| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 23 | $135.09 | $80.50 to $540.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $116.00 per TON · qty 14424.0 · bid tab
- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $94.50 per TON · qty 33968.0 · bid tab
- 2026-08-06 · TxDOT (Bryan district) · A00222319 · $160.00 per TON · qty 5239.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $140.00 per TON · qty 1751.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $130.00 per TON · qty 1155.0 · bid tab
- 2025-06-12 · TxDOT (Bryan district) · A00215641 · $80.50 per TON · qty 200.0 · bid tab
- 2025-06-12 · TxDOT (Bryan district) · A00215641 · $88.00 per TON · qty 2000.0 · bid tab
- 2025-06-10 · TxDOT (Bryan district) · A00214913 · $146.00 per TON · qty 4538.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $450.00 per TON · qty 7.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $200.00 per TON · qty 1164.0 · bid tab
(10 most recent of 23 shown; all in the Hubstake feed) |
| concrete pavement | SY | 3 | $120.77 | $104.06 to $490.00 | Bids- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $490.00 per SY · qty 15.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $104.06 per SY · qty 7352.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $120.77 per SY · qty 391.0 · bid tab
|
| curb gutter | LF | 17 | $41.00 | $1.89 to $236.48 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $38.00 per LF · qty 107.0 · bid tab
- 2026-03-05 · TxDOT (Bryan district) · A00209977 · $66.00 per LF · qty 159.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $11.00 per LF · qty 57.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $41.00 per LF · qty 1372.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $16.00 per LF · qty 51.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $80.00 per LF · qty 164.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $49.00 per LF · qty 1869.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $15.00 per LF · qty 512.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $1.89 per LF · qty 384.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $167.19 per LF · qty 134.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed) |
| excavation embankment | CY | 15 | $21.00 | $6.50 to $51.50 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $6.50 per CY · qty 33904.0 · bid tab
- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $10.00 per CY · qty 283087.0 · bid tab
- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $50.00 per CY · qty 250.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $15.00 per CY · qty 2424.9 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $15.00 per CY · qty 11856.4 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $24.00 per CY · qty 250.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $26.00 per CY · qty 2986.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $22.00 per CY · qty 892.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $37.00 per CY · qty 3968.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $21.00 per CY · qty 281.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed) |
| flexible base | CY | 3 | $57.50 | $50.00 to $60.00 | Bids- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $60.00 per CY · qty 400.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $50.00 per CY · qty 400.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $57.50 per CY · qty 800.0 · bid tab
|
| flexible base | SY | 5 | $20.50 | $16.36 to $35.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $20.50 per SY · qty 123992.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $23.00 per SY · qty 52999.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $35.00 per SY · qty 5587.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $19.80 per SY · qty 67599.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $16.36 per SY · qty 1362074.0 · bid tab
|
| flexible base | TON | 6 | $40.50 | $35.00 to $43.00 | Bids- 2025-11-12 · TxDOT (Bryan district) · A00217932 · $35.00 per TON · qty 1000.0 · bid tab
- 2025-11-12 · TxDOT (Bryan district) · A00217932 · $35.00 per TON · qty 1000.0 · bid tab
- 2025-11-12 · TxDOT (Bryan district) · A00217932 · $41.00 per TON · qty 1000.0 · bid tab
- 2024-06-10 · TxDOT · 06241704 · $43.00 per TON · qty 1500.0 · bid tab
- 2024-06-10 · TxDOT · 06241704 · $43.00 per TON · qty 1500.0 · bid tab
- 2024-06-10 · TxDOT · 06241704 · $40.00 per TON · qty 1500.0 · bid tab
|
| inlet headwall | EA | 67 | $12,440.91 | $5,339.75 to $981,578.30 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $8,000.00 per EA · qty 1.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $9,600.00 per EA · qty 1.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $8,800.00 per EA · qty 3.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $18,000.00 per EA · qty 6.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $15,000.00 per EA · qty 1.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $8,300.00 per EA · qty 1.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $14,000.00 per EA · qty 3.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $44,000.00 per EA · qty 1.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $46,000.00 per EA · qty 1.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $11,000.00 per EA · qty 1.0 · bid tab
(10 most recent of 67 shown; all in the Hubstake feed) |
| lime cement stabilization | CY | 11 | $150.00 | $100.00 to $300.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $110.00 per CY · qty 1247.0 · bid tab
- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $200.00 per CY · qty 400.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $150.00 per CY · qty 41.0 · bid tab
- 2026-03-05 · TxDOT (Bryan district) · A00209977 · $260.00 per CY · qty 74.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $240.00 per CY · qty 400.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $100.00 per CY · qty 18.0 · bid tab
- 2025-05-02 · TxDOT (Bryan district) · A00188032 · $300.00 per CY · qty 85.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $140.00 per CY · qty 18.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $100.20 per CY · qty 112.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $108.83 per CY · qty 17997.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed) |
