PadstakeGet the fee reports
Menu

Site-work prices, Cherokee County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON21$107.90$92.90 to $275.00
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $150.00 per TON · qty 234.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $275.00 per TON · qty 304.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $150.00 per TON · qty 432.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $275.00 per TON · qty 4.0 · bid tab
  • 2025-03-04 · TxDOT (Tyler district) · A00213855 · $123.00 per TON · qty 50.0 · bid tab
  • 2025-03-04 · TxDOT (Tyler district) · A00213855 · $113.00 per TON · qty 50.0 · bid tab
  • 2025-03-04 · TxDOT (Tyler district) · A00213855 · $107.90 per TON · qty 200.0 · bid tab
  • 2025-03-04 · TxDOT (Tyler district) · A00213855 · $107.90 per TON · qty 200.0 · bid tab
  • 2025-03-04 · TxDOT (Tyler district) · A00213855 · $102.90 per TON · qty 10000.0 · bid tab
  • 2025-03-04 · TxDOT (Tyler district) · A00213855 · $92.90 per TON · qty 6000.0 · bid tab
(10 most recent of 21 shown; all in the Hubstake feed)
excavation embankmentCY7$40.00$15.00 to $45.00
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $40.00 per CY · qty 634.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $25.00 per CY · qty 10.0 · bid tab
  • 2025-10-21 · TxDOT (Tyler district) · A00216543 · $45.00 per CY · qty 24.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $38.33 per CY · qty 11869.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $15.00 per CY · qty 200.0 · bid tab
  • 2025-02-07 · TxDOT (Tyler district) · A00064408 · $42.00 per CY · qty 814.0 · bid tab
  • 2025-02-07 · TxDOT (Tyler district) · A00064408 · $42.00 per CY · qty 244.0 · bid tab
flexible baseCY17$49.50$38.50 to $49.50
Bids
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 500.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 400.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 2000.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 500.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 100.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 700.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 500.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 500.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $49.50 per CY · qty 1000.0 · bid tab
  • 2025-01-21 · TxDOT (Tyler district) · A00212866 · $38.50 per CY · qty 1400.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
inlet headwallEA5$25,000.00$10,400.00 to $47,348.00
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $12,000.00 per EA · qty 1.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $10,400.00 per EA · qty 1.0 · bid tab
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $25,000.00 per EA · qty 1.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $37,276.17 per EA · qty 12.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $47,348.00 per EA · qty 2.0 · bid tab
sidewalkSY4$70.50$50.00 to $140.97
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $50.00 per SY · qty 472.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $140.97 per SY · qty 127.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $55.00 per SY · qty 2623.0 · bid tab
  • 2025-02-07 · TxDOT (Tyler district) · A00064408 · $86.00 per SY · qty 416.0 · bid tab
storm pipe 18-inchLF3$65.00$63.56 to $68.00
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $68.00 per LF · qty 74.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $63.56 per LF · qty 1921.0 · bid tab
  • 2025-02-07 · TxDOT (Tyler district) · A00064408 · $65.00 per LF · qty 130.0 · bid tab
storm pipe 24-inchLF3$86.00$83.68 to $210.00
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $86.00 per LF · qty 30.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $83.68 per LF · qty 372.0 · bid tab
  • 2025-02-07 · TxDOT (Tyler district) · A00064408 · $210.00 per LF · qty 36.0 · bid tab
storm pipe 30-inchLF2$158.47$106.94 to $210.00
Bids
  • 2026-07-01 · TxDOT (Tyler district) · A00206448 · $210.00 per LF · qty 4.0 · bid tab
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $106.94 per LF · qty 8.0 · bid tab
storm pipe 36-inchLF1$139.19$139.19 to $139.19
Bids
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $139.19 per LF · qty 12.0 · bid tab
storm pipe 48-inchLF1$214.08$214.08 to $214.08
Bids
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $214.08 per LF · qty 24.0 · bid tab
storm pipe (diameter not stated)LF1$112.00$112.00 to $112.00
Bids
  • 2025-08-08 · TxDOT (Tyler district) · A00196862 · $112.00 per LF · qty 63.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.