PadstakeGet the fee reports
Menu

Site-work prices, Hand County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon4$232.25$53.50 to $925.00
Bids
  • 2023-11-15 · SDDOT · 06RN · $64.50 per Ton · qty 2082.9 · bid tab
  • 2023-11-15 · SDDOT · 06RN · $925.00 per Ton · qty 1352.0 · bid tab
  • 2023-11-15 · SDDOT · 06RN · $53.50 per Ton · qty 25614.1 · bid tab
  • 2023-11-15 · SDDOT · 06RN · $400.00 per Ton · qty 64.3 · bid tab
excavation embankmentCuYd16$14.76$6.00 to $30.00
Bids
  • 2026-07-15 · SDDOT · 09MP · $8.00 per CuYd · qty 2870.0 · bid tab
  • 2026-07-15 · SDDOT · 09MP · $18.50 per CuYd · qty 425.0 · bid tab
  • 2026-05-20 · SDDOT · 09MK · $6.72 per CuYd · qty 4191.0 · bid tab
  • 2026-05-20 · SDDOT · 09MK · $16.80 per CuYd · qty 515.0 · bid tab
  • 2026-04-15 · SDDOT · 09LY · $12.03 per CuYd · qty 243.0 · bid tab
  • 2025-08-26 · SDDOT · 08MQ · $15.00 per CuYd · qty 3643.0 · bid tab
  • 2025-08-26 · SDDOT · 08MQ · $24.00 per CuYd · qty 975.0 · bid tab
  • 2025-08-06 · SDDOT · 08MV · $12.55 per CuYd · qty 523.0 · bid tab
  • 2024-12-04 · SDDOT · 08MT · $6.00 per CuYd · qty 1558.0 · bid tab
  • 2024-12-04 · SDDOT · 08MT · $12.00 per CuYd · qty 354.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed)
flexible baseTon1$20.50$20.50 to $20.50
Bids
  • 2023-11-15 · SDDOT · 06RN · $20.50 per Ton · qty 2944.9 · bid tab
lime cement stabilizationTon1$235.00$235.00 to $235.00
Bids
  • 2023-11-15 · SDDOT · 06RN · $235.00 per Ton · qty 281.4 · bid tab
storm pipe 48-inchFt4$107.00$19.00 to $235.00
Bids
  • 2026-07-15 · SDDOT · 09MP · $19.00 per Ft · qty 42.0 · bid tab
  • 2026-07-15 · SDDOT · 09MP · $169.00 per Ft · qty 42.0 · bid tab
  • 2023-11-15 · SDDOT · 06RN · $45.00 per Ft · qty 60.0 · bid tab
  • 2023-11-15 · SDDOT · 06RN · $235.00 per Ft · qty 60.0 · bid tab
storm pipe (diameter not stated)Ft4$825.00$500.00 to $1,600.00
Bids
  • 2024-12-04 · SDDOT · 08MT · $950.00 per Ft · qty 42.0 · bid tab
  • 2024-12-04 · SDDOT · 08MT · $1,600.00 per Ft · qty 42.0 · bid tab
  • 2024-12-04 · SDDOT · 08MT · $700.00 per Ft · qty 42.0 · bid tab
  • 2024-12-04 · SDDOT · 08MT · $500.00 per Ft · qty 42.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.