Site-work prices, Mccook, Minnehaha County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon12$61.11$6.31 to $979.70
Bids
  • 2024-04-04 · SDDOT · 05UR · $172.56 per Ton · qty 1290.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $778.23 per Ton · qty 2033.3 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $35.30 per Ton · qty 39730.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $46.29 per Ton · qty 2485.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $959.50 per Ton · qty 443.4 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $56.56 per Ton · qty 11103.2 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $979.70 per Ton · qty 354.7 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $65.65 per Ton · qty 6176.6 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $7.83 per Ton · qty 57876.3 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $129.28 per Ton · qty 7508.9 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
concrete pavementSqYd3$45.25$10.10 to $59.94
Bids
  • 2023-11-15 · SDDOT · 05T2 · $59.94 per SqYd · qty 201388.2 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $45.25 per SqYd · qty 45444.6 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $10.10 per SqYd · qty 4574.9 · bid tab
excavation embankmentCuYd7$11.00$2.40 to $60.60
Bids
  • 2024-04-04 · SDDOT · 05UR · $7.48 per CuYd · qty 10566.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $15.53 per CuYd · qty 18075.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $15.00 per CuYd · qty 828.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $2.40 per CuYd · qty 370791.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $60.60 per CuYd · qty 1433.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $11.00 per CuYd · qty 25.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $8.08 per CuYd · qty 67308.0 · bid tab
flexible baseTon3$16.16$7.57 to $28.76
Bids
  • 2024-04-04 · SDDOT · 05UR · $28.76 per Ton · qty 5982.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $7.57 per Ton · qty 38494.3 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $16.16 per Ton · qty 12536.4 · bid tab
inlet headwallEach2$505.00$505.00 to $505.00
Bids
  • 2023-11-15 · SDDOT · 05T2 · $505.00 per Each · qty 2.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $505.00 per Each · qty 4.0 · bid tab
lime cement stabilizationTon2$283.19$202.00 to $364.38
Bids
  • 2024-04-04 · SDDOT · 05UR · $364.38 per Ton · qty 417.9 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $202.00 per Ton · qty 61.1 · bid tab
manholeEach1$1,161.50$1,161.50 to $1,161.50
Bids
  • 2023-11-15 · SDDOT · 05T2 · $1,161.50 per Each · qty 201.0 · bid tab
storm pipe 18-inchFt4$49.71$37.41 to $62.64
Bids
  • 2023-11-15 · SDDOT · 05T2 · $47.11 per Ft · qty 198.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $52.31 per Ft · qty 146.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $62.64 per Ft · qty 146.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $37.41 per Ft · qty 198.0 · bid tab
storm pipe 24-inchFt8$71.35$37.41 to $103.53
Bids
  • 2024-04-04 · SDDOT · 05UR · $101.23 per Ft · qty 72.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $74.77 per Ft · qty 72.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $97.78 per Ft · qty 310.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $103.53 per Ft · qty 310.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $62.94 per Ft · qty 958.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $67.94 per Ft · qty 958.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $62.81 per Ft · qty 220.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $37.41 per Ft · qty 220.0 · bid tab
storm pipe 30-inchFt6$105.83$74.31 to $143.80
Bids
  • 2024-04-04 · SDDOT · 05UR · $132.29 per Ft · qty 186.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $108.13 per Ft · qty 158.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $103.53 per Ft · qty 158.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $143.80 per Ft · qty 186.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $74.31 per Ft · qty 20.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $102.02 per Ft · qty 20.0 · bid tab
storm pipe 36-inchFt2$129.42$115.04 to $143.80
Bids
  • 2024-04-04 · SDDOT · 05UR · $115.04 per Ft · qty 20.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $143.80 per Ft · qty 20.0 · bid tab
storm pipe 42-inchFt2$138.61$122.11 to $155.11
Bids
  • 2023-11-15 · SDDOT · 05T2 · $122.11 per Ft · qty 24.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $155.11 per Ft · qty 24.0 · bid tab
storm pipe 54-inchFt2$213.57$169.98 to $257.16
Bids
  • 2023-11-15 · SDDOT · 05T2 · $257.16 per Ft · qty 78.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $169.98 per Ft · qty 78.0 · bid tab
storm pipe 78-inchFt2$520.35$306.02 to $734.67
Bids
  • 2023-11-15 · SDDOT · 05T2 · $306.02 per Ft · qty 8.0 · bid tab
  • 2023-11-15 · SDDOT · 05T2 · $734.67 per Ft · qty 8.0 · bid tab
storm pipe (diameter not stated)Ft2$117.91$28.76 to $207.07
Bids
  • 2024-04-04 · SDDOT · 05UR · $28.76 per Ft · qty 48.0 · bid tab
  • 2024-04-04 · SDDOT · 05UR · $207.07 per Ft · qty 48.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.