Site-work prices, Stanley County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon5$110.00$53.50 to $660.00
Bids
  • 2025-04-02 · SDDOT · 08H1 · $500.00 per Ton · qty 10.1 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $110.00 per Ton · qty 1617.7 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $660.00 per Ton · qty 4293.6 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $53.50 per Ton · qty 68407.2 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $61.50 per Ton · qty 5270.9 · bid tab
excavation embankmentCuYd5$15.00$4.90 to $19.00
Bids
  • 2026-02-04 · SDDOT · 08RR · $12.00 per CuYd · qty 7734.0 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $15.00 per CuYd · qty 1717.0 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $4.90 per CuYd · qty 38283.0 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $16.20 per CuYd · qty 24042.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $19.00 per CuYd · qty 7232.0 · bid tab
flexible baseTon2$27.90$13.30 to $42.50
Bids
  • 2025-02-05 · SDDOT · 06QP · $13.30 per Ton · qty 991.5 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $42.50 per Ton · qty 7712.6 · bid tab
inlet headwallEach1$288.00$288.00 to $288.00
Bids
  • 2025-02-05 · SDDOT · 06QP · $288.00 per Each · qty 12.0 · bid tab
lime cement stabilizationTon1$250.00$250.00 to $250.00
Bids
  • 2025-02-05 · SDDOT · 06QP · $250.00 per Ton · qty 728.2 · bid tab
storm pipe 18-inchFt2$40.00$30.00 to $50.00
Bids
  • 2026-02-04 · SDDOT · 08RR · $30.00 per Ft · qty 46.0 · bid tab
  • 2026-02-04 · SDDOT · 08RR · $50.00 per Ft · qty 46.0 · bid tab
storm pipe 24-inchFt8$81.85$65.00 to $152.00
Bids
  • 2025-02-05 · SDDOT · 06QP · $78.70 per Ft · qty 184.0 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $152.00 per Ft · qty 184.0 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $89.20 per Ft · qty 86.0 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $68.20 per Ft · qty 86.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $95.00 per Ft · qty 20.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $85.00 per Ft · qty 20.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $75.00 per Ft · qty 48.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $65.00 per Ft · qty 48.0 · bid tab
storm pipe 30-inchFt4$84.60$80.00 to $99.60
Bids
  • 2025-02-05 · SDDOT · 06QP · $99.60 per Ft · qty 50.0 · bid tab
  • 2025-02-05 · SDDOT · 06QP · $89.20 per Ft · qty 50.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $80.00 per Ft · qty 352.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $80.00 per Ft · qty 352.0 · bid tab
storm pipe 36-inchFt2$92.50$85.00 to $100.00
Bids
  • 2024-12-04 · SDDOT · 06X7 · $100.00 per Ft · qty 422.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $85.00 per Ft · qty 422.0 · bid tab
storm pipe 42-inchFt4$150.00$115.00 to $225.00
Bids
  • 2024-12-04 · SDDOT · 06X7 · $175.00 per Ft · qty 8.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $225.00 per Ft · qty 8.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $125.00 per Ft · qty 40.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $115.00 per Ft · qty 40.0 · bid tab
storm pipe (diameter not stated)Ft2$80.00$20.00 to $140.00
Bids
  • 2024-12-04 · SDDOT · 06X7 · $140.00 per Ft · qty 204.0 · bid tab
  • 2024-12-04 · SDDOT · 06X7 · $20.00 per Ft · qty 204.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.