| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | Ton | 12 | $122.22 | $5.00 to $935.00 | Bids- 2026-05-13 · SDDOT · 0952 · $132.45 per Ton · qty 784.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $46.10 per Ton · qty 25310.9 · bid tab
- 2026-01-21 · SDDOT · 08GM · $5.00 per Ton · qty 15548.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $65.00 per Ton · qty 1176.1 · bid tab
- 2026-01-21 · SDDOT · 08GM · $640.00 per Ton · qty 1317.4 · bid tab
- 2026-01-21 · SDDOT · 08GM · $90.00 per Ton · qty 428.2 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $212.00 per Ton · qty 360.3 · bid tab
- 2025-10-15 · SDDOT · 09MH · $139.44 per Ton · qty 348.8 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $112.00 per Ton · qty 2545.4 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $935.00 per Ton · qty 530.8 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| concrete pavement | Each | 3 | $12.00 | $11.85 to $45.00 | Bids- 2026-05-20 · SDDOT · 0ADY · $12.00 per Each · qty 138.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $11.85 per Each · qty 5743.0 · bid tab
- 2024-02-07 · SDDOT · 07D5 · $45.00 per Each · qty 64.0 · bid tab
|
| concrete pavement | SqYd | 12 | $75.85 | $17.82 to $200.00 | Bids- 2026-05-20 · SDDOT · 0ADY · $75.00 per SqYd · qty 328.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $95.10 per SqYd · qty 952.2 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $73.45 per SqYd · qty 26069.8 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $79.85 per SqYd · qty 1289.9 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $76.70 per SqYd · qty 6291.8 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $17.82 per SqYd · qty 8743.6 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $72.55 per SqYd · qty 25562.2 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $67.50 per SqYd · qty 1706.7 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $100.70 per SqYd · qty 7469.7 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $66.55 per SqYd · qty 95854.4 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| curb gutter | Ft | 12 | $28.25 | $25.00 to $85.00 | Bids- 2026-05-20 · SDDOT · 0ADY · $27.00 per Ft · qty 366.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $28.25 per Ft · qty 7194.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $28.25 per Ft · qty 7772.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $30.45 per Ft · qty 4797.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $30.45 per Ft · qty 138.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $25.00 per Ft · qty 6659.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $32.50 per Ft · qty 480.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $25.00 per Ft · qty 6242.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $32.50 per Ft · qty 368.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $27.10 per Ft · qty 17136.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| excavation embankment | CuYd | 18 | $19.04 | $3.00 to $450.00 | Bids- 2026-04-01 · SDDOT · 09M3 · $30.00 per CuYd · qty 73.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $8.00 per CuYd · qty 28313.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $3.00 per CuYd · qty 43233.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $15.00 per CuYd · qty 261.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $11.66 per CuYd · qty 336748.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $21.20 per CuYd · qty 6578.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $5.04 per CuYd · qty 214115.0 · bid tab
- 2025-10-15 · SDDOT · 09MH · $16.87 per CuYd · qty 1834.0 · bid tab
- 2025-10-15 · SDDOT · 09MH · $29.14 per CuYd · qty 76.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $23.18 per CuYd · qty 154703.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed) |
| fire hydrant | Each | 5 | $1,411.37 | $996.00 to $4,849.54 | Bids- 2025-10-15 · SDDOT · X06R · $4,849.54 per Each · qty 7.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $4,731.76 per Each · qty 3.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $1,034.63 per Each · qty 1.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $1,411.37 per Each · qty 1.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $996.00 per Each · qty 1.0 · bid tab
|
| flexible base | Ton | 7 | $18.20 | $5.00 to $32.00 | Bids- 2026-01-21 · SDDOT · 08GM · $5.00 per Ton · qty 15548.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $15.21 per Ton · qty 10587.6 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $20.00 per Ton · qty 14179.0 · bid tab
- 2025-10-15 · SDDOT · 09MH · $22.88 per Ton · qty 527.9 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $16.37 per Ton · qty 39512.6 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $18.20 per Ton · qty 8765.0 · bid tab
