) · A00197422 · $129.35 per TON · qty 4017.0 · bid tab
  • 2026-08-05 · TxDOT (San Antonio district) · A00197422 · $130.12 per TON · qty 17580.0 · bid tab
  • 2026-01-07 · TxDOT (San Antonio district) · A00218601 · $108.52 per TON · qty 7130.0 · bid tab
  • 2025-09-05 · TxDOT (San Antonio district) · A00197415 · $111.22 per TON · qty 6702.0 · bid tab
  • 2025-09-05 · TxDOT (San Antonio district) · A00197415 · $91.96 per TON · qty 6702.0 · bid tab
  • 2025-09-05 · TxDOT (San Antonio district) · A00197415 · $91.96 per TON · qty 2221.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $104.50 per TON · qty 21769.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $94.60 per TON · qty 3282.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $105.60 per TON · qty 16512.0 · bid tab
curb gutterLF1$79.00$79.00 to $79.00
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $79.00 per LF · qty 30.0 · bid tab
excavation embankmentCY5$17.60$13.50 to $250.00
Bids
  • 2026-08-05 · TxDOT (San Antonio district) · A00197422 · $250.00 per CY · qty 5.0 · bid tab
  • 2025-02-07 · TxDOT (San Antonio district) · A00184342 · $13.50 per CY · qty 1121.0 · bid tab
  • 2025-02-07 · TxDOT (San Antonio district) · A00184342 · $15.00 per CY · qty 1875.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $17.60 per CY · qty 8364.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $17.60 per CY · qty 14902.0 · bid tab
flexible baseCY1$62.36$62.36 to $62.36
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $62.36 per CY · qty 1032.0 · bid tab
flexible baseTON1$37.00$37.00 to $37.00
Bids
  • 2025-02-07 · TxDOT (San Antonio district) · A00184342 · $37.00 per TON · qty 3055.0 · bid tab
inlet headwallEA2$11,892.19$11,830.10 to $11,954.28
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $11,954.28 per EA · qty 2.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $11,830.10 per EA · qty 2.0 · bid tab
lime cement stabilizationCY1$295.30$295.30 to $295.30
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $295.30 per CY · qty 283.2 · bid tab
lime cement stabilizationSY3$2.20$1.90 to $2.20
Bids
  • 2025-02-07 · TxDOT (San Antonio district) · A00184342 · $1.90 per SY · qty 13459.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $2.20 per SY · qty 147021.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $2.20 per SY · qty 43414.0 · bid tab
lime cement stabilizationTON2$235.00$220.00 to $250.00
Bids
  • 2025-02-07 · TxDOT (San Antonio district) · A00184342 · $250.00 per TON · qty 116.25 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $220.00 per TON · qty 2019.0 · bid tab
sidewalkSY5$44.00$30.00 to $141.97
Bids
  • 2026-08-05 · TxDOT (San Antonio district) · A00197422 · $32.34 per SY · qty 2055.0 · bid tab
  • 2025-09-05 · TxDOT (San Antonio district) · A00197415 · $135.00 per SY · qty 192.0 · bid tab
  • 2025-02-07 · TxDOT (San Antonio district) · A00184342 · $30.00 per SY · qty 640.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $141.97 per SY · qty 271.0 · bid tab
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $44.00 per SY · qty 3836.0 · bid tab
storm pipe 18-inchLF1$97.28$97.28 to $97.28
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $97.28 per LF · qty 386.0 · bid tab
storm pipe 24-inchLF1$134.41$134.41 to $134.41
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $134.41 per LF · qty 656.0 · bid tab
storm pipe 30-inchLF1$187.26$187.26 to $187.26
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $187.26 per LF · qty 88.0 · bid tab
storm pipe (diameter not stated)LF1$104.20$104.20 to $104.20
Bids
  • 2025-02-06 · TxDOT (San Antonio district) · A00033961 · $104.20 per LF · qty 100.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.