Site-work prices, Fisher County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$122.00$122.00 to $122.00
Bids
  • 2025-10-08 · TxDOT (Abilene district) · A00195453 · $122.00 per TON · qty 15839.0 · bid tab
excavation embankmentCY6$27.50$16.00 to $55.00
Bids
  • 2026-04-08 · TxDOT (Abilene district) · A00194074 · $27.50 per CY · qty 276.0 · bid tab
  • 2026-04-08 · TxDOT (Abilene district) · A00194074 · $27.50 per CY · qty 400.0 · bid tab
  • 2026-04-07 · TxDOT (Abilene district) · A00061686 · $16.00 per CY · qty 956.0 · bid tab
  • 2026-04-07 · TxDOT (Abilene district) · A00061686 · $30.00 per CY · qty 2656.0 · bid tab
  • 2025-11-06 · TxDOT (Abilene district) · A00036755 · $55.00 per CY · qty 20.0 · bid tab
  • 2025-11-06 · TxDOT (Abilene district) · A00036755 · $23.00 per CY · qty 1167.0 · bid tab
flexible baseSY3$27.50$20.00 to $36.00
Bids
  • 2026-04-08 · TxDOT (Abilene district) · A00194074 · $27.50 per SY · qty 2892.0 · bid tab
  • 2026-04-07 · TxDOT (Abilene district) · A00061686 · $20.00 per SY · qty 5757.0 · bid tab
  • 2025-11-06 · TxDOT (Abilene district) · A00036755 · $36.00 per SY · qty 1488.0 · bid tab
lime cement stabilizationCY3$265.00$220.00 to $342.00
Bids
  • 2026-04-08 · TxDOT (Abilene district) · A00194074 · $220.00 per CY · qty 187.0 · bid tab
  • 2026-04-07 · TxDOT (Abilene district) · A00061686 · $265.00 per CY · qty 394.0 · bid tab
  • 2025-11-06 · TxDOT (Abilene district) · A00036755 · $342.00 per CY · qty 77.0 · bid tab
storm pipe (diameter not stated)LF1$95.00$95.00 to $95.00
Bids
  • 2025-10-08 · TxDOT (Abilene district) · A00195453 · $95.00 per LF · qty 175.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.