Site-work prices, Freestone County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON6$105.00$79.00 to $198.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $100.00 per TON · qty 1197.0 · bid tab
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $110.00 per TON · qty 1805.0 · bid tab
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $110.00 per TON · qty 2596.0 · bid tab
  • 2026-01-07 · TxDOT (Bryan district) · A00211858 · $198.00 per TON · qty 1022.0 · bid tab
  • 2025-06-11 · TxDOT (Bryan district) · A00215286 · $79.00 per TON · qty 5000.0 · bid tab
  • 2025-06-11 · TxDOT (Bryan district) · A00215286 · $94.00 per TON · qty 500.0 · bid tab
curb gutterLF1$65.00$65.00 to $65.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $65.00 per LF · qty 380.0 · bid tab
excavation embankmentCY8$40.50$20.00 to $400.00
Bids
  • 2026-08-11 · TxDOT (Bryan district) · A00221216 · $40.00 per CY · qty 20.0 · bid tab
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $33.00 per CY · qty 2384.0 · bid tab
  • 2026-01-07 · TxDOT (Bryan district) · A00211858 · $60.50 per CY · qty 83.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $20.00 per CY · qty 3214.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $30.00 per CY · qty 1062.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00214129 · $41.00 per CY · qty 522.0 · bid tab
  • 2025-07-08 · TxDOT (Bryan district) · A00213950 · $400.00 per CY · qty 2.6 · bid tab
  • 2025-06-12 · TxDOT (Bryan district) · A00214130 · $80.00 per CY · qty 36.5 · bid tab
flexible baseCY1$42.00$42.00 to $42.00
Bids
  • 2025-07-09 · TxDOT (Bryan district) · A00214129 · $42.00 per CY · qty 210.0 · bid tab
flexible baseSY3$30.00$16.00 to $34.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $16.00 per SY · qty 5932.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $34.00 per SY · qty 2538.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $30.00 per SY · qty 2887.0 · bid tab
inlet headwallEA3$12,000.00$12,000.00 to $15,000.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $15,000.00 per EA · qty 2.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00214129 · $12,000.00 per EA · qty 2.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00214129 · $12,000.00 per EA · qty 0.5 · bid tab
lime cement stabilizationCY4$301.25$285.00 to $325.00
Bids
  • 2026-01-07 · TxDOT (Bryan district) · A00211858 · $302.50 per CY · qty 56.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $285.00 per CY · qty 203.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00214129 · $325.00 per CY · qty 89.0 · bid tab
  • 2025-07-08 · TxDOT (Bryan district) · A00213950 · $300.00 per CY · qty 9.6 · bid tab
lime cement stabilizationSY6$8.00$5.00 to $12.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $5.00 per SY · qty 6633.0 · bid tab
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $5.00 per SY · qty 5932.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $12.00 per SY · qty 1373.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $8.00 per SY · qty 1562.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $8.00 per SY · qty 1373.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $12.00 per SY · qty 1562.0 · bid tab
lime cement stabilizationTON3$400.00$250.00 to $400.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $250.00 per TON · qty 130.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $400.00 per TON · qty 32.5 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $400.00 per TON · qty 32.5 · bid tab
sidewalkSY3$70.00$35.00 to $150.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $35.00 per SY · qty 1022.0 · bid tab
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $150.00 per SY · qty 38.0 · bid tab
  • 2025-10-08 · TxDOT (Bryan district) · A00186870 · $70.00 per SY · qty 111.0 · bid tab
storm pipe 18-inchLF1$100.00$100.00 to $100.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $100.00 per LF · qty 362.0 · bid tab
storm pipe 24-inchLF2$175.00$150.00 to $200.00
Bids
  • 2026-02-05 · TxDOT (Bryan district) · A00192964 · $150.00 per LF · qty 30.0 · bid tab
  • 2025-07-09 · TxDOT (Bryan district) · A00214129 · $200.00 per LF · qty 8.0 · bid tab
storm pipe 4-inchLF1$575.00$575.00 to $575.00
Bids
  • 2026-01-07 · TxDOT (Bryan district) · A00211858 · $575.00 per LF · qty 19.0 · bid tab
storm pipe (diameter not stated)LF1$88.00$88.00 to $88.00
Bids
  • 2025-07-09 · TxDOT (Bryan district) · A00214129 · $88.00 per LF · qty 62.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.