Site-work prices, Lawrence County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon10$192.50$70.00 to $300.00
Bids
  • 2026-03-18 · SDDOT · 089U · $127.10 per Ton · qty 1774.2 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $300.00 per Ton · qty 114.0 · bid tab
  • 2026-02-18 · SDDOT · 08UX · $160.00 per Ton · qty 135.0 · bid tab
  • 2025-11-19 · SDDOT · 0954 · $229.25 per Ton · qty 252.1 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $143.00 per Ton · qty 2823.9 · bid tab
  • 2025-02-05 · SDDOT · 081A · $220.00 per Ton · qty 267.4 · bid tab
  • 2024-08-21 · SDDOT · 07D3 · $185.00 per Ton · qty 428.0 · bid tab
  • 2024-08-21 · SDDOT · 08NQ · $70.00 per Ton · qty 471.0 · bid tab
  • 2023-12-13 · SDDOT · 08E7 · $200.00 per Ton · qty 649.0 · bid tab
  • 2023-12-13 · SDDOT · 09FY · $200.00 per Ton · qty 332.0 · bid tab
concrete pavementEach4$15.50$13.50 to $45.00
Bids
  • 2026-05-06 · SDDOT · 08LL · $15.00 per Each · qty 863.0 · bid tab
  • 2026-02-18 · SDDOT · 08UX · $13.50 per Each · qty 790.0 · bid tab
  • 2025-02-05 · SDDOT · 081A · $16.00 per Each · qty 832.0 · bid tab
  • 2024-08-21 · SDDOT · 07D3 · $45.00 per Each · qty 1200.0 · bid tab
concrete pavementSqYd4$120.00$68.50 to $200.00
Bids
  • 2026-05-06 · SDDOT · 08LL · $90.00 per SqYd · qty 4254.9 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $200.00 per SqYd · qty 5.9 · bid tab
  • 2026-02-18 · SDDOT · 08UX · $68.50 per SqYd · qty 7550.0 · bid tab
  • 2024-08-21 · SDDOT · 07D3 · $150.00 per SqYd · qty 2666.6 · bid tab
curb gutterFt2$80.00$35.00 to $125.00
Bids
  • 2026-05-06 · SDDOT · 08LL · $35.00 per Ft · qty 1343.0 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $125.00 per Ft · qty 11.0 · bid tab
excavation embankmentCuYd18$22.62$3.90 to $138.00
Bids
  • 2026-05-06 · SDDOT · 08LL · $4.90 per CuYd · qty 7539.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $6.90 per CuYd · qty 127364.0 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $20.00 per CuYd · qty 1182.0 · bid tab
  • 2026-02-18 · SDDOT · 08UX · $20.25 per CuYd · qty 7622.0 · bid tab
  • 2026-02-18 · SDDOT · 08UX · $3.90 per CuYd · qty 6926.0 · bid tab
  • 2025-11-19 · SDDOT · 0954 · $42.07 per CuYd · qty 3644.0 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $29.00 per CuYd · qty 133.0 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $12.25 per CuYd · qty 17446.0 · bid tab
  • 2025-09-03 · SDDOT · 0854 · $20.00 per CuYd · qty 579.0 · bid tab
  • 2025-09-03 · SDDOT · 0854 · $80.00 per CuYd · qty 311.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed)
fire hydrantEach1$12,000.00$12,000.00 to $12,000.00
Bids
  • 2023-12-13 · SDDOT · 09FY · $12,000.00 per Each · qty 1.0 · bid tab
flexible baseTon8$49.50$22.00 to $95.00
Bids
  • 2026-03-18 · SDDOT · 089U · $22.50 per Ton · qty 542.4 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $60.00 per Ton · qty 102.0 · bid tab
  • 2026-02-18 · SDDOT · 08UX · $22.00 per Ton · qty 161.6 · bid tab
  • 2025-11-19 · SDDOT · 0954 · $72.82 per Ton · qty 533.6 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $44.00 per Ton · qty 6576.3 · bid tab
  • 2024-08-21 · SDDOT · 07D3 · $95.00 per Ton · qty 1065.0 · bid tab
  • 2023-12-13 · SDDOT · 08E7 · $40.00 per Ton · qty 3131.0 · bid tab
  • 2023-12-13 · SDDOT · 09FY · $55.00 per Ton · qty 794.0 · bid tab
inlet headwallEach9$897.35$120.00 to $12,063.30
Bids
  • 2026-05-06 · SDDOT · 08LL · $120.00 per Each · qty 1.0 · bid tab
  • 2026-05-06 · SDDOT · 08LL · $8,500.00 per Each · qty 1.0 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $700.00 per Each · qty 1.0 · bid tab
  • 2025-11-19 · SDDOT · 0954 · $897.35 per Each · qty 1.0 · bid tab
  • 2025-11-19 · SDDOT · 0954 · $12,063.30 per Each · qty 1.0 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $850.00 per Each · qty 1.0 · bid tab
  • 2025-02-05 · SDDOT · 081A · $1,500.00 per Each · qty 4.0 · bid tab
  • 2023-12-13 · SDDOT · 08E7 · $270.00 per Each · qty 2.0 · bid tab
  • 2023-12-13 · SDDOT · 09FY · $3,615.00 per Each · qty 2.0 · bid tab
