PadstakeGet the fee reports
Menu

Site-work prices, Harding County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon10$90.73$16.25 to $1,200.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $180.00 per Ton · qty 6093.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $1,200.00 per Ton · qty 304.6 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $22.13 per Ton · qty 1523.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $105.00 per Ton · qty 500.9 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $716.60 per Ton · qty 1061.6 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $76.46 per Ton · qty 2284.5 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $60.22 per Ton · qty 28752.3 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $16.25 per Ton · qty 2562.8 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $51.50 per Ton · qty 38716.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $825.00 per Ton · qty 1764.4 · bid tab
excavation embankmentCuYd9$15.00$1.00 to $30.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $30.00 per CuYd · qty 1360.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $1.00 per CuYd · qty 29515.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $6.00 per CuYd · qty 129457.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $12.40 per CuYd · qty 34000.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $15.00 per CuYd · qty 762.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $22.00 per CuYd · qty 190.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $18.50 per CuYd · qty 7540.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $20.00 per CuYd · qty 2321.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $15.00 per CuYd · qty 389.0 · bid tab
flexible baseTon4$28.07$17.25 to $45.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $45.00 per Ton · qty 19091.2 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $17.89 per Ton · qty 2011.2 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $17.25 per Ton · qty 4952.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $38.25 per Ton · qty 3747.0 · bid tab
inlet headwallEach3$500.00$200.00 to $2,500.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $500.00 per Each · qty 2.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $2,500.00 per Each · qty 4.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $200.00 per Each · qty 2.0 · bid tab
lime cement stabilizationAcre1$2,000.00$2,000.00 to $2,000.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $2,000.00 per Acre · qty 12.3 · bid tab
lime cement stabilizationTon2$245.28$240.55 to $250.00
Bids
  • 2024-11-20 · SDDOT · 06RR · $240.55 per Ton · qty 279.5 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $250.00 per Ton · qty 385.6 · bid tab
storm pipe 18-inchFt7$40.00$22.00 to $195.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $50.00 per Ft · qty 186.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $22.00 per Ft · qty 130.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $39.00 per Ft · qty 56.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $32.00 per Ft · qty 34.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $40.00 per Ft · qty 34.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $195.00 per Ft · qty 28.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $72.00 per Ft · qty 28.0 · bid tab
storm pipe 24-inchFt6$99.00$42.00 to $357.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $42.00 per Ft · qty 146.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $75.00 per Ft · qty 146.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $220.00 per Ft · qty 32.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $82.00 per Ft · qty 32.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $116.00 per Ft · qty 4.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $357.00 per Ft · qty 4.0 · bid tab
storm pipe 30-inchFt4$92.50$60.00 to $285.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $60.00 per Ft · qty 134.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $80.00 per Ft · qty 134.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $105.00 per Ft · qty 32.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $285.00 per Ft · qty 32.0 · bid tab
storm pipe 36-inchFt4$157.50$48.00 to $345.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $115.00 per Ft · qty 96.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $48.00 per Ft · qty 96.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $345.00 per Ft · qty 12.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $200.00 per Ft · qty 12.0 · bid tab
storm pipe 42-inchFt2$105.50$101.00 to $110.00
Bids
  • 2024-12-11 · SDDOT · 06TD · $110.00 per Ft · qty 156.0 · bid tab
  • 2024-12-11 · SDDOT · 06TD · $101.00 per Ft · qty 156.0 · bid tab
storm pipe 48-inchFt2$280.00$225.00 to $335.00
Bids
  • 2024-11-20 · SDDOT · 06RR · $225.00 per Ft · qty 12.0 · bid tab
  • 2024-11-20 · SDDOT · 06RR · $335.00 per Ft · qty 12.0 · bid tab
storm pipe (diameter not stated)Ft2$70.00$27.00 to $113.00
Bids
  • 2023-12-13 · SDDOT · 07Y2 · $113.00 per Ft · qty 240.0 · bid tab
  • 2023-12-13 · SDDOT · 07Y2 · $27.00 per Ft · qty 240.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.