PadstakeGet the fee reports
Menu

Site-work prices, Gregory County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon6$126.28$7.73 to $1,104.16
Bids
  • 2026-05-06 · SDDOT · 067V · $48.36 per Ton · qty 42045.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $193.23 per Ton · qty 430.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $1,104.16 per Ton · qty 124.3 · bid tab
  • 2026-05-06 · SDDOT · 067V · $7.73 per Ton · qty 73026.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $914.25 per Ton · qty 2062.3 · bid tab
  • 2026-05-06 · SDDOT · 067V · $59.34 per Ton · qty 1278.0 · bid tab
excavation embankmentCuYd3$8.23$3.31 to $15.00
Bids
  • 2026-05-06 · SDDOT · 067V · $3.31 per CuYd · qty 217605.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $15.00 per CuYd · qty 585.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $8.23 per CuYd · qty 116239.0 · bid tab
flexible baseTon2$17.14$6.62 to $27.67
Bids
  • 2026-05-06 · SDDOT · 067V · $6.62 per Ton · qty 62514.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $27.67 per Ton · qty 2606.0 · bid tab
lime cement stabilizationAcre1$441.67$441.67 to $441.67
Bids
  • 2026-05-06 · SDDOT · 067V · $441.67 per Acre · qty 10.0 · bid tab
lime cement stabilizationTon1$380.77$380.77 to $380.77
Bids
  • 2026-05-06 · SDDOT · 067V · $380.77 per Ton · qty 428.7 · bid tab
manholeEach1$1,205.75$1,205.75 to $1,205.75
Bids
  • 2026-05-06 · SDDOT · 067V · $1,205.75 per Each · qty 4.0 · bid tab
storm pipe 18-inchFt4$45.00$30.92 to $66.25
Bids
  • 2026-05-06 · SDDOT · 067V · $56.88 per Ft · qty 20.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $30.92 per Ft · qty 394.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $33.12 per Ft · qty 394.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $66.25 per Ft · qty 20.0 · bid tab
storm pipe 24-inchFt4$39.64$38.20 to $49.69
Bids
  • 2026-05-06 · SDDOT · 067V · $38.20 per Ft · qty 390.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $49.69 per Ft · qty 390.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $40.85 per Ft · qty 612.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $38.42 per Ft · qty 612.0 · bid tab
storm pipe 30-inchFt4$66.25$52.45 to $80.60
Bids
  • 2026-05-06 · SDDOT · 067V · $52.45 per Ft · qty 504.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $80.60 per Ft · qty 104.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $55.21 per Ft · qty 504.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $77.29 per Ft · qty 104.0 · bid tab
storm pipe 42-inchFt2$87.78$82.81 to $92.75
Bids
  • 2026-05-06 · SDDOT · 067V · $82.81 per Ft · qty 112.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $92.75 per Ft · qty 112.0 · bid tab
storm pipe 48-inchFt2$113.20$110.42 to $115.99
Bids
  • 2026-05-06 · SDDOT · 067V · $110.42 per Ft · qty 108.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $115.99 per Ft · qty 108.0 · bid tab
storm pipe (diameter not stated)Ft4$380.38$16.56 to $1,877.08
Bids
  • 2026-05-06 · SDDOT · 067V · $143.54 per Ft · qty 983.5 · bid tab
  • 2026-05-06 · SDDOT · 067V · $617.23 per Ft · qty 82.0 · bid tab
  • 2026-05-06 · SDDOT · 067V · $16.56 per Ft · qty 983.5 · bid tab
  • 2026-05-06 · SDDOT · 067V · $1,877.08 per Ft · qty 82.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.