Site-work prices, Hamlin County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon5$220.00$54.00 to $700.00
Bids
  • 2026-07-15 · SDDOT · 09TA · $220.00 per Ton · qty 207.4 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $250.00 per Ton · qty 16.8 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $100.00 per Ton · qty 79.7 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $54.00 per Ton · qty 19228.1 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $700.00 per Ton · qty 900.6 · bid tab
concrete pavementEach1$23.90$23.90 to $23.90
Bids
  • 2026-07-15 · SDDOT · 09TA · $23.90 per Each · qty 294.0 · bid tab
concrete pavementSqYd2$251.50$170.00 to $333.00
Bids
  • 2026-07-15 · SDDOT · 09TA · $170.00 per SqYd · qty 121.4 · bid tab
  • 2026-07-15 · SDDOT · 09TA · $333.00 per SqYd · qty 16.0 · bid tab
curb gutterFt1$105.00$105.00 to $105.00
Bids
  • 2024-03-20 · SDDOT · 06CW · $105.00 per Ft · qty 682.0 · bid tab
excavation embankmentCuYd6$30.67$10.00 to $495.00
Bids
  • 2026-07-15 · SDDOT · 09TA · $29.95 per CuYd · qty 22.0 · bid tab
  • 2026-07-15 · SDDOT · 09TA · $495.00 per CuYd · qty 4.0 · bid tab
  • 2026-07-15 · SDDOT · 09TA · $31.40 per CuYd · qty 102.0 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $50.00 per CuYd · qty 17.0 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $15.00 per CuYd · qty 206.0 · bid tab
  • 2023-12-06 · SDDOT · 08NK · $10.00 per CuYd · qty 5369.0 · bid tab
fire hydrantEach1$4,500.00$4,500.00 to $4,500.00
Bids
  • 2024-03-20 · SDDOT · 06CW · $4,500.00 per Each · qty 1.0 · bid tab
flexible baseTon2$56.50$24.00 to $89.00
Bids
  • 2026-07-15 · SDDOT · 09TA · $89.00 per Ton · qty 49.5 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $24.00 per Ton · qty 691.8 · bid tab
inlet headwallEach3$523.00$506.00 to $1,000.00
Bids
  • 2026-07-15 · SDDOT · 09TA · $523.00 per Each · qty 4.0 · bid tab
  • 2026-07-15 · SDDOT · 09TA · $506.00 per Each · qty 2.0 · bid tab
  • 2024-03-20 · SDDOT · 06CW · $1,000.00 per Each · qty 1.0 · bid tab
lime cement stabilizationTon1$325.00$325.00 to $325.00
Bids
  • 2024-03-20 · SDDOT · 06CW · $325.00 per Ton · qty 193.0 · bid tab
manholeEach1$1,475.00$1,475.00 to $1,475.00
Bids
  • 2024-06-05 · SDDOT · 09KF · $1,475.00 per Each · qty 10.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.