- 2023-12-06 · SDDOT · 085C · $32.00 per Ton · qty 692.0 · bid tab
|
| inlet headwall | Each | 11 | $350.00 | $75.00 to $6,500.00 | Bids- 2025-10-15 · SDDOT · 06JQ · $385.00 per Each · qty 28.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $238.50 per Each · qty 19.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $90.10 per Each · qty 32.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $3,955.00 per Each · qty 8.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $75.00 per Each · qty 138.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $300.00 per Each · qty 7.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $6,175.00 per Each · qty 4.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $350.00 per Each · qty 138.0 · bid tab
- 2024-02-07 · SDDOT · 07D5 · $6,500.00 per Each · qty 8.0 · bid tab
- 2024-02-07 · SDDOT · 07D5 · $325.00 per Each · qty 8.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed) |
| inlet headwall | Ft | 2 | $4.22 | $3.45 to $5.00 | Bids- 2025-10-15 · SDDOT · 06JQ · $3.45 per Ft · qty 306.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $5.00 per Ft · qty 48.0 · bid tab
|
| lime cement stabilization | Acre | 2 | $341.25 | $132.50 to $550.00 | Bids- 2025-10-15 · SDDOT · 06JQ · $132.50 per Acre · qty 52.2 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $550.00 per Acre · qty 20.0 · bid tab
|
| lime cement stabilization | Ton | 2 | $201.36 | $37.72 to $365.00 | Bids- 2026-01-21 · SDDOT · 08GM · $365.00 per Ton · qty 261.2 · bid tab
- 2025-10-15 · SDDOT · X06R · $37.72 per Ton · qty 100.0 · bid tab
|
| manhole | Each | 16 | $1,108.00 | $133.13 to $9,852.73 | Bids- 2026-01-21 · SDDOT · 08GM · $925.00 per Each · qty 15.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $1,050.00 per Each · qty 1.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $1,166.00 per Each · qty 2.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $1,272.00 per Each · qty 73.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $265.00 per Each · qty 3.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $954.00 per Each · qty 7.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $1,490.00 per Each · qty 102.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $975.00 per Each · qty 2.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $172.53 per Each · qty 6.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $9,852.73 per Each · qty 6.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed) |
| sewer main 10-inch | Ft | 3 | $16.61 | $14.00 to $32.58 | Bids- 2025-02-12 · SDDOT · X06Q · $14.00 per Ft · qty 900.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $16.61 per Ft · qty 900.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $32.58 per Ft · qty 385.0 · bid tab
|
| sewer main 12-inch | Ft | 2 | $18.80 | $15.00 to $22.60 | Bids- 2025-02-12 · SDDOT · X06Q · $15.00 per Ft · qty 435.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $22.60 per Ft · qty 435.0 · bid tab
|
| sewer main 8-inch | Ft | 2 | $11.38 | $11.00 to $11.75 | Bids- 2025-02-12 · SDDOT · X06Q · $11.75 per Ft · qty 391.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $11.00 per Ft · qty 391.0 · bid tab
|
| storm pipe 12-inch | Ft | 4 | $24.54 | $18.02 to $95.00 | Bids- 2025-10-15 · SDDOT · 06JQ · $18.02 per Ft · qty 354.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $19.08 per Ft · qty 354.0 · bid tab
- 2024-02-07 · SDDOT · 07D5 · $30.00 per Ft · qty 172.0 · bid tab
- 2024-02-07 · SDDOT · 07D5 · $95.00 per Ft · qty 172.0 · bid tab
|
| storm pipe 18-inch | Ft | 18 | $33.93 | $15.00 to $70.00 | Bids- 2026-01-21 · SDDOT · 08GM · $40.00 per Ft · qty 34.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $35.00 per Ft · qty 116.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $26.00 per Ft · qty 34.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $24.16 per Ft · qty 116.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $15.90 per Ft · qty 726.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $56.18 per Ft · qty 726.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $32.86 per Ft · qty 4760.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $26.50 per Ft · qty 92.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $44.52 per Ft · qty 92.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $19.08 per Ft · qty 4760.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed) |
