Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon10$177.38$9.50 to $997.50
Bids
  • 2025-11-19 · SDDOT · 05U4 · $48.24 per Ton · qty 2000.0 · bid tab
  • 2025-11-19 · SDDOT · 05U4 · $59.04 per Ton · qty 54243.2 · bid tab
  • 2025-11-19 · SDDOT · 05U4 · $663.82 per Ton · qty 1987.4 · bid tab
  • 2025-11-19 · SDDOT · 05U4 · $663.82 per Ton · qty 73.3 · bid tab
  • 2025-11-19 · SDDOT · 07Y4 · $740.00 per Ton · qty 492.6 · bid tab
  • 2025-11-19 · SDDOT · 07Y4 · $150.00 per Ton · qty 107.1 · bid tab
  • 2025-11-19 · SDDOT · 07Y4 · $53.11 per Ton · qty 13398.2 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $204.75 per Ton · qty 1043.7 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $9.50 per Ton · qty 184190.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $997.50 per Ton · qty 174.9 · bid tab
excavation embankmentCuYd8$16.75$4.50 to $60.00
Bids
  • 2025-11-19 · SDDOT · 05U4 · $15.00 per CuYd · qty 425.0 · bid tab
  • 2025-11-19 · SDDOT · 07Y4 · $60.00 per CuYd · qty 76.0 · bid tab
  • 2025-11-19 · SDDOT · 07Y4 · $15.00 per CuYd · qty 215.0 · bid tab
  • 2025-08-06 · SDDOT · 09MD · $36.00 per CuYd · qty 207.0 · bid tab
  • 2025-08-06 · SDDOT · 09MD · $22.00 per CuYd · qty 530.0 · bid tab
  • 2025-08-06 · SDDOT · 09MD · $18.50 per CuYd · qty 1312.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $9.25 per CuYd · qty 49309.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $4.50 per CuYd · qty 1483159.0 · bid tab
fire hydrantEach1$22,050.00$22,050.00 to $22,050.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $22,050.00 per Each · qty 22.0 · bid tab
flexible baseTon6$36.32$9.50 to $110.00
Bids
  • 2025-11-19 · SDDOT · 05U4 · $32.64 per Ton · qty 2653.3 · bid tab
  • 2025-11-19 · SDDOT · 05U4 · $9.80 per Ton · qty 1215.0 · bid tab
  • 2025-11-19 · SDDOT · 07Y4 · $40.00 per Ton · qty 728.3 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $110.00 per Ton · qty 6.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $50.00 per Ton · qty 468.7 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $9.50 per Ton · qty 145855.2 · bid tab
inlet headwallEach1$775.00$775.00 to $775.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $775.00 per Each · qty 6.0 · bid tab
lime cement stabilizationTon3$241.21$241.21 to $252.00
Bids
  • 2025-11-19 · SDDOT · 05U4 · $241.21 per Ton · qty 19.8 · bid tab
  • 2025-11-19 · SDDOT · 05U4 · $241.21 per Ton · qty 532.4 · bid tab
  • 2025-11-19 · SDDOT · 07Y4 · $252.00 per Ton · qty 132.2 · bid tab
manholeEach1$1,942.50$1,942.50 to $1,942.50
Bids
  • 2024-10-16 · SDDOT · 05HV · $1,942.50 per Each · qty 12.0 · bid tab
storm pipe 18-inchFt6$49.17$20.30 to $110.00
Bids
  • 2025-08-06 · SDDOT · 09MD · $52.00 per Ft · qty 36.0 · bid tab
  • 2025-08-06 · SDDOT · 09MD · $46.35 per Ft · qty 36.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $75.00 per Ft · qty 1344.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $110.00 per Ft · qty 1048.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $33.00 per Ft · qty 1048.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $20.30 per Ft · qty 1344.0 · bid tab
storm pipe 24-inchFt8$51.37$41.80 to $165.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $50.60 per Ft · qty 394.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $165.00 per Ft · qty 46.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $120.00 per Ft · qty 4144.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $41.80 per Ft · qty 1694.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $90.00 per Ft · qty 730.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $46.20 per Ft · qty 826.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $41.80 per Ft · qty 1184.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $52.14 per Ft · qty 730.0 · bid tab
storm pipe 30-inchFt3$60.50$60.50 to $130.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $130.00 per Ft · qty 254.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $60.50 per Ft · qty 170.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $60.50 per Ft · qty 84.0 · bid tab
storm pipe 36-inchFt2$109.05$78.10 to $140.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $140.00 per Ft · qty 180.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $78.10 per Ft · qty 180.0 · bid tab
storm pipe 42-inchFt2$123.10$101.20 to $145.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $145.00 per Ft · qty 278.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $101.20 per Ft · qty 278.0 · bid tab
storm pipe 48-inchFt4$159.50$150.00 to $176.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $150.00 per Ft · qty 392.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $176.00 per Ft · qty 64.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $165.00 per Ft · qty 224.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $154.00 per Ft · qty 104.0 · bid tab
storm pipe 60-inchFt5$302.50$225.00 to $495.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $330.00 per Ft · qty 66.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $275.00 per Ft · qty 58.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $495.00 per Ft · qty 134.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $225.00 per Ft · qty 328.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $302.50 per Ft · qty 70.0 · bid tab
storm pipe (diameter not stated)Ft2$1,375.00$550.00 to $2,200.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $550.00 per Ft · qty 92.0 · bid tab
  • 2024-10-16 · SDDOT · 05HV · $2,200.00 per Ft · qty 92.0 · bid tab
water main 16-inchFt1$131.25$131.25 to $131.25
Bids
  • 2024-10-16 · SDDOT · 05HV · $131.25 per Ft · qty 14210.0 · bid tab
water main 20-inchFt1$178.50$178.50 to $178.50
Bids
  • 2024-10-16 · SDDOT · 05HV · $178.50 per Ft · qty 520.0 · bid tab
water serviceEach1$2,940.00$2,940.00 to $2,940.00
Bids
  • 2024-10-16 · SDDOT · 05HV · $2,940.00 per Each · qty 4.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.