| lime cement stabilization | SY | 13 | $4.23 | $2.00 to $20.42 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $2.05 per SY · qty 128047.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $3.00 per SY · qty 15015.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $2.50 per SY · qty 60066.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $2.00 per SY · qty 5765.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $6.50 per SY · qty 5765.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $2.65 per SY · qty 76631.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $6.19 per SY · qty 11312.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $20.42 per SY · qty 8472.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $6.23 per SY · qty 537446.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $4.23 per SY · qty 8472.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| lime cement stabilization | TON | 9 | $260.00 | $170.00 to $750.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $185.00 per TON · qty 2113.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $225.00 per TON · qty 853.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $325.00 per TON · qty 211.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $750.00 per TON · qty 61.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $170.00 per TON · qty 61.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $260.00 per TON · qty 1076.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $180.58 per TON · qty 5714.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $292.50 per TON · qty 56.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $292.50 per TON · qty 5639.0 · bid tab
|
| sidewalk | EA | 18 | $2,100.00 | $1,309.00 to $4,920.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $1,309.00 per EA · qty 1.0 · bid tab
- 2026-03-05 · TxDOT (Bryan district) · A00209977 · $1,900.00 per EA · qty 1.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $2,500.00 per EA · qty 5.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $4,300.00 per EA · qty 1.0 · bid tab
- 2025-07-01 · TxDOT (Bryan district) · A00209975 · $4,920.00 per EA · qty 1.0 · bid tab
- 2025-07-01 · TxDOT (Bryan district) · A00209975 · $4,305.00 per EA · qty 2.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $2,100.00 per EA · qty 2.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $2,100.00 per EA · qty 2.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $2,200.00 per EA · qty 2.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $2,200.00 per EA · qty 11.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed) |
| sidewalk | SY | 32 | $104.17 | $12.00 to $280.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $115.00 per SY · qty 763.0 · bid tab
- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $50.50 per SY · qty 2557.0 · bid tab
- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $30.00 per SY · qty 400.0 · bid tab
- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $120.00 per SY · qty 50.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $45.00 per SY · qty 490.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $150.00 per SY · qty 87.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $25.00 per SY · qty 2279.0 · bid tab
- 2026-03-05 · TxDOT (Bryan district) · A00209977 · $100.00 per SY · qty 444.0 · bid tab
- 2026-03-05 · TxDOT (Bryan district) · A00209977 · $87.00 per SY · qty 103.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $12.00 per SY · qty 400.0 · bid tab
(10 most recent of 32 shown; all in the Hubstake feed) |
| storm pipe 18-inch | LF | 8 | $88.20 | $70.00 to $207.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $80.50 per LF · qty 464.0 · bid tab
- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $80.00 per LF · qty 50.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $85.00 per LF · qty 761.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $207.00 per LF · qty 50.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $99.00 per LF · qty 43.0 · bid tab
- 2025-06-05 · TxDOT (Bryan district) · A00187707 · $70.00 per LF · qty 304.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $98.05 per LF · qty 47593.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $91.40 per LF · qty 100.0 · bid tab
|
| storm pipe 24-inch | LF | 8 | $122.50 | $54.90 to $230.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $99.00 per LF · qty 74.0 · bid tab
- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $120.00 per LF · qty 100.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $125.00 per LF · qty 143.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $230.00 per LF · qty 100.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $129.10 per LF · qty 325.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $54.90 per LF · qty 2610.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $133.61 per LF · qty 38886.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $100.00 per LF · qty 200.0 · bid tab
|
| storm pipe 30-inch | LF | 5 | $173.80 | $60.74 to $267.00 | Bids- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $267.00 per LF · qty 250.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $182.10 per LF · qty 58.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $60.74 per LF · qty 645.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $173.80 per LF · qty 19564.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $138.80 per LF · qty 500.0 · bid tab
|
| storm pipe 36-inch | LF | 9 | $221.29 | $67.37 to $610.00 | Bids- 2026-11-04 · TxDOT (Bryan district) · A00124162 · $178.00 per LF · qty 230.0 · bid tab
- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $200.00 per LF · qty 50.0 · bid tab
- 2026-07-01 · TxDOT (Bryan district) · A00206416 · $225.00 per LF · qty 48.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $401.00 per LF · qty 50.0 · bid tab
- 2025-05-01 · TxDOT (Bryan district) · A00206294 · $610.00 per LF · qty 10.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $262.20 per LF · qty 46.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $221.29 per LF · qty 12606.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $67.37 per LF · qty 1087.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $206.18 per LF · qty 100.0 · bid tab
|
| storm pipe 42-inch | LF | 5 | $273.40 | $189.84 to $487.00 | Bids- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $487.00 per LF · qty 100.0 · bid tab
- 2025-08-07 · TxDOT (Bryan district) · A00192967 · $190.00 per LF · qty 494.0 · bid tab
- 2025-04-04 · TxDOT (Bryan district) · A00187296 · $273.40 per LF · qty 46.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $307.36 per LF · qty 4303.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $189.84 per LF · qty 200.0 · bid tab
|
| storm pipe 48-inch | LF | 4 | $315.47 | $250.00 to $600.00 | Bids- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $250.00 per LF · qty 40.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $600.00 per LF · qty 40.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $360.93 per LF · qty 3843.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $270.00 per LF · qty 80.0 · bid tab
|
| storm pipe 60-inch | LF | 4 | $484.92 | $300.00 to $1,140.00 | Bids- 2026-08-12 · TxDOT (Bryan district) · A00222813 · $300.00 per LF · qty 40.0 · bid tab
- 2026-02-10 · TxDOT (Bryan district) · A00219214 · $1,140.00 per LF · qty 40.0 · bid tab
- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $491.94 per LF · qty 1231.0 · bid tab
- 2025-01-15 · TxDOT (Bryan district) · A00205547 · $477.90 per LF · qty 80.0 · bid tab
|
| storm pipe 72-inch | LF | 1 | $661.40 | $661.40 to $661.40 | Bids- 2025-03-05 · TxDOT (Bryan district) · A00123795 · $661.40 per LF · qty 1335.0 · bid tab
|