Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon9$165.00$9.00 to $1,800.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $49.00 per Ton · qty 13926.2 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $200.00 per Ton · qty 124.2 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $9.00 per Ton · qty 4810.1 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $48.00 per Ton · qty 24590.9 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $60.00 per Ton · qty 745.2 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $725.00 per Ton · qty 1469.9 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $1,800.00 per Ton · qty 1.0 · bid tab
  • 2024-08-21 · SDDOT · 08PN · $450.00 per Ton · qty 25.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $165.00 per Ton · qty 5098.2 · bid tab
concrete pavementEach3$12.00$10.00 to $20.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $20.00 per Each · qty 162.0 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $10.00 per Each · qty 29.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $12.00 per Each · qty 360.0 · bid tab
concrete pavementMile1$21,500.00$21,500.00 to $21,500.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $21,500.00 per Mile · qty 15.7 · bid tab
concrete pavementSqFt1$25.50$25.50 to $25.50
Bids
  • 2025-10-01 · SDDOT · 05J5 · $25.50 per SqFt · qty 392.0 · bid tab
concrete pavementSqYd1$36.90$36.90 to $36.90
Bids
  • 2025-10-01 · SDDOT · 05J5 · $36.90 per SqYd · qty 272464.8 · bid tab
curb gutterFt2$105.00$60.00 to $150.00
Bids
  • 2025-05-21 · SDDOT · 08W5 · $60.00 per Ft · qty 124.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $150.00 per Ft · qty 58.0 · bid tab
excavation embankmentCuYd11$11.25$5.00 to $44.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $15.00 per CuYd · qty 1032.0 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $7.50 per CuYd · qty 9838.0 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $11.25 per CuYd · qty 11960.0 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $18.00 per CuYd · qty 3291.0 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $5.50 per CuYd · qty 2368.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $12.00 per CuYd · qty 2834.0 · bid tab
  • 2024-10-16 · SDDOT · 08ND · $5.00 per CuYd · qty 3536.0 · bid tab
  • 2024-10-16 · SDDOT · 08ND · $8.00 per CuYd · qty 1653.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $44.00 per CuYd · qty 1510.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $14.00 per CuYd · qty 43155.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
flexible baseTon4$25.38$9.75 to $50.00
Bids
  • 2025-10-15 · SDDOT · 0A45 · $50.00 per Ton · qty 11.2 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $9.75 per Ton · qty 24238.2 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $18.75 per Ton · qty 16049.5 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $32.00 per Ton · qty 12351.2 · bid tab
inlet headwallEach4$325.00$100.00 to $850.00
Bids
  • 2025-05-21 · SDDOT · 08W4 · $100.00 per Each · qty 8.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $275.00 per Each · qty 3.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $850.00 per Each · qty 4.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $375.00 per Each · qty 4.0 · bid tab
inlet headwallFt2$9.25$6.50 to $12.00
Bids
  • 2025-05-21 · SDDOT · 08W4 · $12.00 per Ft · qty 24.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $6.50 per Ft · qty 192.0 · bid tab
lime cement stabilizationAcre1$100.00$100.00 to $100.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $100.00 per Acre · qty 13.0 · bid tab
lime cement stabilizationTon1$350.00$350.00 to $350.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $350.00 per Ton · qty 146.1 · bid tab
manholeEach3$2,000.00$1,500.00 to $4,500.00
Bids
  • 2025-05-21 · SDDOT · 08W4 · $4,500.00 per Each · qty 6.0 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $2,000.00 per Each · qty 4.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $1,500.00 per Each · qty 5.0 · bid tab
storm pipe 15-inchFt4$54.50$51.00 to $120.00
Bids
  • 2024-01-17 · SDDOT · 05TJ · $51.00 per Ft · qty 176.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $120.00 per Ft · qty 280.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $51.00 per Ft · qty 176.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $58.00 per Ft · qty 280.0 · bid tab
storm pipe 18-inchFt13$48.00$25.00 to $85.00
Bids
  • 2025-05-21 · SDDOT · 08W4 · $25.00 per Ft · qty 30.0 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $85.00 per Ft · qty 62.0 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $45.00 per Ft · qty 30.0 · bid tab
  • 2025-05-21 · SDDOT · 08W4 · $35.00 per Ft · qty 62.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $60.00 per Ft · qty 4.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $68.00 per Ft · qty 4.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $79.00 per Ft · qty 8.0 · bid tab
  • 2025-05-21 · SDDOT · 08W5 · $75.00 per Ft · qty 8.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $53.00 per Ft · qty 176.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $41.00 per Ft · qty 354.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
storm pipe 24-inchFt6$65.50$29.00 to $80.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $75.00 per Ft · qty 20.0 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $80.00 per Ft · qty 20.0 · bid tab
  • 2024-10-16 · SDDOT · 08ND · $29.00 per Ft · qty 76.0 · bid tab
  • 2024-10-16 · SDDOT · 08ND · $65.00 per Ft · qty 76.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $66.00 per Ft · qty 52.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $62.00 per Ft · qty 52.0 · bid tab
storm pipe 30-inchFt4$98.00$95.00 to $145.00
Bids
  • 2025-10-01 · SDDOT · 05J5 · $100.00 per Ft · qty 36.0 · bid tab
  • 2025-10-01 · SDDOT · 05J5 · $145.00 per Ft · qty 36.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $95.00 per Ft · qty 336.0 · bid tab
  • 2024-01-17 · SDDOT · 05TJ · $96.00 per Ft · qty 336.0 · bid tab
storm pipe (diameter not stated)Ft4$925.00$550.00 to $1,750.00
Bids
  • 2024-10-16 · SDDOT · 08ND · $550.00 per Ft · qty 76.0 · bid tab
  • 2024-10-16 · SDDOT · 08ND · $750.00 per Ft · qty 76.0 · bid tab
  • 2024-10-16 · SDDOT · 08ND · $1,750.00 per Ft · qty 76.0 · bid tab
  • 2024-10-16 · SDDOT · 08ND · $1,100.00 per Ft · qty 76.0 · bid tab
water main 6-inchFt1$80.00$80.00 to $80.00
Bids
  • 2025-05-21 · SDDOT · 08W5 · $80.00 per Ft · qty 18.0 · bid tab
water main (diameter not stated)Ft1$30.00$30.00 to $30.00
Bids
  • 2025-05-21 · SDDOT · 08W5 · $30.00 per Ft · qty 18.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.