inlet headwallFt1$39.50$39.50 to $39.50
Bids
  • 2023-12-13 · SDDOT · 09FY · $39.50 per Ft · qty 24.0 · bid tab
lime cement stabilizationAcre1$3,300.00$3,300.00 to $3,300.00
Bids
  • 2025-10-15 · SDDOT · 06XL · $3,300.00 per Acre · qty 1.0 · bid tab
manholeEach4$1,413.00$769.00 to $6,095.00
Bids
  • 2026-05-06 · SDDOT · 08LL · $769.00 per Each · qty 6.0 · bid tab
  • 2026-05-06 · SDDOT · 08LL · $1,898.00 per Each · qty 1.0 · bid tab
  • 2026-05-06 · SDDOT · 08LL · $928.00 per Each · qty 4.0 · bid tab
  • 2023-12-13 · SDDOT · 09FY · $6,095.00 per Each · qty 1.0 · bid tab
storm pipe 15-inchFt2$61.75$33.50 to $90.00
Bids
  • 2023-12-13 · SDDOT · 09FY · $90.00 per Ft · qty 22.0 · bid tab
  • 2023-12-13 · SDDOT · 09FY · $33.50 per Ft · qty 22.0 · bid tab
storm pipe 18-inchFt12$46.00$23.68 to $76.65
Bids
  • 2026-05-06 · SDDOT · 08LL · $74.50 per Ft · qty 16.0 · bid tab
  • 2026-05-06 · SDDOT · 08LL · $76.65 per Ft · qty 16.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $23.68 per Ft · qty 30.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $45.00 per Ft · qty 34.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $60.50 per Ft · qty 34.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $25.00 per Ft · qty 30.0 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $36.00 per Ft · qty 54.0 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $28.00 per Ft · qty 54.0 · bid tab
  • 2023-12-13 · SDDOT · 08E7 · $47.00 per Ft · qty 186.0 · bid tab
  • 2023-12-13 · SDDOT · 08E7 · $42.00 per Ft · qty 138.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
storm pipe 24-inchFt20$60.23$28.00 to $200.00
Bids
  • 2026-05-06 · SDDOT · 08LL · $134.10 per Ft · qty 158.0 · bid tab
  • 2026-05-06 · SDDOT · 08LL · $39.40 per Ft · qty 158.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $30.00 per Ft · qty 56.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $28.98 per Ft · qty 56.0 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $55.00 per Ft · qty 68.0 · bid tab
  • 2026-03-04 · SDDOT · 08RV · $65.00 per Ft · qty 68.0 · bid tab
  • 2025-11-19 · SDDOT · 0954 · $65.83 per Ft · qty 40.0 · bid tab
  • 2025-11-19 · SDDOT · 0954 · $63.45 per Ft · qty 40.0 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $57.00 per Ft · qty 164.0 · bid tab
  • 2025-10-15 · SDDOT · 06XL · $46.00 per Ft · qty 40.0 · bid tab
(10 most recent of 20 shown; all in the Hubstake feed)
storm pipe 30-inchFt2$112.50$50.00 to $175.00
Bids
  • 2026-02-18 · SDDOT · 08UX · $50.00 per Ft · qty 24.0 · bid tab
  • 2026-02-18 · SDDOT · 08UX · $175.00 per Ft · qty 24.0 · bid tab
storm pipe 36-inchFt2$40.12$35.00 to $45.25
Bids
  • 2026-03-18 · SDDOT · 089U · $35.00 per Ft · qty 18.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $45.25 per Ft · qty 18.0 · bid tab
storm pipe 48-inchFt4$146.69$60.00 to $230.00
Bids
  • 2026-03-18 · SDDOT · 089U · $173.38 per Ft · qty 92.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $60.00 per Ft · qty 92.0 · bid tab
  • 2023-12-13 · SDDOT · 08E7 · $120.00 per Ft · qty 18.0 · bid tab
  • 2023-12-13 · SDDOT · 08E7 · $230.00 per Ft · qty 18.0 · bid tab
storm pipe 4-inchFt1$30.00$30.00 to $30.00
Bids
  • 2026-03-18 · SDDOT · 089U · $30.00 per Ft · qty 40.0 · bid tab
storm pipe 54-inchFt2$159.43$100.00 to $218.85
Bids
  • 2026-03-18 · SDDOT · 089U · $100.00 per Ft · qty 20.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $218.85 per Ft · qty 20.0 · bid tab
storm pipe 72-inchFt4$108.73$40.00 to $370.32
Bids
  • 2026-03-18 · SDDOT · 089U · $370.32 per Ft · qty 52.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $105.00 per Ft · qty 52.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $40.00 per Ft · qty 80.0 · bid tab
  • 2026-03-18 · SDDOT · 089U · $112.47 per Ft · qty 80.0 · bid tab
water main 6-inchFt1$170.00$170.00 to $170.00
Bids
  • 2023-12-13 · SDDOT · 09FY · $170.00 per Ft · qty 72.0 · bid tab
water main (diameter not stated)Ft1$12.50$12.50 to $12.50
Bids
  • 2023-12-13 · SDDOT · 09FY · $12.50 per Ft · qty 72.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.