Site-work prices, Cocke County, TN

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON14$212.50$110.00 to $350.00
Bids
  • 2025-10-03 · TDOT · CNZ252 · $300.00 per TON · qty 192.0 · bid tab
  • 2025-10-03 · TDOT · CNZ252 · $350.00 per TON · qty 41.0 · bid tab
  • 2025-10-03 · TDOT · CNZ252 · $245.00 per TON · qty 258.0 · bid tab
  • 2025-10-03 · TDOT · CNZ252 · $200.00 per TON · qty 394.0 · bid tab
  • 2024-12-06 · TDOT · CNY315 · $200.00 per TON · qty 248.0 · bid tab
  • 2024-12-06 · TDOT · CNY315 · $200.00 per TON · qty 232.0 · bid tab
  • 2024-12-06 · TDOT · CNY315 · $200.00 per TON · qty 331.0 · bid tab
  • 2024-12-06 · TDOT · CNY315 · $200.00 per TON · qty 115.0 · bid tab
  • 2024-12-06 · TDOT · CNY315 · $300.00 per TON · qty 67.0 · bid tab
  • 2024-12-06 · TDOT · CNY315 · $200.00 per TON · qty 493.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
lime cement stabilizationL.F.1$37.36$37.36 to $37.36
Bids
  • 2024-12-06 · TDOT · CNY315 · $37.36 per L.F. · qty 140875.0 · bid tab
lime cement stabilizationS.Y.3$8.37$3.00 to $8.49
Bids
  • 2026-10-02 · TDOT · CN261069 · $8.37 per S.Y. · qty 2512.0 · bid tab
  • 2025-10-03 · TDOT · CNZ252 · $3.00 per S.Y. · qty 617.0 · bid tab
  • 2024-12-06 · TDOT · CNY315 · $8.49 per S.Y. · qty 12750.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.