PadstakeGet the fee reports
Menu

Site-work prices, Burleson County, TX

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON14$95.88$81.00 to $395.00
Bids
  • 2026-11-03 · TxDOT (Bryan district) · A00204003 · $395.00 per TON · qty 115.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $110.00 per TON · qty 8890.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $90.00 per TON · qty 13346.0 · bid tab
  • 2026-06-09 · TxDOT (Bryan district) · A00221778 · $83.00 per TON · qty 200.0 · bid tab
  • 2026-06-09 · TxDOT (Bryan district) · A00221778 · $98.00 per TON · qty 2000.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $180.00 per TON · qty 29.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $180.00 per TON · qty 322.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $190.00 per TON · qty 380.0 · bid tab
  • 2025-07-08 · TxDOT (Bryan district) · A00216200 · $81.00 per TON · qty 200.0 · bid tab
  • 2025-07-08 · TxDOT (Bryan district) · A00216200 · $92.00 per TON · qty 3000.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
excavation embankmentCY8$25.00$17.00 to $43.00
Bids
  • 2026-11-03 · TxDOT (Bryan district) · A00204003 · $25.00 per CY · qty 397.0 · bid tab
  • 2026-11-03 · TxDOT (Bryan district) · A00204003 · $25.00 per CY · qty 104.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $17.00 per CY · qty 3317.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $17.00 per CY · qty 4005.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $23.00 per CY · qty 1295.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $43.00 per CY · qty 846.0 · bid tab
  • 2024-06-05 · TxDOT · 06243039 · $33.60 per CY · qty 540.0 · bid tab
  • 2024-06-05 · TxDOT · 06243039 · $31.50 per CY · qty 327.0 · bid tab
flexible baseSY5$36.00$17.00 to $70.00
Bids
  • 2026-11-03 · TxDOT (Bryan district) · A00204003 · $70.00 per SY · qty 1044.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $45.00 per SY · qty 3428.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $17.00 per SY · qty 26812.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $36.00 per SY · qty 3036.0 · bid tab
  • 2024-06-05 · TxDOT · 06243039 · $31.50 per SY · qty 910.0 · bid tab
inlet headwallEA3$96,000.00$10,000.00 to $110,000.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $10,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $96,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $110,000.00 per EA · qty 1.0 · bid tab
lime cement stabilizationCY3$225.00$130.00 to $288.60
Bids
  • 2026-11-03 · TxDOT (Bryan district) · A00204003 · $225.00 per CY · qty 88.2 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $130.00 per CY · qty 211.0 · bid tab
  • 2024-06-05 · TxDOT · 06243039 · $288.60 per CY · qty 62.0 · bid tab
lime cement stabilizationSY5$7.00$2.50 to $80.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $2.50 per SY · qty 28539.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $80.00 per SY · qty 372.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $7.00 per SY · qty 3110.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $14.00 per SY · qty 1583.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $7.00 per SY · qty 1583.0 · bid tab
lime cement stabilizationTON4$305.00$200.00 to $410.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $350.00 per TON · qty 77.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $200.00 per TON · qty 283.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $410.00 per TON · qty 21.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $260.00 per TON · qty 15.0 · bid tab
sidewalkEA1$780.00$780.00 to $780.00
Bids
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $780.00 per EA · qty 1.0 · bid tab
sidewalkSY4$97.50$38.00 to $500.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $38.00 per SY · qty 3257.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $500.00 per SY · qty 3.0 · bid tab
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $150.00 per SY · qty 95.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $45.00 per SY · qty 262.0 · bid tab
storm pipe 18-inchLF2$71.00$62.00 to $80.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $80.00 per LF · qty 766.0 · bid tab
  • 2025-12-02 · TxDOT (Bryan district) · A00124687 · $62.00 per LF · qty 83.0 · bid tab
storm pipe 24-inchLF1$150.00$150.00 to $150.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $150.00 per LF · qty 16.0 · bid tab
storm pipe 36-inchLF1$200.00$200.00 to $200.00
Bids
  • 2026-08-05 · TxDOT (Bryan district) · A00196824 · $200.00 per LF · qty 88.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.