Site-work prices, Miner County, SD
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| excavation embankment | CuYd | 7 | $7.10 | $4.60 to $21.25 | Bids- 2026-02-04 · SDDOT · 09MC · $4.60 per CuYd · qty 5535.0 · bid tab
- 2026-02-04 · SDDOT · 09MC · $6.90 per CuYd · qty 445.0 · bid tab
- 2025-09-03 · SDDOT · 09AN · $18.31 per CuYd · qty 492.0 · bid tab
- 2025-09-03 · SDDOT · 09AN · $6.60 per CuYd · qty 1636.0 · bid tab
- 2025-05-07 · SDDOT · 08N1 · $7.10 per CuYd · qty 1371.0 · bid tab
- 2025-05-07 · SDDOT · 08N1 · $21.25 per CuYd · qty 695.0 · bid tab
- 2024-01-17 · SDDOT · 084R · $12.35 per CuYd · qty 7792.0 · bid tab
|
| flexible base | Ton | 1 | $31.20 | $31.20 to $31.20 | Bids- 2024-01-17 · SDDOT · 084R · $31.20 per Ton · qty 1095.3 · bid tab
|
| storm pipe 18-inch | Ft | 2 | $32.20 | $13.80 to $50.60 | Bids- 2026-02-04 · SDDOT · 09MC · $13.80 per Ft · qty 120.0 · bid tab
- 2026-02-04 · SDDOT · 09MC · $50.60 per Ft · qty 120.0 · bid tab
|
| storm pipe 24-inch | Ft | 2 | $40.83 | $17.25 to $64.40 | Bids- 2026-02-04 · SDDOT · 09MC · $64.40 per Ft · qty 36.0 · bid tab
- 2026-02-04 · SDDOT · 09MC · $17.25 per Ft · qty 36.0 · bid tab
|
| storm pipe 36-inch | Ft | 2 | $111.00 | $102.00 to $120.00 | Bids- 2024-01-17 · SDDOT · 084R · $102.00 per Ft · qty 26.0 · bid tab
- 2024-01-17 · SDDOT · 084R · $120.00 per Ft · qty 26.0 · bid tab
|
| storm pipe 48-inch | Ft | 2 | $153.00 | $126.00 to $180.00 | Bids- 2024-01-17 · SDDOT · 084R · $180.00 per Ft · qty 30.0 · bid tab
- 2024-01-17 · SDDOT · 084R · $126.00 per Ft · qty 30.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.