Site-work prices, Meade County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon6$107.56$12.53 to $809.31
Bids
  • 2026-05-13 · SDDOT · 034J · $133.67 per Ton · qty 14642.1 · bid tab
  • 2026-05-13 · SDDOT · 034J · $12.53 per Ton · qty 68735.5 · bid tab
  • 2026-05-13 · SDDOT · 034J · $12.53 per Ton · qty 15558.9 · bid tab
  • 2026-05-13 · SDDOT · 034J · $809.31 per Ton · qty 1473.8 · bid tab
  • 2026-05-13 · SDDOT · 034J · $81.45 per Ton · qty 24542.4 · bid tab
  • 2024-10-02 · SDDOT · 06XN · $190.00 per Ton · qty 553.7 · bid tab
concrete pavementEach1$15.66$15.66 to $15.66
Bids
  • 2026-05-13 · SDDOT · 034J · $15.66 per Each · qty 1617.0 · bid tab
concrete pavementSqYd2$77.28$76.23 to $78.32
Bids
  • 2026-05-13 · SDDOT · 034J · $78.32 per SqYd · qty 82691.8 · bid tab
  • 2026-05-13 · SDDOT · 034J · $76.23 per SqYd · qty 12873.7 · bid tab
curb gutterFt3$31.06$29.95 to $35.49
Bids
  • 2026-05-13 · SDDOT · 034J · $31.06 per Ft · qty 5062.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $35.49 per Ft · qty 1063.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $29.95 per Ft · qty 361.0 · bid tab
excavation embankmentCuYd8$10.00$5.22 to $31.33
Bids
  • 2026-05-13 · SDDOT · 034J · $7.83 per CuYd · qty 45400.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $6.79 per CuYd · qty 524750.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $5.22 per CuYd · qty 519537.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $31.33 per CuYd · qty 2438.0 · bid tab
  • 2025-02-05 · SDDOT · 09A3 · $30.00 per CuYd · qty 18.0 · bid tab
  • 2025-01-22 · SDDOT · 08NW · $12.00 per CuYd · qty 1440.0 · bid tab
  • 2024-10-02 · SDDOT · 06XN · $13.00 per CuYd · qty 9723.0 · bid tab
  • 2024-10-02 · SDDOT · 06XN · $8.00 per CuYd · qty 3914.0 · bid tab
flexible baseTon4$39.91$8.88 to $51.00
Bids
  • 2026-05-13 · SDDOT · 034J · $8.88 per Ton · qty 68735.5 · bid tab
  • 2026-05-13 · SDDOT · 034J · $30.81 per Ton · qty 42797.5 · bid tab
  • 2025-01-22 · SDDOT · 08NW · $51.00 per Ton · qty 277.0 · bid tab
  • 2024-10-02 · SDDOT · 06XN · $49.00 per Ton · qty 2278.6 · bid tab
inlet headwallEach4$531.38$249.40 to $6,995.97
Bids
  • 2026-05-13 · SDDOT · 034J · $785.49 per Each · qty 32.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $249.40 per Each · qty 5.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $277.28 per Each · qty 36.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $6,995.97 per Each · qty 2.0 · bid tab
inlet headwallFt1$27.73$27.73 to $27.73
Bids
  • 2026-05-13 · SDDOT · 034J · $27.73 per Ft · qty 16.0 · bid tab
lime cement stabilizationAcre2$1,720.93$1,441.86 to $2,000.00
Bids
  • 2026-05-13 · SDDOT · 034J · $1,441.86 per Acre · qty 87.0 · bid tab
  • 2024-10-02 · SDDOT · 06XN · $2,000.00 per Acre · qty 1.4 · bid tab
manholeEach3$1,972.18$783.20 to $7,760.91
Bids
  • 2026-05-13 · SDDOT · 034J · $783.20 per Each · qty 12.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $7,760.91 per Each · qty 1.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $1,972.18 per Each · qty 1.0 · bid tab
storm pipe 12-inchFt2$64.15$23.87 to $104.43
Bids
  • 2026-05-13 · SDDOT · 034J · $104.43 per Ft · qty 84.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $23.87 per Ft · qty 84.0 · bid tab
storm pipe 18-inchFt4$37.11$35.79 to $60.10
Bids
  • 2026-05-13 · SDDOT · 034J · $36.55 per Ft · qty 108.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $60.10 per Ft · qty 2414.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $37.67 per Ft · qty 2414.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $35.79 per Ft · qty 108.0 · bid tab
storm pipe 24-inchFt8$60.68$36.55 to $104.43
Bids
  • 2026-05-13 · SDDOT · 034J · $36.55 per Ft · qty 134.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $55.25 per Ft · qty 268.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $45.53 per Ft · qty 1408.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $75.74 per Ft · qty 134.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $62.31 per Ft · qty 162.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $92.15 per Ft · qty 82.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $59.05 per Ft · qty 1838.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $104.43 per Ft · qty 82.0 · bid tab
storm pipe 30-inchFt2$62.87$61.90 to $63.84
Bids
  • 2026-05-13 · SDDOT · 034J · $63.84 per Ft · qty 1362.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $61.90 per Ft · qty 1362.0 · bid tab
storm pipe 36-inchFt6$93.50$71.32 to $136.33
Bids
  • 2026-05-13 · SDDOT · 034J · $71.32 per Ft · qty 932.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $89.98 per Ft · qty 932.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $136.33 per Ft · qty 708.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $104.43 per Ft · qty 708.0 · bid tab
  • 2025-01-22 · SDDOT · 08NW · $92.00 per Ft · qty 56.0 · bid tab
  • 2025-01-22 · SDDOT · 08NW · $95.00 per Ft · qty 56.0 · bid tab
storm pipe 42-inchFt2$142.27$125.33 to $159.21
Bids
  • 2026-05-13 · SDDOT · 034J · $159.21 per Ft · qty 52.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $125.33 per Ft · qty 52.0 · bid tab
storm pipe 48-inchFt2$127.16$95.94 to $158.38
Bids
  • 2026-05-13 · SDDOT · 034J · $95.94 per Ft · qty 296.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $158.38 per Ft · qty 296.0 · bid tab
storm pipe 60-inchFt4$216.37$185.70 to $283.04
Bids
  • 2026-05-13 · SDDOT · 034J · $185.70 per Ft · qty 106.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $224.14 per Ft · qty 1506.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $283.04 per Ft · qty 106.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $208.60 per Ft · qty 1506.0 · bid tab
storm pipe 72-inchFt2$218.05$130.53 to $305.57
Bids
  • 2026-05-13 · SDDOT · 034J · $130.53 per Ft · qty 222.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $305.57 per Ft · qty 222.0 · bid tab
storm pipe (diameter not stated)Ft12$655.53$277.28 to $2,300.00
Bids
  • 2026-05-13 · SDDOT · 034J · $313.28 per Ft · qty 244.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $1,185.38 per Ft · qty 190.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $1,479.07 per Ft · qty 244.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $388.19 per Ft · qty 190.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $277.28 per Ft · qty 270.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $885.72 per Ft · qty 244.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $277.28 per Ft · qty 236.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $736.06 per Ft · qty 270.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $313.28 per Ft · qty 244.0 · bid tab
  • 2026-05-13 · SDDOT · 034J · $798.95 per Ft · qty 236.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.