Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 27 | $113.00 | $16.00 to $480.00 | Bids- 2025-12-05 · TDOT · CNZ331 · $140.00 per TON · qty 154.0 · bid tab
- 2025-12-05 · TDOT · CNZ331 · $19.00 per TON · qty 4699.0 · bid tab
- 2025-12-05 · TDOT · CNZ331 · $109.00 per TON · qty 2124.0 · bid tab
- 2025-12-05 · TDOT · CNZ331 · $138.50 per TON · qty 2726.0 · bid tab
- 2025-12-05 · TDOT · CNZ331 · $175.00 per TON · qty 108.0 · bid tab
- 2025-08-15 · TDOT · CNZ215 · $480.00 per TON · qty 23.0 · bid tab
- 2025-08-15 · TDOT · CNZ215 · $455.00 per TON · qty 27.0 · bid tab
- 2025-06-27 · TDOT · CNZ194 · $128.00 per TON · qty 1697.0 · bid tab
- 2025-06-27 · TDOT · CNZ194 · $106.00 per TON · qty 40389.0 · bid tab
- 2025-06-27 · TDOT · CNZ194 · $148.00 per TON · qty 14279.0 · bid tab
(10 most recent of 27 shown; all in the Hubstake feed) |
| curb gutter | C.Y. | 2 | $442.00 | $400.00 to $484.00 | Bids- 2025-06-27 · TDOT · CNZ194 · $484.00 per C.Y. · qty 1443.0 · bid tab
- 2024-03-22 · TDOT · CNY084 · $400.00 per C.Y. · qty 5.0 · bid tab
|
| fire hydrant | EACH | 1 | $17,000.00 | $17,000.00 to $17,000.00 | Bids- 2025-06-27 · TDOT · CNZ194 · $17,000.00 per EACH · qty 13.0 · bid tab
|
| lime cement stabilization | S.Y. | 1 | $2.60 | $2.60 to $2.60 | Bids- 2025-06-27 · TDOT · CNZ194 · $2.60 per S.Y. · qty 304695.0 · bid tab
|
| manhole | EACH | 1 | $12,000.00 | $12,000.00 to $12,000.00 | Bids- 2025-06-27 · TDOT · CNZ194 · $12,000.00 per EACH · qty 3.0 · bid tab
|
| sidewalk | EACH | 1 | $5,400.00 | $5,400.00 to $5,400.00 | Bids- 2025-06-27 · TDOT · CNZ194 · $5,400.00 per EACH · qty 2.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.