| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | Ton | 7 | $175.00 | $1.00 to $1,200.00 | Bids- 2025-11-19 · SDDOT · 09M6 · $175.00 per Ton · qty 864.5 · bid tab
- 2025-03-05 · SDDOT · 07DH · $1,200.00 per Ton · qty 0.2 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $64.05 per Ton · qty 18536.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $200.00 per Ton · qty 370.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $675.00 per Ton · qty 649.8 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $17.00 per Ton · qty 2716.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $1.00 per Ton · qty 3861.4 · bid tab
|
| concrete pavement | Each | 2 | $45.17 | $18.50 to $71.84 | Bids- 2025-03-05 · SDDOT · 07DH · $18.50 per Each · qty 1143.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $71.84 per Each · qty 34.0 · bid tab
|
| concrete pavement | SqYd | 2 | $78.22 | $43.45 to $112.99 | Bids- 2025-03-05 · SDDOT · 07DH · $112.99 per SqYd · qty 547.4 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $43.45 per SqYd · qty 112186.2 · bid tab
|
| curb gutter | Ft | 3 | $52.96 | $52.54 to $71.81 | Bids- 2025-03-05 · SDDOT · 07DH · $52.96 per Ft · qty 1074.0 · bid tab
- 2025-03-05 · SDDOT · 07DH · $52.54 per Ft · qty 499.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $71.81 per Ft · qty 450.0 · bid tab
|
| excavation embankment | CuYd | 8 | $14.10 | $6.00 to $55.00 | Bids- 2026-04-15 · SDDOT · 0A9N · $7.15 per CuYd · qty 23820.0 · bid tab
- 2026-04-15 · SDDOT · 0A9N · $13.20 per CuYd · qty 12803.0 · bid tab
- 2025-11-19 · SDDOT · 09M6 · $12.00 per CuYd · qty 12383.0 · bid tab
- 2025-11-19 · SDDOT · 09M6 · $6.00 per CuYd · qty 5335.0 · bid tab
- 2025-11-19 · SDDOT · 09M6 · $52.00 per CuYd · qty 1322.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $55.00 per CuYd · qty 1029.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $50.00 per CuYd · qty 181.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $15.00 per CuYd · qty 133.0 · bid tab
|
| flexible base | Ton | 3 | $24.50 | $13.50 to $31.50 | Bids- 2025-11-19 · SDDOT · 09M6 · $31.50 per Ton · qty 2015.5 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $24.50 per Ton · qty 5354.5 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $13.50 per Ton · qty 14140.3 · bid tab
|
| inlet headwall | Each | 5 | $1,250.00 | $95.00 to $4,350.00 | Bids- 2026-04-15 · SDDOT · 0A9N · $2,750.00 per Each · qty 1.0 · bid tab
- 2025-11-19 · SDDOT · 09M6 · $300.00 per Each · qty 4.0 · bid tab
- 2025-03-05 · SDDOT · 07DH · $4,350.00 per Each · qty 4.0 · bid tab
- 2025-03-05 · SDDOT · 07DH · $95.00 per Each · qty 1.0 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $1,250.00 per Each · qty 2.0 · bid tab
|
| inlet headwall | Ft | 1 | $6.00 | $6.00 to $6.00 | Bids- 2025-03-05 · SDDOT · 07DH · $6.00 per Ft · qty 52.0 · bid tab
|
| lime cement stabilization | Acre | 2 | $207.50 | $165.00 to $250.00 | Bids- 2026-04-15 · SDDOT · 0A9N · $165.00 per Acre · qty 4.7 · bid tab
- 2025-01-22 · SDDOT · 07V2 · $250.00 per Acre · qty 0.5 · bid tab
|
| manhole | Each | 4 | $1,570.50 | $1,077.00 to $2,320.00 | Bids- 2025-03-05 · SDDOT · 07DH · $1,606.00 per Each · qty 14.0 · bid tab
- 2025-03-05 · SDDOT · 07DH · $1,077.00 per Each · qty 15.0 · bid tab
- 2024-05-15 · SDDOT · 09AU · $1,535.00 per Each · qty 3.0 · bid tab
- 2024-05-15 · SDDOT · 09AU · $2,320.00 per Each · qty 1.0 · bid tab
|
| storm pipe 18-inch | Ft | 2 | $125.00 | $50.00 to $200.00 | Bids- 2025-03-05 · SDDOT · 07DH · $200.00 per Ft · qty 4.0 · bid tab
- 2025-03-05 · SDDOT · 07DH · $50.00 per Ft · qty 4.0 · bid tab
|
| storm pipe 24-inch | Ft | 2 | $107.50 | $65.00 to $150.00 | Bids- 2025-03-05 · SDDOT · 07DH · $65.00 per Ft · qty 36.0 · bid tab
- 2025-03-05 · SDDOT · 07DH · $150.00 per Ft · qty 36.0 · bid tab
|
| storm pipe 36-inch | Ft | 2 | $82.50 | $55.00 to $110.00 | Bids- 2026-04-15 · SDDOT · 0A9N · $55.00 per Ft · qty 162.0 · bid tab
- 2026-04-15 · SDDOT · 0A9N · $110.00 per Ft · qty 162.0 · bid tab
|
| storm pipe 4-inch | Ft | 1 | $49.50 | $49.50 to $49.50 | Bids- 2026-04-15 · SDDOT · 0A9N · $49.50 per Ft · qty 30.0 · bid tab
|