Site-work prices, Greene County, TN

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON12$174.00$29.90 to $1,536.00
Bids
  • 2026-06-26 · TDOT · CN261054 · $175.00 per TON · qty 9869.0 · bid tab
  • 2026-06-26 · TDOT · CN261054 · $184.00 per TON · qty 2468.0 · bid tab
  • 2026-02-06 · TDOT · CN261003 · $1,513.48 per TON · qty 135.0 · bid tab
  • 2025-06-27 · TDOT · CNZ171 · $49.00 per TON · qty 4145.0 · bid tab
  • 2025-06-27 · TDOT · CNZ171 · $171.00 per TON · qty 4185.0 · bid tab
  • 2025-06-27 · TDOT · CNZ172 · $192.00 per TON · qty 606.0 · bid tab
  • 2025-06-27 · TDOT · CNZ172 · $173.00 per TON · qty 3031.0 · bid tab
  • 2025-06-27 · TDOT · CNZ191 · $548.35 per TON · qty 65.0 · bid tab
  • 2024-05-10 · TDOT · CNY114 · $1,536.00 per TON · qty 139.0 · bid tab
  • 2023-12-08 · TDOT · CNX391 · $156.00 per TON · qty 15808.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
lime cement stabilizationS.Y.1$13.71$13.71 to $13.71
Bids
  • 2025-06-27 · TDOT · CNZ191 · $13.71 per S.Y. · qty 535.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.