| storm pipe 24-inch | Ft | 17 | $51.00 | $19.08 to $74.20 | Bids- 2026-01-21 · SDDOT · 08GM · $53.00 per Ft · qty 184.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $51.00 per Ft · qty 154.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $32.25 per Ft · qty 184.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $51.34 per Ft · qty 154.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $74.20 per Ft · qty 134.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $62.01 per Ft · qty 110.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $19.08 per Ft · qty 134.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $47.70 per Ft · qty 396.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $55.65 per Ft · qty 364.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $29.68 per Ft · qty 110.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed) |
| storm pipe 30-inch | Ft | 9 | $65.00 | $26.50 to $93.28 | Bids- 2026-01-21 · SDDOT · 08GM · $70.20 per Ft · qty 222.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $65.00 per Ft · qty 222.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $26.50 per Ft · qty 936.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $92.22 per Ft · qty 876.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $31.80 per Ft · qty 876.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $93.28 per Ft · qty 228.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $67.84 per Ft · qty 708.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $44.40 per Ft · qty 1200.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $45.97 per Ft · qty 1200.0 · bid tab
|
| storm pipe 36-inch | Ft | 7 | $73.02 | $31.80 to $178.05 | Bids- 2025-10-15 · SDDOT · 06JQ · $31.80 per Ft · qty 110.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $96.46 per Ft · qty 110.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $59.00 per Ft · qty 1254.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $73.02 per Ft · qty 64.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $91.42 per Ft · qty 64.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $62.70 per Ft · qty 962.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $178.05 per Ft · qty 164.0 · bid tab
|
| storm pipe 42-inch | Ft | 9 | $91.95 | $31.80 to $169.60 | Bids- 2026-01-21 · SDDOT · 08GM · $93.00 per Ft · qty 176.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $145.22 per Ft · qty 176.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $169.60 per Ft · qty 296.0 · bid tab
- 2025-10-15 · SDDOT · 06JQ · $31.80 per Ft · qty 296.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $63.50 per Ft · qty 678.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $117.26 per Ft · qty 120.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $78.74 per Ft · qty 408.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $78.11 per Ft · qty 70.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $91.95 per Ft · qty 80.0 · bid tab
|
| storm pipe 48-inch | Ft | 2 | $83.55 | $69.50 to $97.59 | Bids- 2025-02-12 · SDDOT · 01V7 · $69.50 per Ft · qty 630.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $97.59 per Ft · qty 630.0 · bid tab
|
| storm pipe (diameter not stated) | Ft | 7 | $400.00 | $40.00 to $1,578.00 | Bids- 2026-01-21 · SDDOT · 08GM · $200.00 per Ft · qty 139.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $40.00 per Ft · qty 139.0 · bid tab
- 2026-01-21 · SDDOT · 08GM · $1,578.00 per Ft · qty 80.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $400.00 per Ft · qty 198.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $690.20 per Ft · qty 138.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $1,343.31 per Ft · qty 198.0 · bid tab
- 2025-02-12 · SDDOT · 01V7 · $350.00 per Ft · qty 138.0 · bid tab
|
| water main 12-inch | Ft | 2 | $74.97 | $69.11 to $80.83 | Bids- 2025-10-15 · SDDOT · X06R · $80.83 per Ft · qty 435.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $69.11 per Ft · qty 49.0 · bid tab
|
| water main 16-inch | Ft | 4 | $107.64 | $64.66 to $135.87 | Bids- 2025-10-15 · SDDOT · X06R · $134.71 per Ft · qty 1876.0 · bid tab
- 2025-10-15 · SDDOT · X06R · $64.66 per Ft · qty 2244.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $135.87 per Ft · qty 48.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $80.56 per Ft · qty 920.0 · bid tab
|
| water main 6-inch | Ft | 2 | $34.25 | $30.78 to $37.72 | Bids- 2025-10-15 · SDDOT · X06R · $37.72 per Ft · qty 372.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $30.78 per Ft · qty 86.0 · bid tab
|
| water main 8-inch | Ft | 1 | $43.49 | $43.49 to $43.49 | Bids- 2025-02-12 · SDDOT · X06Q · $43.49 per Ft · qty 42.0 · bid tab
|
| water main (diameter not stated) | Ft | 4 | $4.77 | $0.01 to $9.16 | Bids- 2025-10-15 · SDDOT · X06R · $9.16 per Ft · qty 4702.0 · bid tab
- 2025-10-15 · SDDOT · X06R · $0.54 per Ft · qty 2700.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $0.01 per Ft · qty 1145.0 · bid tab
- 2025-02-12 · SDDOT · X06Q · $9.00 per Ft · qty 1145.0 · bid tab
|
| water service | Each | 1 | $538.84 | $538.84 to $538.84 | Bids- 2025-10-15 · SDDOT · X06R · $538.84 per Each · qty 3.0 · bid tab
|